MONTHYEARNRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements NRC-93-0077, Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys1993-07-29029 July 1993 Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys NRC-93-0061, Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld1993-07-29029 July 1993 Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld NRC-93-0078, Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers1993-07-29029 July 1993 Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers NRC-93-0062, Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements1993-05-24024 May 1993 Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements NRC-93-0038, Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys1993-05-24024 May 1993 Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys 1999-09-24
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N4301999-10-25025 October 1999 Amend 17 to License DPR-9,revising TS by Deleting SR D.3.c, Which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages ML20205Q7091999-04-15015 April 1999 Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 ML20198S3271999-01-0606 January 1999 Amend 15 to License DPR-9,consisting of Changes to TS ML20154R2251998-10-21021 October 1998 Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting Typos NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements ML20133L6171997-01-0202 January 1997 Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment Failures NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements 1999-09-24
[Table view] |
Text
- . - _ _ _ _ - . . - _ _
... -' t
- 8. Rdph Sylvia Group Vce President 6400 North Ome Highway ISOn Newport.Mehegan (313) 586 4150 48166 April 20, 1988 NRC-88-0105 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Proposed Technical Specification (License Amendment) ,
Change - Reactor Protection System Instrumentation Surveillance Requirements (Table 4.3.1.1-1) t Pursuant to 10CFR50.90, Detroit Edison Company hereby proposes to amend Operating License NPF-43 for the Fermi 2 plant by incorporating the enclosed changes into Technical Specification Table 4.3.1.1-1, Reac;or Protection System Instrumentation Surveillance Requirements.
The proposed change is to delete the Daily Channel Check requirements of Note (g) for the Average Power Range Monitor Flow Biased Neutron Flux - High Scram Functional Unit. As described herein, the requirements of this note may potentially unnecessarily limit the operation of Fermi- 2. Therefore, your prompt consideration of this proposal is requested.
Detroit Edison has evaluated the proposed Technical Specifications against the criteria of 10CFR50.92 and determined that no significant hazards consideration is involved. The Fermi 2 Onsite Review Organization has approved and the Nuclear Safety Review Group has i reviewed these proposed Technical Specification changes and concurs
! with the enclosed determinations.
Pursuant to 10CFR170.12(c), enclosed with this amendment is a check i for one hundred fifty dollars ($150.00). In accordance with 10CFR50.91, Detroit Edison has provided a copy of this letter to the State of Michigan.
Aoo(
'I w { Check $lS O 8804260026 880420 PDR ADOCK 05000341 i P DCD
USNRC April 20, 1988 NRC-88-0105 Page 2 If you have any questions, please contact Mr. Glen Ohlemacher at (313) 586-4275.
Sincerely, f
Enclosure cc: Mr. A. B. Davis Mr. R. C. Knop Mr. T. R. Quay Mr. W. G. Rogers Supervisor, Advanced Planning and Review Section Michigan Public Service Commission 1
I l
I 1
l 1
USNRC April 20, 1988
. NRC-88-0105 Page 3 I, B. RALPH SYLVIA, do hereby af firm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
.~ AA r B.f(ALFi/SYLVJn Group Vice President On this clo day of , 1988, before me personally appeared B. Ralph Sylvia, being first duly sworn and says that he executed the foregoing as his free act and deed, fW >b&
Notary Public MARCIA BUCK Notory Pubile,Washtonow County.MI My Commission Exp'resJon.11,1992 b4A
Enclosure to NRC-F8-0105 Page 1 Background / Discussion Technical Specification Table-4.3.1.1-1, "Reactor Protection System Instrumentation Surveillance Requirements," is being revised to delete the Daily Channel Check requirements of Note. (g) for the Average Power Range Monitor Flow Biased Neutron Flux - High Scram Functional Unit >
. identified as item 2.b on Table 4.3.1.1-1. Justification for the proposed change (see attached marked-up pages 3/4 3-7_and 3/4 3-8_ from the Fermi 2 Technical Specifications) is provided as follows:
~
The existing Note (g) requires that measured core flow be 1ess than or equal to established core flow at the existing icop drive flow. The measured core flow is.the total core flow as measured by the use of jet pump dP instrumentation and flow summers. The established core flow is determined from a correlation between recirculation drive flow and the total core flow along the rated load line.
