NRC Generic Letter 1982-002: Nuclear Power Plant Staff Working Hours| ML031080258 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Sterling, Robinson, Clinton, South Texas, San Onofre, Cook, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000514, 05000363, 05000599, 05000000, 05000515, 05000502, 05000600, 05000452, Zimmer, 05000471, 05000453, 05000516, 05000517, 05000376, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Bailly, Allens Creek, Perkins, Cherokee, Black Fox, Hartsville, Phipps Bend, Yellow Creek, Crane |
|---|
| Issue date: |
02/08/1982 |
|---|
| From: |
Eisenhut D Office of Nuclear Reactor Regulation |
|---|
| To: |
|
|---|
| References |
|---|
| NUREG-0737 GL-82-002, NUDOCS 8202120001 |
| Download: ML031080258 (2) |
|
Similar Documents at Beaver Valley, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Sterling, Robinson, Clinton, South Texas, San Onofre, Cook, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000514, 05000363, 05000599, 05000000, 05000515, 05000502, 05000600, 05000452, Zimmer, 05000471, 05000453, 05000516, 05000517, 05000376, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Bailly, Allens Creek, Perkins, Cherokee, Black Fox, Hartsville, Phipps Bend, Yellow Creek, Crane |
|---|
Category:NRC Generic Letter
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Sterling]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000514]] OR [[:05000363]] OR [[:05000599]] OR [[:05000000]] OR [[:05000515]] OR [[:05000502]] OR [[:05000600]] OR [[:05000452]] OR [[:Zimmer]] OR [[:05000471]] OR [[:05000453]] OR [[:05000516]] OR [[:05000517]] OR [[:05000376]] OR [[:Fort Saint Vrain]] OR [[:Washington Public Power Supply System]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Bailly]] OR [[:Allens Creek]] OR [[:Perkins]] OR [[:Cherokee]] OR [[:Black Fox]] OR [[:Hartsville]] OR [[:Phipps Bend]] OR [[:Yellow Creek]] OR [[:Crane]] </code>. |
II
- . i I
4 Z- j Distribution:
February 8, 1982 Central Files DL/RF
MWilliams HThompson
.J
TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING
LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS
Gentlemen:
SubJect: Nuclear Power Plant Staff Working Hours (Generic Letter No. 82-02)
The Commission has issued the attached policy statement on factors causing fatigue of operating personnel at nuclear reactors. It is being sent to you at this time for your information.
As part of the implementation of this policy statement, we are revising Regulatory Guide 1.33 and NUREG-0737 (Item I.A.1.3) to reflect the policy. In addition, we will be requesting all licensees to revise the administrative section of their technical specifications to require that administrative procedures follow the policy statement guidelines and that authorized deviations to the working hours guidelines be documented and available for NRC review. We will be contacting each licensee by separate letter once the Regulatory Guide and NUREG 0737 revisions have been completed (presently estimated for March 1982).
original signedbV
Darrell G. Eisenbt Darrell G. Eisenhut, Director Division of Licensing Enclosure: Policy Statement
8202120001 j'/ f0
8202120001 820208 PDR ADOCK ° .
P PDR
OFFIC . ............. . ... .... .......... ff . .. ..... ............. ..................... ..................... ....................
..............
SURNAME. h ............................................ ....................
DATEt 2l ... /.II8 ..... .___
... ___ ____ ________ __ _ _ _ _ ___
F R IR 318110. 0.. 0 2 0AFF .. .. .. ... I I A. I.. RE C OR CO .. P.....
Y .. .. .. ... .. .. .. .. ... .. .. .. ... .. .. .. ..
- US;PO: 1980-329-824 NRC FORM 3i8110/80) NRCM 0240 O FFICIA L RE-C O RD C OPY
POLICY ON FACTORS CAUSING FATIGUE Or OPERATING
PERSONNEL AT NUCLEAR REACTORS
operating Licensees of operating plants and applicants for situations where
- licenses shall establish controls to prevent of operating personnel to fatigue could reduce the ability should keep the reactor in a safe condition. The controls job- focus on shift staffing and the use of overtime--key related factors that influence fatigue.
that, to the The objective of the controls would be to assure shift to extent practicable, personnel are not assigned significantly duties while in a fatigued condition that could making reduce their mental alertness or their decision staff who capability. The controls shall apply to the plant reactor perform safety-related functions (e.g., senior auxiliary operators, reactor operators, health physicists, operators, and key maintenance personnel).
to maintain Enough plant operating personnel should be employed of overtime.
adequate shift coverage without routine heavy use substantial unforeseen problems require However, in the event that the following on a temporary basis, amounts of overtime to be used, guidelines shall be followed:
than a. An individual should not be permitted to work more
16 h6urs straight (excluding shift turnover time).
than b. An individual should not be permitted to work more more than 24 hours
16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven day period (all excluding shift turnover time).
c. A break of at least eight hours should be allowed between work periods (including shift turnover time).
d. The use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Recognizing that very unusual circumstances may arise deviation requiring deviation from the above guidelines, such or the plant manager or his deputy, shall be authorized by higher levels of management. The paramount consideration in the in such authorization shall be that significant reductions unlikely.
effectiveness of operating personnel would be highly In addition, procedures are encouraged that would allow relieved licensed operators at the controls to be periodically during from the control board and assigned to other duties away their tour of duty.