Text
..
.i L j..
V b PS dCn
. Nuclear Opetahons.
MO.l.l Reg Guide 1.16 r.rme r
-C ISOn arrawa*"ghway
. Nuclear.
=
6400 North Dime H L
o-"a" April 16, 1990 i
l J
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 l
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43 r
Subject:
Monthly Operating Status Report for.
6 March. 1990 Enclosed for your information and-use is the Ferai2 Monthly Operating Status Report for March,-1990.; This report includes the Operating. Data Report, Average' Daily Unit Power Level, and-the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Patricia Anthony at.
(313) 586-1617.
Sincerely,
{
1 l
W. S. Orser Vice President U
Nuclear Operations l
r Enclosure cc:
A. B. Davis U
l J. R. Eckert r
L D. R. Hahn R. W. DeFayette/W. L. Axelson i=
T.'R. Quay-W. G. Rogers l'
ci
.q
~
9004230559 900331
]
ADOCK05000,gi DR
].
- s OPERATING DATA REPORT e
DOCKET NO. 50-341' COMPLETED BY P. M. Anthony DATE April-16, 1990 TELEPHONE (313) 586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
l 2.
REPORTING PERIOD:' March, 1990 l
-l 1
3 LICENSED THERMAL POWER (MWt): 3293 l
l.
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l
- l 5.
DESIGN ELSCT RATING (Net MWe): 1067 l
l 6.
MAX DEPENDABLE CAP (GROSS MWe): 1134 l
1-7.
MAX DEPENDABLE CAP (Net MWE):
1047 l
-l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Lines 5 through 7 revised based on ECAR I
- testing, j
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):-
None 10.~ REASONS FOR RESTRICTION, IF,ANY:
None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 2160 19,166
- 12. HRS REACTOR WAS CRITICAL 744 2160 13,256.9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 744-2160 12.456.8
- 15. UNIT RESERVE SHUTDCWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 2,413,032 6.895,800 36,257,762
- 17. GROSS ELECT ENERGY GEN (MWH) 815,670 2.330,000 12,074,357'
- 18. NET ELECT ENERGY GEN (MWH).
782,916 2,235,906
.11,548,757
- 19. UNIT SERVICE FACTOR 100 100 65 0.
- 20. UNIT AVAILABILITY FACTOR 100 100 65.0
.22. UNIT CAP FACTOR (USING DER NET) 98.6 97.6 55.3
- 23. UNIT FORCED OUTAGE RATE O
O 15 1 i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) f None.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A-N/A
'i
I o!
t AVERAGE DAILY, WIT POWER LEVEL l
DOCKET NO.
50-341 e
UNIT FERMI 2 DATE April 16, 1990 00NPLETED BY E. Dawson--
TELEPHONE (313) 586-5027 Month March, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE'I)AILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1074 17
'1059 2
1038 18 1067 3
1076 19 1074 4
1080 20 1074 q
5 1076 21 1070 6
1078 22 1063~-
7 1071 23 1049 8
1069 24
--1080 9
1039 25 1075' 10 1066' 26 1077 J
11 1068 27 1078 12 1046 28-1077 13 -
1048 29.
1072 14 1048 30 1062 15 1040 31
-731 16 1030
UNIT SHUTDOWNS AND POWEst REDUCTIONS
- p DOCKET NO.
50-341 DATE April 16. 1990 UNIT NAME Fermi 2 COMPLETED BV P.
M.
Anthony TELEPHONE (313)586-1617 REPORT MONTH March. 1990 L
.l METHOD OF LER SYS COMP CAUS$ & CORRECTIVE l
NO.
DATE TYPE DUR REASON SHUTTING DOWN NO.
CODE CODE ACTION TO PREVENT l
(1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRENCE (3)90-003 03/31/90 5
8 5
Reduced power to perform weekly' l Turbine Steam valve surveillance and then continued to approximately
)
60% power for control rod sequence l
exchange and scram timing.
I (1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL' FOR PREPARATION OF DATA B - MAINTENANCE OR TEST.
2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E - OPERATOR TRAINING &' LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT 1 - SAME SOURCE o
.~.v
.. n n&