Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC May 1,2007 NRC 2007-0026 GL-2003-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Generic Letter 2003-01, Control Room Habitabilitv Regulatory Commitment Change

References:

1) Letter from NMC to NRC dated August 11,2003 (ML032580984)
2) Letter from NMC to NRC dated December 5,2003 (ML033500466)
3) Letter from NMC to NRC dated September 29,2004 (ML042820156)
4) Letter from NMC to NRC dated August 22,2005 (ML052420480)
5) Letter from NMC to NRC dated December 8,2006 (ML063420598)
6) Letter from NRC to NMC dated January 5,2007 (ML063480040)

In Reference 1, Nuclear Management Company, LLC (NMC), provided the 60-day response to Generic Letter (GL) 2003-01 for PBNP. The letter included responses to ltems I(b), 2 and 3 of that letter and commitments to provide schedules for responses to ltems I(a) and 1(c). The basis for the commitments was the need to conduct a control room envelope (CRE) baseline integrated unfiltered in-leakage test.

Reference 2 provided the preliminary results for unfiltered in-leakage into the CRE as less than 100 scfm while the control room ventilation system is operating in the emergency mode assumed in the radiological accident analysis. Schedules for providing the final CRE unfiltered in-leakage results and responses to ltems 1(a) and 1(c) were also provided as new commitments. Reference 3 revised the commitment dates provided in Reference 2. The final measured control room envelope unfiltered in-leakage value was provided to the NRC in Reference 4.

6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

Document Control Desk Page 2 On October 24,2006, a teleconference was held between NRC and NMC representative to discuss previous NMC responses to GL 2003-01. During this discussion, NMC agreed to submit a supplemental response to the NRC providing additional information regarding GL 2003-01 Questions 1 and I(a). Reference 5 supplemented the response to Questions 1 and I(a) and provided the following commitment:

"NMC will submit a license amendment request to the NRC revising the current accident analysis for PBNP to demonstrate compliance with the dose limits of 10 CFR 50, Appendix A, GDC-19, using the Alternative Source Term by July 30, 2007. As part of this submittal, the post-accident reliance on KI for control room staff will be addressed."

In Reference 6, the NRC closed GL 2003-01 referencing NMC's commitments to submit license amendment requests to revise the current accident analysis for PBNP using the AST methodology and to reference an acceptable surveillance methodology based on TSTF-448, following NRC approval.

Summarv of Commitments The following revises the commitment date as stated in Reference 3. The proposed commitment change was discussed with the PBNP NRC Project Manager on March 28,2007:

"NMC will provide Technical Specification changes to reference an acceptable surveillance methodology (and plans for any associated plant modifications to the CRE) to support requested information in GL 2003-01, Item (c), for PBNP no later than 180 days following NRC approval of TSTF-448."

Dennis L. Koehl B

Site Vice-President, Point each Nuclear Plant Nuclear Management Company, LLC cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

Text

Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC May 1,2007 NRC 2007-0026 GL-2003-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Generic Letter 2003-01, Control Room Habitabilitv Regulatory Commitment Change

References:

1) Letter from NMC to NRC dated August 11,2003 (ML032580984)
2) Letter from NMC to NRC dated December 5,2003 (ML033500466)
3) Letter from NMC to NRC dated September 29,2004 (ML042820156)
4) Letter from NMC to NRC dated August 22,2005 (ML052420480)
5) Letter from NMC to NRC dated December 8,2006 (ML063420598)
6) Letter from NRC to NMC dated January 5,2007 (ML063480040)

In Reference 1, Nuclear Management Company, LLC (NMC), provided the 60-day response to Generic Letter (GL) 2003-01 for PBNP. The letter included responses to ltems I(b), 2 and 3 of that letter and commitments to provide schedules for responses to ltems I(a) and 1(c). The basis for the commitments was the need to conduct a control room envelope (CRE) baseline integrated unfiltered in-leakage test.

Reference 2 provided the preliminary results for unfiltered in-leakage into the CRE as less than 100 scfm while the control room ventilation system is operating in the emergency mode assumed in the radiological accident analysis. Schedules for providing the final CRE unfiltered in-leakage results and responses to ltems 1(a) and 1(c) were also provided as new commitments. Reference 3 revised the commitment dates provided in Reference 2. The final measured control room envelope unfiltered in-leakage value was provided to the NRC in Reference 4.

6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

Document Control Desk Page 2 On October 24,2006, a teleconference was held between NRC and NMC representative to discuss previous NMC responses to GL 2003-01. During this discussion, NMC agreed to submit a supplemental response to the NRC providing additional information regarding GL 2003-01 Questions 1 and I(a). Reference 5 supplemented the response to Questions 1 and I(a) and provided the following commitment:

"NMC will submit a license amendment request to the NRC revising the current accident analysis for PBNP to demonstrate compliance with the dose limits of 10 CFR 50, Appendix A, GDC-19, using the Alternative Source Term by July 30, 2007. As part of this submittal, the post-accident reliance on KI for control room staff will be addressed."

In Reference 6, the NRC closed GL 2003-01 referencing NMC's commitments to submit license amendment requests to revise the current accident analysis for PBNP using the AST methodology and to reference an acceptable surveillance methodology based on TSTF-448, following NRC approval.

Summarv of Commitments The following revises the commitment date as stated in Reference 3. The proposed commitment change was discussed with the PBNP NRC Project Manager on March 28,2007:

"NMC will provide Technical Specification changes to reference an acceptable surveillance methodology (and plans for any associated plant modifications to the CRE) to support requested information in GL 2003-01, Item (c), for PBNP no later than 180 days following NRC approval of TSTF-448."

Dennis L. Koehl B