With a properly established Drive Flow versus Core Flow correlation along the rated load line, and with properly calibrated instrumentation used to measure the core flow, the two methods would result in essentially the same core flow value for the came. loop flow while operating on the rated load line. In other words, the measured core flow may be somewhat lower than or somewhat higher than the established core flow and still be acceptable depending on the allowable range of instrumentation accuracy. Based on this, proper operation along the rated load line does not ensure compliance with Note (g).
If operation is below the rated load line but within the allovable region of the Power to Flow map, the measured core flow will be-greater than the established core flow for the loop drive flow. This is because for a given core flow, the maxinum resistance to flow from core voids is at the rated load line. Operation below the rated load l line at the same core flow would result in lecs resistance to flow in the core; consequently a lower loop drive flow would be required to maintain the constant core flow. This lower loop drive flow results in a lower established core flow. Thus, as the operating point moves below the rated load line, at a constant measured core flow, the established core flow decreases. Therefore, proper operation below the rated load line would result in non-compliance with Note (g).
The problems with the existing Note (g) detailed above were discovered as a result of the on-going Technical Specification review effort at Fermi 2. During a comparison of Fermi 2 Technical Specifications with other comparable BWR Technical Specifications the difference in the wordings of this item was noted and investigated. The existing 1
Enclosure to NRC-88-0105 Page 2 provisions of Note (g) have not yet posed an operational problem at Fermi 2 since the correlation between recirculatioa drive flow and total core flow to determine "established core flow" is based upon Start-up Testing performed at 100% power and flow. Fermi 2 has not yet completed this portion of the Start-up Test Phase Program and has therefore not yet made the comparisons covered by Note-(g). When the correlation is established, the requirements of Note (g) will unnecessarily limit the operation of Fermi 2.
Detroit Edison has researched this item to determine the specific intent of Note (g). It is believed that the note comes from a concern that the correlation between recirculation drive flow and total core flow may change non-conservatively with respect to the flow biased scram setpoint. However, the specific event and/or phenomenon of concern could not be determined.
It was confirmed that the note was incorporated into the proposed Revision 4 of Standard Technical Specifications with the following wording:
"Verify measured core flow to be greater than or equal to established core flow at the existing pump speed."
It has also been confirmed that the wording of the note varies from plant to plant. The Fermi 2 Note (g) reads as follows:
"Verify measured core flow to be less than or equal to established core flow at the existing loop drive flow."
It may be noted that the inequality in the Fermi 2 Note (g) is worded backwards relative to the proposed Standard Technical Specifications.
A review of selected samples of different plant Technical Specifications has shown how the original intent of the note has been obscured as each of these plants have negotiated their own wording.
Discussions with these plants and/or General Electric reveal that the differences in the wording is due to each plant's attempt to rationalize the note or to have it worded as innocuously as possible having determined or concluded that the note does not reflect a serious concern or has no basis for being in the Reactor Protection System (RPS) instrumentation Technical Specification.
Detroit Edison has decided that rather than attempting to reword the note into a more "meaningful" or "convenient" form, justification will be provided for deleting the note f rcm the RPS instrumentation Technical Specification.
J$ A Ea _ si 4J _d y r -+- i . . - . -
4.4 .. I - , &-, - n w. -- -
Enclosure to NRC-88-0105 Page 3 J
A review of the various versionc of the note 'shows that, with minor variations, there are two general versions, neither of which exactly matches the wording appearing in the Stenderd Technical Specifications, nor do they match the wording appearing in t1?e Fermi 2 Technical Specifications.
