MONTHYEARNRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements NRC-93-0077, Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys1993-07-29029 July 1993 Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys NRC-93-0061, Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld1993-07-29029 July 1993 Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld NRC-93-0078, Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers1993-07-29029 July 1993 Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers NRC-93-0062, Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements1993-05-24024 May 1993 Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements NRC-93-0038, Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys1993-05-24024 May 1993 Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys 1999-09-24
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N4301999-10-25025 October 1999 Amend 17 to License DPR-9,revising TS by Deleting SR D.3.c, Which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages ML20205Q7091999-04-15015 April 1999 Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 ML20198S3271999-01-0606 January 1999 Amend 15 to License DPR-9,consisting of Changes to TS ML20154R2251998-10-21021 October 1998 Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting Typos NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements ML20133L6171997-01-0202 January 1997 Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment Failures NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements 1999-09-24
[Table view] |
Text
Rsr u, ,
', . B. R lph Sylvia
.i , , Senior vice President cp .
6400 North Disse Highway Edis' on :=r-January 3, 1990 NE-89-0242 U. S. Ibclear Regulatory Camission Attn: . Document Control Desk Washington, D. C. 20555
References:
- 1) Fermi 2 N E Docket No. 50-341 IGC License No:, IPF-43
- 2) Detroit Mit,on Letter to NIC, NE-89-0042,- '
" Proposed Technical Specification Change (License Amendment) - Emergency Equipnent ^
Cooling Water System,(3/4.7.1.2), Emergency Equipnent Service Water System (3/4.7.1.3),
and Ultimate Heat Sink (3/4.7.1.5)," dated May 31, 1989
- 3) Detroit' Edison Letter to NE, NIC-88-0255,
" Proposed Technical Specification Change (License Amendment) - Ultimate Heat Sink (3/4.7.1.5)," dated September. 30, 1988
- 4) Detroit Edison Letter to NE,-NE188-0281,
" Proposed Technical Specification Change ;
(License Anendment) - Appendix R Alternative Shutdown Systems," dated December 22,'1988
- 5) Detroit Edison Letter to NE, NE-87-0244, _
" Proposed Technical Specification Change -(License Amendment) - Emergency Equipment Cooling Water System -(3/4.7.1.2), Energency Equipment Service Water Systen (3/4.7.1.3), and Ultimate Heat Sink (3/4.7.1.5)", dated March 10, 1988
- 6) Detroit Edison Letter to NE, NE-89-0269,
" Technical Specification Bases Change - Ultimate Heat Sink," dated Decenber- 15, 1989 Subject Supplement to Proposed Technical-Specification Change (License Anendment) - Emergency Equipment Cooling Water System (3/4.7.1.2), Emergency Equipment Service Water System (3/4.7.L.3. ),_3nd Ultimat_e Heat Sink (3/4.7.1.5) i In Reference 2, Detroit Mison submitte3 a proposal to modify the l Technical Specification requireuents for certain Fermi 2 Service Water -
1 fpo t . 1 9001170226 900103 i I'
- DR, ADOCK 05000341 PDC L _ _ _ _____- _ __---
USNPC January 3, 1990 NBC-89-0242 Page 2 systems. The Reference 2 submittal superseded the Reference 5 proposal on the same subject. This submittal modifies the Technical Specifications for the Emergency Equipment Cooling Water (ERN) systen proposed by Reference 2. The a:: tion requirements for an inoperable EIEW system subsystem have been clarified with regards to the intet to allow continued plant operation under certain specific ciretmstmees. These specific circumstaces are also modified to include verification of the status of the non-safety related cooling water system which normally cools the equipment which is cooled by EECW in emergency situations. Further, the provisions for Operational Conditions 4 and 5 are modified. These provisions have been foun3 to.
be subject to interpretation in an unnecessarily restrictive manner.
