MONTHYEARNRC 2007-0026, Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change2007-05-0101 May 2007 Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change Project stage: Request NRC 2007-0056, Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change2007-07-0606 July 2007 Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change Project stage: Request NRC 2007-0079, Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change.2007-09-0505 September 2007 Generic Letter 2003-01, Control Room Habitability Regulatory Commitment Change. Project stage: Request NRC 2008-0004, Withdrawal of License Amendment Request 241, Alternative Source Term2008-01-30030 January 2008 Withdrawal of License Amendment Request 241, Alternative Source Term Project stage: Withdrawal ML0812700752008-06-18018 June 2008 Audit of the Licensee'S Mgmnt of Regulatory Commitments Project stage: Other 2007-09-05
[Table View] |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] |
Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC May 1,2007 NRC 2007-0026 GL-2003-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Generic Letter 2003-01, Control Room Habitabilitv Regulatory Commitment Change
References:
- 1) Letter from NMC to NRC dated August 11,2003 (ML032580984)
- 2) Letter from NMC to NRC dated December 5,2003 (ML033500466)
- 3) Letter from NMC to NRC dated September 29,2004 (ML042820156)
- 4) Letter from NMC to NRC dated August 22,2005 (ML052420480)
- 5) Letter from NMC to NRC dated December 8,2006 (ML063420598)
- 6) Letter from NRC to NMC dated January 5,2007 (ML063480040)
In Reference 1, Nuclear Management Company, LLC (NMC), provided the 60-day response to Generic Letter (GL) 2003-01 for PBNP. The letter included responses to ltems I(b), 2 and 3 of that letter and commitments to provide schedules for responses to ltems I(a) and 1(c). The basis for the commitments was the need to conduct a control room envelope (CRE) baseline integrated unfiltered in-leakage test.
Reference 2 provided the preliminary results for unfiltered in-leakage into the CRE as less than 100 scfm while the control room ventilation system is operating in the emergency mode assumed in the radiological accident analysis. Schedules for providing the final CRE unfiltered in-leakage results and responses to ltems 1(a) and 1(c) were also provided as new commitments. Reference 3 revised the commitment dates provided in Reference 2. The final measured control room envelope unfiltered in-leakage value was provided to the NRC in Reference 4.
6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
Document Control Desk Page 2 On October 24,2006, a teleconference was held between NRC and NMC representative to discuss previous NMC responses to GL 2003-01. During this discussion, NMC agreed to submit a supplemental response to the NRC providing additional information regarding GL 2003-01 Questions 1 and I(a). Reference 5 supplemented the response to Questions 1 and I(a) and provided the following commitment:
"NMC will submit a license amendment request to the NRC revising the current accident analysis for PBNP to demonstrate compliance with the dose limits of 10 CFR 50, Appendix A, GDC-19, using the Alternative Source Term by July 30, 2007. As part of this submittal, the post-accident reliance on KI for control room staff will be addressed."
In Reference 6, the NRC closed GL 2003-01 referencing NMC's commitments to submit license amendment requests to revise the current accident analysis for PBNP using the AST methodology and to reference an acceptable surveillance methodology based on TSTF-448, following NRC approval.
Summarv of Commitments The following revises the commitment date as stated in Reference 3. The proposed commitment change was discussed with the PBNP NRC Project Manager on March 28,2007:
"NMC will provide Technical Specification changes to reference an acceptable surveillance methodology (and plans for any associated plant modifications to the CRE) to support requested information in GL 2003-01, Item (c), for PBNP no later than 180 days following NRC approval of TSTF-448."
Dennis L. Koehl B
Site Vice-President, Point each Nuclear Plant Nuclear Management Company, LLC cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW
Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC May 1,2007 NRC 2007-0026 GL-2003-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Generic Letter 2003-01, Control Room Habitabilitv Regulatory Commitment Change
References:
- 1) Letter from NMC to NRC dated August 11,2003 (ML032580984)
- 2) Letter from NMC to NRC dated December 5,2003 (ML033500466)
- 3) Letter from NMC to NRC dated September 29,2004 (ML042820156)
- 4) Letter from NMC to NRC dated August 22,2005 (ML052420480)
- 5) Letter from NMC to NRC dated December 8,2006 (ML063420598)
- 6) Letter from NRC to NMC dated January 5,2007 (ML063480040)
In Reference 1, Nuclear Management Company, LLC (NMC), provided the 60-day response to Generic Letter (GL) 2003-01 for PBNP. The letter included responses to ltems I(b), 2 and 3 of that letter and commitments to provide schedules for responses to ltems I(a) and 1(c). The basis for the commitments was the need to conduct a control room envelope (CRE) baseline integrated unfiltered in-leakage test.
Reference 2 provided the preliminary results for unfiltered in-leakage into the CRE as less than 100 scfm while the control room ventilation system is operating in the emergency mode assumed in the radiological accident analysis. Schedules for providing the final CRE unfiltered in-leakage results and responses to ltems 1(a) and 1(c) were also provided as new commitments. Reference 3 revised the commitment dates provided in Reference 2. The final measured control room envelope unfiltered in-leakage value was provided to the NRC in Reference 4.
6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
Document Control Desk Page 2 On October 24,2006, a teleconference was held between NRC and NMC representative to discuss previous NMC responses to GL 2003-01. During this discussion, NMC agreed to submit a supplemental response to the NRC providing additional information regarding GL 2003-01 Questions 1 and I(a). Reference 5 supplemented the response to Questions 1 and I(a) and provided the following commitment:
"NMC will submit a license amendment request to the NRC revising the current accident analysis for PBNP to demonstrate compliance with the dose limits of 10 CFR 50, Appendix A, GDC-19, using the Alternative Source Term by July 30, 2007. As part of this submittal, the post-accident reliance on KI for control room staff will be addressed."
In Reference 6, the NRC closed GL 2003-01 referencing NMC's commitments to submit license amendment requests to revise the current accident analysis for PBNP using the AST methodology and to reference an acceptable surveillance methodology based on TSTF-448, following NRC approval.
Summarv of Commitments The following revises the commitment date as stated in Reference 3. The proposed commitment change was discussed with the PBNP NRC Project Manager on March 28,2007:
"NMC will provide Technical Specification changes to reference an acceptable surveillance methodology (and plans for any associated plant modifications to the CRE) to support requested information in GL 2003-01, Item (c), for PBNP no later than 180 days following NRC approval of TSTF-448."
Dennis L. Koehl B