(I) One version of the note requires verifying that indicated or measured reactor recirculation loop drive flow for a given flow control valve position is less than or equal to a previously, established reactor recirculation loop drive flow for that flow control valve position. ,
(II) The other version requires verifying that measured total core flow (total jet pump flow) for a given indicated reactor recirculation loop drive flow (as sensed by the APRMs) is ;
greater than or equal to a previously established total core flow for that particular reactor recirculation loop drive flow.
(An alternative version replaces the "greater than or equal to" inequality with a general requirement to check that the two items compare favorably).
On the basis of discussions with General Electric and other utilities, ;
! it appears that the following concerns and/or events may have been considered when the note was incorporated in the Technical Specifications:
(1) Flow control valve crudding j (2) Jet pump beam cracking (3) Jet pump blockage (4) Core crudding (5) Jet Pump Instrumentation problem l (1) Flow Control Valve (FCV) Crudding This does not apply to the Fermi 2 plant as Fermi 2 Recirculation System does not have Flow Control Valves.
(2) Jet Pump Beam Cracking j l
This concern has already been addressed by the requirements of '
Technical Specification 3/4.4.1.2 (Jet Pumps). The Surveillance requirements for this Technical Specification (4.4.1.2) are
- stated as follows
Each of the required jet pumps shall be demonstrated OPERABLE i prior to THERMAL POWER exceeding 25% ct RATED THERMAL PO'4ER and I at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by determining recirculation loop I
+ - ,.,. .-w ----, ,..---n- , -
---9 -~y- ~.a ..v- .-- - - , . ,., , , , , m-nye,p-.-e, ,-y,se-, - -n-,"w p,wn----sw-- ---r~r- m-
Eaclosure to
- NRC-88-0105 Page 4 flow, total core l flow, and dif fuser-to-lower plenum dif ferential pressure for each jet pump and verifying that.no two of the following conditions occur'when the recirculation pumps are operating at the same speed;
- a. The indicated recirculation loop . flow dif fers by more than 10% from the established pump speed-loop flow characteristics.
- b. The indicated total core flow dif fers'by more than 10% from the established total core flow value derived from recirculation loop flow measurements.
- c. The indicated dif fuser-to-lower plenum dif ferential pressute of any individual jet pump differn from the mean of all jet pump differentisi pressures in the same loop by more than 20%
deviation from its normal deviation.
If Jet Pump Beam Cracking was to occur, this survelliance check would recognize it. Failure to meet the acceptance. criteria would then require a plant shutdown becauce the corresponding ACTION under 3.4.1.2 states. "With one or more jet pumps inoperable, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />."
Additional ACTION or surveillance under the RPS instrumentation Technical Specification should not be required.
(3) Jet Pump Blockage J
In the unlikely event a jet pump becomes blocked or obstructed, the aforementioned jet pump performance surveilla,ncec would reveal this condition as well.
(4) Core crudding General Electric has indicated that the change in m-ratio (core flow minus recirculation loop drive flow divided by recirculation loop drive flow) that might occur from beginning-of-cycle to end-of-cycle due to core crudding is so slight that this phenomenon is not considered to be a significant concern and that the resultant change in-the m-ratio would have negligible impact on the APRM-Flow Biased Neutron Flux (APRM-FBNF) trip setpoint. The m-ratio will be checked at least once per cycle using Reactor Engineering procedures. The recirculation flow units and APRM flow biased scram circuitry is checked periodically per required surveillances. These activities ensure that W (percent of rated recirculation drive a
I L
1
.y., - . ,g....,-y._,+.e, - - .-w-r-* m- y e.,sa w -e-mw-+ w q w ,e,y1
l Enclosure to'
.NRC-88-0105 Page 5 flow) as required for RPS instrumentation, is accurate or conservative.
(5) Jet Pump Instrumentation Probi,em If any of the surveillances under 4.4.1.2 yielded unacceptable results, a jet pump instrumentation problem would be suspected.
Cross checks against other related instruments associated with the. required jet pump surveillances would be performed to determine if it is indeed just an instrument problem. If an instrument problem is identified, then the necessary actions would be performed to restore the instrumentation to operable status. No concern with respect to the APRM-FBNF trip exists (assuming the APRM-FBNF instrumentation is operable as verified by the performance of its associated surveillances) because a jet pump instrument problem does not involve an actual change in the m-ratio.
In summary, the above concerns are adequately addressed by the RPS instrumentation surveillances, the recirculation flow unit'
. surveillances, the jet pump surveillances and the check of the n-ratio. Jet pump beam cracking' or jet pump blockage, which could cause a gross change in m-ratio are already covered by specific surveillance requirements. Changes to the m-ratio due to core crudding would be expected to be minimal over the course of the cycle. As such, the check of m-ratio at least once per cycle and the surveillance requirements for RPS and recirculation flow unit l instrumentatiot: provide assurance that the concerns associated with I core crudding are adequately addressed. A requirement like Note (g) !
therefore, should not be included in the RPS instrumentation Technical l Specification because the concerns described above do not require it. I
{ As described above, adequate steps are taken without lbte (g) to 4
detect and take appropriate acticn for- degradation in the amount of core flow resulting from a given recirculation loop flow. Therefore, Detroit Edison proposes to delete the Daily Channel Check for the APRM-FBNF signal and the associated Note (g) from Table 4.3.1.1-1.
Significant Hazards Consideration In accordance with 10CFR50.92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards considerations. To make this determination, Detroit Edison must l establish that operation in accordance with the proposed amendment ;
would not: 1) involve a significant increase in the probability or i consequences of an accident previously evsluated, or 2) create the possibility of a new or different kind of accident from any accident"
- (
' Enclosure to NRC-88-0105 Page 6 ,
previously evaluated, or 3) involve. a significant reduction in a j-margin of safety.
(1) The proposed change to the Fermi 2 Technical Specificatiens does j not involve a significant increase in the' probability'or consequences of an accident previously evaluated (with respect to the-fuel cladding safety limits) because the proposed change only removes a requirement determined ,to have no meaningful' value from a safety point'of view. - With properly maintained RPS instrumentation and periodic m-ratio checks, the
-accuracy / conservatism of the APRM-FBNF trip is assured and the validity of the Loss of Feedwater Heater transient analysis.
(which takes credit for the APRM-FBNF-trip) is not. adversely affected by the deletion of Note (g). Gross deviations from established core-flow and drive-flow conditions (m-ratio) will '
continue to be indicated by performance of the surveillances required under Technical Specification 3/4.4.1.2.
(2) The proposed change does _not create the possibility of a new or different kind of accident from any previously evaluated because !
no new modes of operation or changes to plant design are involved. The scope of the proposed change is strictly limited '
to the deletion of the channel check requirement specified by Note (g). ,
(3) The proposed change does not involve a significant reduction in !
a margin,of safety because the relationships (under Specification 3.2.2) used to establish the APRM Flow-Biased J
Neutron Flux - High scram and Flow-Biased Neutron Flux-Upscale j control rod block trip setpoints will remain unchanged. The APRM-indicated recirculation loop drive flows will continue to be appropriately checked to ensure that their established l
relationship to total core flow is preserved. : All other OPERABILITY and surveillance requirements associated with the affected instrumentation remains unchanged.
Based on the above reasoning, Detroit Edison has determined that the proposed amendment does not involve a significant hazards consideration.
Envircnmental Impact Detroit Edison bas reviewed the proposed Technical Specification
. changes against the critoria of 10CFR51.22 for environmental considerations. As shown above, the proposed changes do not involve a significant hasards consideration, nor significantly change the types or significantly increase the amount of effluents that may be released 4
i
Enclosure to IIRC-88-0105 Page 7 offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, Detroit Edison concludes that the proposed Technical Specifications do meet the criterie given in 10CFR51.22(c)(9) for a categorical exclusion from the requirement for an Environmental Impact Statement.
Conclusion Based on the evaluations above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission?s regulations and proposed amendments will not be inimical to the common defense and security or to the health and safety of the public.