NRC Generic Letter 1983-30

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1983-030: Deletion of Standard Technical Specification Surveillance Requirement 4.8.1.1.2.d.6 for Diesel Generator Testing
ML031080507
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000514, 05000000, 05000496, 05000497, 05000515, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Clinch River, Skagit, Marble Hill, Black Fox
Issue date: 07/21/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-83-030, NUDOCS 8306270411
Download: ML031080507 (2)


' JUL 2i 1983'

TO ALL HOLDERS OF OPERATING LICENSES, APPLICANTS FOR OPERATING LICENSES

AND HOLDERS OF CONSTRUCTION PERMITS FOR POWER REACTORS

Gentlemen:

Subject: Deletion of Standard Technical Specification Surveillance Requirement 4.8.1.1.2.d.6 for Diesel Generator Testing

.(Generic Letter No. 83-30 )

It has come to our attention that diesel generator Surveillance Requirement 4.8.1.1.2.d.6 in the Standard Technical Specifications (STS) should be deleted.

The current revision of the STS for all power reactors is not consistent with the provisions of GDC 17, Regulatory Guide 1.108 and the NRC Standard Review Plans (SRPs 8.2 and 8.3.1). In order to rectify this inconsistency, the Surveillance Requirements for diesel generator testing have been modified to delete a requirement which is In excess of the scope of GDC 17.

We have enclosed the revised Surveillance Requirements for diesel generator testing that are to be used in your submittal of proposed Technical Specifi- cations, or, if your proposed Technical Specifications have already been submitted, the staff will make the necessary revisions. If you already hold a operating license which includes this Surveillance Requirement, you may propose an amendment to your Technical Specifications In accordance with the enclosed revised Surveillance Requirements. These changes will be incorporated in the next revision of the STS for all power reactors. The generic changes are indicated by a line in the margin of the Surveillance Requi rements.

This request has been approved by OMB Clearance Number 3150-0011 which expires t::Apri 1 30, 1985.

i 3 8ginal Signed by

.'ert A. Purple

8306270411 '//Darrell G. Elsenhut, Director Division of Licensing Enclosure:

  • Revised Surveillance Requirements for Diesel Generator Testing"

De tpJ X

@v6<F~f /

t~ A ft SSPB:DLt' SSPB:DLO V SypB:DL :DL

OFFICE  : ............ ... . . ....... ... . .. .. .

SURNAME

DHoffmadfF1cab DBrinkman

> .......... .. . ..... ...... ........ ... . .... ...

C& ink Saglia

.... ..... ..... . .. .... ... . .. . .4.:.

isenhut....... a.. .. . ... . ..... ..... ..... ........ ... ......... ...

OATE 6/ if /83 6/)q/83 6/. /83 t83 NRC ~ (1040) NRCM 0240......OF......C..AL..

FORM 318 ...... RECORD... COPY ... ................. 8.........

OFFICIAL RECORD COPY USGPO: 1981-33960

NRC FORM 318 (1G-8D) NRCM 0240

ENCLOSURE

Revised Sirveillance Requirements for Diesel Generator Testing

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. (No change)

b. (No change)

c. (No change)

d. At least once per 18 months during shutdown by:

1. (No change)

2. (No change)

3. (No change)

4. (No change)

5. (No change)

6. Delete Surveillance Requirement which reads:

"Verifying that on a simulated loss of the diesel generator, with offsite power not available, the loads are shed from the emergency busses and that subsequent loading of the diesel generator is in accordance with design requirements."

6. (Was Item 7 - no change)

7. (Was Item 8 - no change)

8. (Was Item 9 - no change)

9. (Was Item 10 - no change)

10. (Was Item 11 - no change)

11. (Was Item 12 - no change)

12. (Was Item 13 - no change)

13. (Was Item 14 - no change)

e. (No-change)

f. (No change)

p.

Template:GL-Nav