NRC-90-0064, Monthly Operating Rept for Mar 1990 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1990 for Fermi 2
ML20042E538
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/31/1990
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0064, CON-NRC-90-64, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9004230559
Download: ML20042E538 (4)


Text

..

.i L j..

V b PS dCn

. Nuclear Opetahons.

MO.l.l Reg Guide 1.16 r.rme r

-C ISOn arrawa*"ghway

. Nuclear.

=

6400 North Dime H L

o-"a" April 16, 1990 i

NRC-90-0064 i

l J

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 l

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43 r

Subject:

Monthly Operating Status Report for.

6 March. 1990 Enclosed for your information and-use is the Ferai2 Monthly Operating Status Report for March,-1990.; This report includes the Operating. Data Report, Average' Daily Unit Power Level, and-the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Patricia Anthony at.

(313) 586-1617.

Sincerely,

{

1 l

W. S. Orser Vice President U

Nuclear Operations l

r Enclosure cc:

A. B. Davis U

l J. R. Eckert r

L D. R. Hahn R. W. DeFayette/W. L. Axelson i=

T.'R. Quay-W. G. Rogers l'

ci

.q

~

9004230559 900331

]

ADOCK05000,gi DR

].

s OPERATING DATA REPORT e

DOCKET NO. 50-341' COMPLETED BY P. M. Anthony DATE April-16, 1990 TELEPHONE (313) 586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

l 2.

REPORTING PERIOD:' March, 1990 l

-l 1

3 LICENSED THERMAL POWER (MWt): 3293 l

l.

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l

- l 5.

DESIGN ELSCT RATING (Net MWe): 1067 l

l 6.

MAX DEPENDABLE CAP (GROSS MWe): 1134 l

1-7.

MAX DEPENDABLE CAP (Net MWE):

1047 l

-l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Lines 5 through 7 revised based on ECAR I

testing, j

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):-

None 10.~ REASONS FOR RESTRICTION, IF,ANY:

None THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 2160 19,166
12. HRS REACTOR WAS CRITICAL 744 2160 13,256.9
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 744-2160 12.456.8
15. UNIT RESERVE SHUTDCWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 2,413,032 6.895,800 36,257,762
17. GROSS ELECT ENERGY GEN (MWH) 815,670 2.330,000 12,074,357'
18. NET ELECT ENERGY GEN (MWH).

782,916 2,235,906

.11,548,757

19. UNIT SERVICE FACTOR 100 100 65 0.
20. UNIT AVAILABILITY FACTOR 100 100 65.0
21. UNIT CAP FACTOR (USING MDC NET) 100.5 101.4 57.6-

.22. UNIT CAP FACTOR (USING DER NET) 98.6 97.6 55.3

23. UNIT FORCED OUTAGE RATE O

O 15 1 i

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) f None.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A-N/A

'i

I o!

t AVERAGE DAILY, WIT POWER LEVEL l

DOCKET NO.

50-341 e

UNIT FERMI 2 DATE April 16, 1990 00NPLETED BY E. Dawson--

TELEPHONE (313) 586-5027 Month March, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE'I)AILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1074 17

'1059 2

1038 18 1067 3

1076 19 1074 4

1080 20 1074 q

5 1076 21 1070 6

1078 22 1063~-

7 1071 23 1049 8

1069 24

--1080 9

1039 25 1075' 10 1066' 26 1077 J

11 1068 27 1078 12 1046 28-1077 13 -

1048 29.

1072 14 1048 30 1062 15 1040 31

-731 16 1030

UNIT SHUTDOWNS AND POWEst REDUCTIONS

  • p DOCKET NO.

50-341 DATE April 16. 1990 UNIT NAME Fermi 2 COMPLETED BV P.

M.

Anthony TELEPHONE (313)586-1617 REPORT MONTH March. 1990 L

.l METHOD OF LER SYS COMP CAUS$ & CORRECTIVE l

NO.

DATE TYPE DUR REASON SHUTTING DOWN NO.

CODE CODE ACTION TO PREVENT l

(1)

(HRS)

(2)

THE REACTOR (4)

(5)

RECURRENCE (3)90-003 03/31/90 5

8 5

Reduced power to perform weekly' l Turbine Steam valve surveillance and then continued to approximately

)

60% power for control rod sequence l

exchange and scram timing.

I (1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL' FOR PREPARATION OF DATA B - MAINTENANCE OR TEST.

2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING &' LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAME SOURCE o

.~.v

.. n n&