Detroit Edison han evaluate 3 the proposed Technical Specifications against the criteria of 10CFR50.92 and determined that ne significant -
hazards consideratdon is involved. The Fermi 2 Onsite Review Organization has approved and the Nuclear Safety Review Group has reviewed the proposed Technical Specifications and concurs with the enclosed determinations. In accordance with 10CFR50.91, Detroit Edison has provided a copy of this letter to the State of Michigan.
If you have any questions, please contact Mr. Glen Ohlemacher at (313) 586-4275.
Sincerely, faf tb f C
Enclosure cc A. B. Davis R. W. Defayette W. G. Rogers !
J. F. Stang Supervisor, Myanced Planning and Review Section,-
Michigan Public Service Ccanmission i
y
., 4
, USNIC
[
January 3, 1990 '
NIC-89-0242 Page 3 i I, B. RALPH SYINIA, do hereby affirm that the foregoing statements 'are .
based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
?
h tvA)F A
B.RALPflSYI[
Senior Vice President On this Ad _ _ day o '.M[ .1990, = before me-personally appeared B. Ralph Sy la, bei@ first duly sworn and says that he executed the foregoing t his fr6e act and deed, t
i
_ A/Abv 4
Notary Public ROSALIE A. ARMETTA -
Notary Public. Morvoe County,W -
MyCorndssionExpiresJan 11.g i
J ,
EncloIurs to ll NRC-89-0242 Page 1 i
INTRODUCTION In Reference 2, Detroit Edison proposed revised Technical Specification requirements for the Emergency Equipment Cooling Water (EECW) system. The proposal was submitted in order to remove '
ambiguity in the required actions for an inoperable EECW system subsystem.
The Reference 2 proposal was written to allow a reasonable period of time for continued plant operation with one EECW system subsystem inoperable while ensuring that sufficient critical systems retained their full capability during the allowed out-of-service period. The proposal was based upon an analogous situation which exists in the case of the Emergency Diesel Generators (EDG).
Review of the Reference 2 proposal has indicated that the proposal ,
retains some ambiguity in the action requirements. Further, the action requirements of the Reference 2 proposal are based upon the
( availability of the non-safety related cooling water system to provide j cooling during the out-of-service period. However, the action requirements did not require assurance of.this availability prior to the use of the full out-of-service period. Also, the provisions proposed for Operational Conditions 4 and 5 have been found to be I subject to interpretation in an unnecessarily restrictive manner. The purpose of this submittal is to provide modified Technical Specification requirements to resolve these concerns. ;
EVALUATION The Reference 2 proposal can be ambiguous in terms of the extent of the required actions in the event of the inoperability of one EECW system subsystem. The inoperable EECW system subsystem provides support to a wide range of plant equipment each of which have specific Technical Specification requirements. The Reference 2 submittal intended to provide the governing action requirement for the situation where an EECW system subsystem is inoperable. The proposed EECW l action requirement is now explicit in stating that if the requisite verifications are completed then the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time can- ,
be applied. -l Detroit Edison believes that'this is appropriate'in light of the assurance given by the required verifications that a complete loss of l the safety functions for these critical systems will not occur during i i the proposed out-of-service period. As detailed in Reference 2, this l
! is analogous to the allowed out-of-service time for the inoperability l of a division of EDGs.
I
\
i f'
l ...
L y I
i Encloguro to NRC-89-0242 Page 2 The proposal includes an action requirement to assure that the normal )
non-safety related cooling water system is providing cooling to the safety related components normally supported by the inoperable EECW l system subsystem before the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time can be used.
The operation of this normal cooling supply increases the probability that the safety function of equipment supported by the inoperable EECW system subsystem will actually be completed should that be required during the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service period. This new action requirement is in addition to the two action requirements which were proposed in Reference 2 to be required prior to using the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time. The Reference 2 actions involve verification of the operability of the components cooled by the opposite division EECW subsystem and verification of the operability of the Automatic Depressur$zation i System, when required to be operable. A two hour time period continues to be proposed to perform these actions.
The non-safety related cooling water system which normally supports the equipment which is supported in emergency circumstances by EECW is ,
the Reactor Building Closed Cooling Water (RBCCW) system. The new '
action requirement consists of a determination that the RBCCW system l is operating normally by verifying that normal system operating ,
pressure exists. The acceptance criteria developed for the plant performance monitoring program will be used to determine the acceptability of the RBCCW system. Also, verification that a' cooling j flow path exists for the affected safety-related components is required. This verification is performed by examination of valve l, line-up and equipment tag out records. The Bases have also been !
revised to reflect the process, j The new ACTION requirement dealing with the status of RBCCW provides additional restrictions to assure that the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time is applied only to cases where the degradation in the plant equipment of concern is limited to the single EECW system subsystem. This #
assures that the 72-hour time limit-is not utilized in other circumstances which may not have been evaluated.
The two EECW system subsystems are normally two branches in the distribution of RBCCW system cooling water. . In the event of an EECW j initiation signal (loss of RBCCW supply pressure,-loss of power to the RBCCW pumps or high drywell pressure) the RBCCW systems valves are automatically repositioned to form the two independent EECW system subsystems. The EECW pumps and heat exchangers are connected to the EECW system subsystems, the RBCCW pumps and heat exchangers are isolated from the EECW system subsystems, and the EECW pumps receive a starting signal.
l
t
.. Enclo2urs to NRC-89-0242 Page 3 There is no change to the connection of cooling water to the cooled components. The cooling water supplied by RBCCW provides the same function as that supplied by EECW. Thus, the only differences in regards to the cooling supplied to the equipment is in the pump-providing the flow and in the heat sink which receives the heat from the components. Figure 1 illustrates the relationship between RBCCW and EECW.
This arrangement provides for two possible situations for an '
inoperable EECW system subsystem. The first is where a problem occurs associated with the EECW pumps or heat exchangers.. The second is
-where a problem occurs in the cooling water distribution piping which carries either EECW or RBCCW cooling (depending on which is operating) to the cooled components.
The first situation will allow the proposed required action to be completed; the second situation will not. An inoperability of an EECW subsystem will be easily classified into one of these two situations and the action to assure that normal cooling to the affected safety-related components will, therefore, be easily completed in the i~
required 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> time frame.
It should also be noted that the RBCCW system supports non-safety related components located in the Reactor Building. Many of these ,
components are essential to normal power operation and, if RBCCW-cooling were to be lost, the resultant loss of cooling to these .
essential components would cause a prompt plant shutdown. Thus, it is }
clear that the RBCCW system is designed to be highly reliable. The '
operating hist 6ry of the RBCCW system at Fermi 2 has been excellent.
As described above, should RBCCW fail, then'EECW would automatically initiate. This would result in-a Licensee Event Report (LER) under the provisions of 10CFR50.73 Detroit Edison submitted one LER due to an automatic initiation of EECW due to a component failure in the RBCCW system in July 1985. There have been no other events of this nature since the licensing of Fermi 2.
The Reference 2 proposal includes provisions for Operational Condition 4 and 5. The intent is to take the action for any equipment which is j
rendered inoperable by the loss of EECW cooling. Whether or-not a piece of equipment should be considered inoperable depends'upon the impact of the loss of EECW on the equipment's ability to perform its l intended function. In. Operational Conditions 4 or 5, the need for !
EECW cooling may depend upon the design basis scenarios which can ,
credibly occur in these conditions. Thus, there could-be no actual }
impact on the equipment's ability to perform its intended funcl, ion '
with a loss of EECW cooling. For example, some EECW cooled room coolers may not be needed under accident conditions when the reactor
I Enclorura to l -
NRC-89-0242 Page 4 is at low temperatures. The equipment'in these rooms thus would still be able to fully perform their intended function and would not need .to be declared inoperable.
The EECW system is designed to provide cooling to equipment essential to achieving and maintaining safe shutdown conditions under postulated accident conditions. The worst-case conditions are generally those following an accident originating during power operation. There are a number of specific circumstances possible in Operational Conditions 4 and 5 for which the worst-case conditdons are substantially less severe than those possible at power. Engineering evaluation of each specific circumstance may result in a determination that the equipment j of concern can be considered operable. -l The modified Action b for Specification 3 7.1.2 now clearly indicates that the process described above should be followed and only Action Requirements for equipment determined to be inoperable must be l followed._ As proposed in Reference 2, the provisions could be. j interpreted to require all Action Requirements for safety related j l equipment associated with an inoperable EECW system subsystem '
regardless of the actual impact upon the equipment's ability to-perform its intended function in that Operational Condition. Since the change clarifies the intended process for determining operability j and taking appropriate actions,: Detroit Edison believes the change is acceptable.
The Bases are also proposed to be modified to describe the above j
. process. Also, it clearly states that time requirements in any Action !
Requirements determined to be applicable start at the time the EECW cooling is found or made to be inoperable. This removes any ambiguity !
as to when the Action-Requirements start and provides a-conservative !
- application of these-requirements.
Attached are the modified Technical' Specification requirements for. :l both the EECW system (Specification 3/4.7.1.2) and the Emergency Equipment Service Water System (Specification 3/4.7 1 3). The j
Reference 2 proposal also includes changes for Specification '!
3/4.7 1.5, Ultimate Heat Sink. The changes to 3/4.7.1.5 continue to 1 be necessary only if approval of the Reference 3 proposal has not j occurred before this proposal is approved. The attached Technical- "
Specifications also include provisions,'which are contained in'a ## i footnote for action a. of Specification 3 7.1.2, regarding Appendix R alternate shutdown systems that are needed only if approval of the 1~
Reference 4 proposal precedes this proposal. If the' Reference 4 proposal is approved after this proposal, then these provisions should. ,
be incorporated at that time. Reference 6 proposed a change to the !
same Technical Specifications Bases section as proposed to be changed l
1 a
% I
l
, Enclosure to NRC-89-0242 Page 5-in this submittal. The Reference 6 change is independent of this proposal and should not be deleted or modified by the incorporation of the Bases material proposed in this submittal.
SIGNIFICANT HAZARDS CONSIDERATION Detroit Edison has reviewed the No Significant Hazards Consideration analysis contained in the Reference 2 proposal and has determined that it remains applicable to the proposal as-modified herein.
DISCUSSION As stated above, this proposal is written to clearly indicate that the actions provided for an inoperable EECW system subsystem are the governing action requirements and other action requirements are.not intended to be taken. This is because the actions provided are those which take into account the full impact of the inoperable EECW system subsystem. Continued plant operation is only allowed under limited !
circumstances where it is justified; otherwise, an immediate plant i shutdown is required. !
As described in Reference 2, application of other action requirements j will generally require an immediate plant shutdown without regard for ;
the need for such a shutdown or the impact of the requirement for l these shutdowns.on the overall safety of the plant..
EECW and EESW system subsystems and Ultimate Heat Sink components must be made inoperable at times during plant operation in order to meet .I regulatory requirements and other commitments. For example:
o The EECW and EESW pumps must be tested in accordance with the Pump and Valve' Inservice Test Program required-by 10CFR50 55a and Specification 4.0.5. The required frequency is at-least ;
once per 92 days. Performance of the EECW tests currently j requires that the safety function of the system be disabled -
to establish controlled conditions for the test.- l 1
o Many components-in these systems require preventive maintenance (PM) on a regular. basis. Most of these PM tasks have been. categorized as " Category A" tasks since they affect j the ability of a safety-related system to perform its safety.
function. Detroit Edison has committed to perform these tasks or justify their' deferral by engineering evaluation. .j Some of the PM tasks are also required to maintain the Environmental Qualification (EQ) of the components. These EQ tasks are required to meet the requirements of 10CFR50.49.
The periodicity of these tasks range from 13 weeks to 5 years. These periodicities are based upon vendor information or other defined basis and represent the most appropriate interval for optimum operation of the systems in question.
l
}
, Enclosura to NRC-89-0242 Page 6 The tasks generally require the subsystem affected to be -)
inoperable. The next scheduled period where an EECW subsystem is to be made inoperable to perform these important' PM tasks is scheduled for January, 1990. The PM program is [
scheduled to require 4 periods of inoperability of each EECW '
subsystem each year.
o The EECW and EESW systems and Ultimate Heat Sink consist of numerous components which are essential to the operability of these systems. There is a high probability that during a typical operating cycle that minor corrective maintenance '
l will be needed on these systems. This activity will also generally result in inoperability of the system involved.
As described above, the application of other action requirements in this situation would require frequent plant shutdowns and startups. -
These transients are unnecessary and, in themselves, contrary to-the goal of safe and reliable operation of Fermi 2. .
A reasonable out-of-service time should be allowed under conditions t l
where the ability to reach cold shutdown during design basis events is
'. maintained with the equipment available. Generally, the loss of 1
redundancy is acceptable for a limited out-of-service time. ;
[ In this case, the impact of the loss of EECW cooling is limited to one .
of the two divisions of safety related equipment. -The unaffected. ,
,' division of equipment as well as the Automatic Depressurization System 1
- (when required to be operable) are promptly verified to be operable.
l This equipment is sufficient to attain cold shutdown under design l basis conditions without equipment failures.- Additional actions ~to l l assure RBCCW is providing its normal cooling function increase the probability the affected division will be able to also respond during 3 the proposed out-of-service time period. RBCCW provides the same function as EECW; however, it will not be available under some-circumstances where EECW will be available. In summary,.the proposed
( out-of-service time is necessary for safe reliable operation and is
, consistent with situations for which out-of-service times are j generally provided.
In specifying an out-of-service time, comparison to existing allowed out-of-service times is appropriate. Also, the intent of the current ,
EECW Technical Specifications should be considered. Detroit Edison 3 has proposed a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time because both considerations- -
i indicate that this is appropriate.
As fully described in Reference 2, the EECW configuration is closely analogous to that of the EDGs. The EDG Technical Specification allows an out-of-service time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The current EECW related
. Technical Specifications allow 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to entering other-action j statements. Therefore, Detroit Edison believes that 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> i
, Enclosura to NRC-89-0242 Page 7 ,
represents the normal out-of-service time appropriate for an >
inoperable EECW system subsystem.
This proposal' implements an evaluation of the impact of the "
inoperability of an EECW system subsystem based upon the specific cooling water equipment configuration which exists at Fermi 2. The cooling water equipment configurations vary widely throughout the nuclear industry; therefore, the results of this evaluation are not applicable at facilities other than Fermi 2. In light of this evaluation and the additional information provided herein and in Reference 2, Detroit Edison believes that this proposal both assures the health and safety of the public and allows for the safe reliable operation of Fermi 2.
I s
l l
l:
l i
b i
I
l 1 .
l
Ils Ils
'I I -
lii. = ;
l li.
liji -
1 -
[i, s IGHt 15 l HBI l11 b
il leH<
l11
=
I lll =
l ll11 _
il
~ =
I l l if. .li.
.-
i i =I g 81 als
~
Ill - 1 I li l c
=
l i l -
lll 2 li l l . ,
II II -
w if I 31 I I.-9hka y
_I C 'OhI.e --va-
- h N c-leH< rD- 9 d al leu p p--Ch :'HEl g
a y , ,,,
- IN g a O-
--7;__iehbl U- ,
ll 1
~
1 8
I i i, l ll -
l l
-- j k t-__-
o!
g l 1_g l l Ishl hel-O 1
__ _ y '- @ll - _
l ,sil
/ N Q,,,
- ,._-___-.._- _ . _ . _ _ .