NRC-16-0068, 2017 Fermi Ile Outline Submittal Ltr

From kanterella
(Redirected from NRC-16-0068)
Jump to navigation Jump to search
2017 Fermi Ile Outline Submittal Ltr
ML17194A840
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/03/2017
From: Maglio S
Detroit Edison, Co
To: Robert Orlikowski
NRC/RGN-III/DRS/OLB
Shared Package
ML17061A779 List:
References
NRC-16-0068
Download: ML17194A840 (3)


Text

DTE Energy Company 6400 North Dixie Highway Newport, MI 48166

.7 DTE Energy*

Confidential Material Enclosed - Withhold Under 10 CFR 2.390 November 8, 2016 10 CFR 55.40 NRC-16-0068 Mr. Robert Orlikowski Chief, Operations Branch Division of Reactor Safety Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Fermi 2 Initial Licensed Operator Examination Outlines Enclosed please find the proposed examination outlines for the upcoming Fermi 2 Initial License Examination that is scheduled for the week of March 20, 2017. The following items are enclosed:

  • Examination Outline Quality Checklist (Form ES-201-2)
  • Photocopies of Examination Security Agreements (Form ES-201-3)
  • RO Control Room/In-Plant Systems Outline (Form ES-301-2)
  • SRO Upgrade Control Room/In-Plant Systems Outline (Form ES-301-2)
  • Scenario Outlines (Form ES-D-1)
  • Generic Knowledge and Abilities Outline (K/As) (Form ES-401-3)

The enclosure to this letter contains confidential material.

RECEIVED Upon separation from the enclosure, this cover letter is DECONTROLLED.

NOV 14 2016

USNRC NRC-16-0068 Page 2 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 The examination outlines were developed using the appropriate guidance contained in NUREG-1021, Revision 10. It is requested that the enclosures be withheld from public disclosure until the completion of the examinations.

We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above please contact Mr. Bryan Crone, General Supervisor, Operations Training at (734) 586-4173.

Sincerely, A t'<lt\ A..

Scott A. Maglio 9

Manager - Nuclear Licensing Enclosures cc: [w/o Enclosures]

NR Project Manager Reactor Projects Chi ef~ Branch 5, Region III NRC Resident Office Document Control Desk, Washington DC The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED.

USNRC NRC-16-0068 Page3 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 bee: [w/o Enclosures]

E. L. Bennett M. S. Caragher P. Fessler E. F. Kokosky S. A. Maglio K. J. Polson A. J. Pullam Electronic Licensing Library (ELL) (200 TAC) [w/o Enclosures]

Information Management (140 NOC) [w/o Enclosures]

NSRG Administrator (210 NOC) [w/o Enclosures]

NRR Chron File [w/o Enclosures]

M.A. Donigian [w/o Enclosures]

B. D. Crone [w/o Enclosures]

The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED.