NRC-87-0272, Proposed Tech Specs Allowing LPCI Sys Cross Tie Valve to Be Placed in Closed Position During Plant Shutdowns

From kanterella
(Redirected from NRC-87-0272)
Jump to navigation Jump to search
Proposed Tech Specs Allowing LPCI Sys Cross Tie Valve to Be Placed in Closed Position During Plant Shutdowns
ML20147H267
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/15/1988
From:
DETROIT EDISON CO.
To:
Shared Package
ML20147H216 List:
References
CON-NRC-87-0272, CON-NRC-87-272 NUDOCS 8801220258
Download: ML20147H267 (2)


Text

6 '

I Enclosure to NIC-87-0272 Page 4 i

4 1

8801220258 G30115 '

PDR ADOCM 05000341 P

PDR u

E EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.2.1 At least the above required ECCS shall be demonstrated OPERABLE per i

Surveillance Requirement 4.5.1,)7 r~

The core spray system shall be determined OPERABLE at least once per

)

4.5.2.2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the condensate storage tank required volume when the condensate storage tank is required to be OPERABLE per Specification 3.5.2.a.2.b.

I

(

Wll11 the excephh fhat, & c +he I.-PCI sy31em, the cross -tie s u b s yste w2 If thz L/ctlve. may be-c</osed to I.s o Ic<1e cc O PE 124 BL E. & uh sys tem is m ocle cap s ble-o f inj e c fim fu th e ren cfo r.;Vess e {,

'N_

C

,il FERMI - UNIT 2 3/4 5-7 i

,,m

_ _ _,