NRC Generic Letter 1980-55

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1980-055: Transmittal of IE Bulletin1980-015, Possible Loss of Emergency Notification System (ENS) with Loss of Off-Site Power.
ML031350404
Person / Time
Issue date: 06/18/1980
From: Grier B
NRC Region 1
To:
References
BL-80-015 GL-80-055, NUDOCS 8007020710
Download: ML031350404 (6)


RG& UNITED STATES a

9A*°- CLEAR REGULATORY COMMISSION

-REGION I

631 PARK AVENUE

KING Of PRUSSIA, PENNSYLVANIA 19406 June 18, 1980

Docket Nos. 50-03

50-247 Consolidated Edison Company of New York, Inc.

ATTN: Mr. W. J. Cahill, Jr.

Vice President

4 Irving Place New York, New York 10003 Gentlemen:

The enclosed IE Bulletin No. 80-15, "Possible Loss of Emergency Notification System (ENS) With Loss of Off-Site Power," is forwarded to you for action. A

written response is required.

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s)

required by the Bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

4A.rkv grce H. Grier Director Enclosures:

1. IE Bulletin No. 80-15

2. List of Recently Issued IE Bulletins

CONTACT

Dr. C. 0. Gallina

(215-337-5350)

cc w/encls:

L. 0. Brooks, Project Manager, IP Nuclear W. Monti, Manager - Nuclear Power Generation Department M. Shatkouski, Plant Manager J. M. Makepeace, Director, Technical Engineering W. 0. Hamlin, Assistant to Resident Manager J. 0. Block, Esquire, Executive Vice President -. Administration Joyce P. Davis, Esquire

8 0070 2 09 (&

UNITED STATES SSINS No.: 6820

NUCLEAR REGULATORY COMMISSION Accessions No.:

OFFICE OF INSPECTION AND ENFORCEMENT 8005050072 WASHINGTON, D.C. 20555 June 18, 1980

IE Bulletin No. 80-15 POSSIBLE LOSS OF EMERGENCY NOTIFICATION SYSTEM (ENS) WITH LOSS OF OFFSITE POWER

Inthe past year, there have been two occurrences where a loss of off-site power has resulted in a loss of communications between a power reactor facility and the NRC Operations Center via the Emergency Notification System (ENS). The most recent occurrence was at Indian Point Unit 2 on June 3, 1980.

The earlier event occurred at the Davis Besse facility on October 15, 1979 and resulted in the issuance of IE Circular 80-09.

The installation of the ENS requires a station package which operates on

110 VAC. In some cases, the station package is located at the local telephone company which supplies the required power for normal operation and emergency power for operation during abnormal occurrences, but in many cases, the package is located at the site and is served by on-site power. In some cases where the station package is served by on-site power, the station package has not been backed up by emergency power.

NRC data indicate that the station packages are powered in the manner described in the enclosures.

Actions to be taken by all licensees:

1. Within 10 days of the date of this Bulletin determine by direct inspection, in conjunction with the appropriate telephone company representative, the manner inwhich the ENS at your facility is powered.

2. Those facilities which have station packages requiring on-site power, but which are not connected to a safeguards instrumentation bus which is backed up by batteries and an inverter or equally reliable power supply, shall make necessary modifications and provide such a connection.

3. All facilities are to develop and conduct a test, within 60 days of the issuance of this Bulletin to verify that all extensions of the ENS located at your facility ties) would remain fully operable from the facility(ies) to the NtC Operations Center inthe event of a loss of offsite power to your facilityties). This is not intended to mean that an actual loss of offsite power be executed.

IE Bulletin No. 80-15 June 18, 1980 4. If it is determined that a station package requiring on-site power is not connected to a safeguards instrumentation bus backed up by automatic transfer to batteries and an inverter or an equally reliable power supply, notify the NRC Operations Center via the ENS

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after such determination.

5. Prepare and issue an administrative procedure or directive which requires notification to the NRC Operations Center by commercial telephone or relayed message within one hour of the time that one or more extensions of the ENS located at your facility(ies)

is subsequently found to be inoperable for any reason.

6. Provide a written report, within 75 days of the issuance of this Bulletin, describing the result of the reviews required by items 1 and 2 above, the results of the testing required by item 3 and the procedures required by item 5.

This information is requested under the provisions of 10 CFR 50.54(f).

Accordingly, you are requested to provide within the time periods specified in item 6 above, written statements of the above information, signed under oath or affirmation.

Reports shall be submitted to the Director of the appropriate NRC Regional Office and a copy forwarded to the Director, NRC Office of Inspection and Enforcement, Washington, D.C. 20555.

Approved by GAO, B180225 (R0072): clearance expires 7-31-80. Approval was given under a blanket clearance specifically for identified generic problems.

Enclosures:

1. Facilities With ENS Powered By Local Telephone Company

2. Facilities With ENS Powered Using On-Site Power

Facilities With ENS Powered By Local Telephone Company Region I

B&W Leechburg/Apollo Beaver Valley 1 Calvert Cliffs 1 & 2 Fitzpatrick Ginna Indian Point 2 Indian Point 3 Millstone 1 & 2 NFS-West Valley Nine Mile Point 1 Three Mile Island 1 & 2 TI-Attleboro Westinghouse Cheswick Region II

Hatch 1 & 2 NFS-Erwin Region III

Cook 1 & 2 Dresden 1, 2 & 3 Duane Arnold Kerr McGee Cresent La Crosse Monticello Palisades Point Beach 1 & 2 Quad Cities 1 & 2 Region V

Exxon Richland General Atomics LaJolla Rockwell Canoga Park San Onofre Trojan Enclosure 1

Facilities With ENS Powered Using On-Site Power Region I

Haddam Neck Maine Yankee Oyster Creek Peach Bottom 2 & 3 Pilgrim 1 Salem 1 & 2 UNC-Montville UNC-Wood River Junction Vermont Yankee Yankee Rowe Region II

B&W LRC-Lynchburg B&W Navy-Lynchburg Browns Ferry 1, 2 & 3 Brunswick 1 & 2 Crystal River Farley 1 North Anna 1 & 2 Oconee 1, 2 & 3 Robinson 2 Sequoyah 1 St. Lucie 1 Surry 1 & 2 Turkey Point 3 & 4 Region III

Big Rock Point Davis-Besse Kewaunee Prairie Island 1 & 2 Zion 1 & 2 Region IV

Arkansas Nuclear One, 1 & 2 Cooper Fort Calhoun Fort St. Vrain Region V

Diablo Canyon Rancho Seco Enclosure 2

IE Bulletin No. 80-15 Enclosure 2 June 18, 1980

RECENTLY ISSUED

IE BULLETINS

Bulletin Subject Date Issued Issued To No.

80-14 Degradation of Scram 6/12/80 All BWR's with an Discharge Volume Capability OL

80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers ,- OL

80-12 Decay Heat Removal System 5/9/80 Each PWR with an OL

Operability

80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL, except Trojan

80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for OL or CP

Unmonitored, Uncontrolled Release to Environment

80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and a holders of power reactor construction permits

80-08 Examination of Containment 4/7/80 All power reactors with Liner Penetration Welds a CP and/or OL no later than April 7, 1980

80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL

79-03A Longitudinal Weld Defects 4/4/80 All power reactor In ASME SA-312 Type 304 facilities with an Stainless Steel Pipe OL or CP

80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL

80-05 Vacuum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup OLs' and to those with Tanks a CP

Template:GL-Nav