MONTHYEARNRC-09-0064, Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves - Third Ten-Year Interval2009-11-0303 November 2009 Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves - Third Ten-Year Interval Project stage: Request ML0934900022009-12-14014 December 2009 E-mail to A. Hassoun and R. W. Johnson - Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves - Third Ten-year Interval (TAC Nos. ME2548 - ME2559) Project stage: Other ML1017603332010-01-0707 January 2010 Submittal of IST Relief for Pumps and Valves - Third Ten-Year Interval Project stage: Other ML1004918562010-02-0505 February 2010 Relief Requests - IST Program - RAI - PRR-004, PRR-005, PRR-007, and PRR-010 - ME2552, ME2553, ME2554, ME2559 Project stage: RAI NRC-10-0023, Response to Request for Additional Information Regarding Relief Requests PRR-004, PRR-005, PRR-007 and PRR-010 for the Inservice Testing Program Third Ten-Year Interval2010-03-22022 March 2010 Response to Request for Additional Information Regarding Relief Requests PRR-004, PRR-005, PRR-007 and PRR-010 for the Inservice Testing Program Third Ten-Year Interval Project stage: Response to RAI ML1016703722010-07-0606 July 2010 Evaluation of Relief Requests Nos.: PRR-004, PRR-005, PRR-007, and PRR-010 for the Third 10-Year Interval Inservice Program Project stage: Acceptance Review BSEP 10-0083, Additional Information Supporting Requests for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-07-22022 July 2010 Additional Information Supporting Requests for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report Project stage: Other NRC-16-0028, Submittal of Revised Relief Request No. PRR-007 for the Inservice Testing Program Third 10-Year Interval2016-04-0505 April 2016 Submittal of Revised Relief Request No. PRR-007 for the Inservice Testing Program Third 10-Year Interval Project stage: Request 2010-02-05
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0064, Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2024-10-31031 October 2024 Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-24-0058, Status of License Renewal Commitments2024-10-0303 October 2024 Status of License Renewal Commitments NRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] |
Text
Keith J. Poison Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 Fax: 734.586.4172 Email: poIsonk~dteenergy.com DTE Energy-10 CFR 50.55a April 5, 2016 NRC-16-0028 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) Detroit Edison's Letter to NRC, "Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves- Third Ten-year Interval," NRC-09-0064, dated November 3, 2009 (ML093140302)
- 3) NRC Letter to Detroit Edison, "Fermi 2 - Evaluation of Relief Request Nos: PRR-004, PRR-005, PRR-007, and PRR-010 for the Third 10-Year Interval Inservice Program (TAC Nos. ME2552, ME2553, ME2554, ME2559)," dated July 6, 2010 (ML101670372)
Subject:
Submittal of Revised Relief Request No. PRR-007 for the Inservice Testing Program Third 10-Year Interval Pursuant to 10 CFR 50.55a, "Codes and Standards," paragraph (z)(1), DTE Electric Company (DTE) hereby requests NRC approval of the enclosed revision to relief request, PRR-007, for the Fermi 2 Power Plant.
In Reference 2, DTE submitted relief requests for the third Inservice Testing (IST)
Program 10-year interval at Fermi 2 for NRC review and approval. Specifically, PRR-007 requested relief from the American Society of Mechanical Engineers (ASME) OM Code Sections ISTB-5123 and ISTB-5223, which address comprehensive pump testing. The NRC's approval of relief request PRR-007 in Reference 3 stated that certain identified pumps would be tested within +/- 20% of the pump best efficiency point flow rate while the rest of the identified pumps would be tested within +/- 20% of the pump design accident flow rate. DTE has determined that the Residual Heat Removal (RHR) Service Water pumps which were previously classified in References 2 and 3 as being tested within +/- 20% of pump design accident flow rate should instead be tested within +/- 20% of pump best efficiency point flow rate. Therefore, DTE is hereby submitting a revision to relief request
USNRC NRC-16-0028 Page 2 PRR-007. NRC approval of the proposed alternative is requested for the remaining duration of the Fermi 2 third IST 10-year interval which started on February 17, 2010.
DTE requests NRC approval of this relief request within one calendar year of the date of this letter.
No new commitments are being made in this submittal.
Should you have any questions or require additional information, please contact Mr.
Alan I. Hassoun of my staff at (734) 586-4287.
Sincerely, Keith J. Polson Site Vice President
Enclosure:
Revised Relief Request PRR-007 for the IST Third 10-Year Interval cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
Enclosure to NRC-16-0028 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Revised Relief Request PRR-007 for the IST Third 10-Year Interval
Enclosure to NRC-16-0028 Page 1 10 CFR 50.55a Relief Request PRR-007, Revision 1 Relief from Comprehensive Pump Testing Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1)
Alternative Provides Acceptable Level of Quality and Safety
- 1. ASME Code Component(s) Affected ASME Vertical Line Pump No. Description Class Shaft Pump E1102C002A RHR Pump A 2 No E1102C002B RHR Pump B 2 No E1102C002C RHR Pump C 2 No E1102C002D RHR Pump D 2 No E1151C001A RHR Service Water Pump A 3 Yes E1151C001B RHR Service Water Pump B 3 Yes E1151C001C RHR Service Water Pump C 3 Yes E1151C001D RHR Service Water Pump D 3 Yes E4101C001 High Pressure Coolant Injection Pump 2 No P4400C001A Emergency Equip Cooling Water Div 1 Pump 3 No P4400C001B Emergency Equip Cooling Water Div 2 Pump 3 No P4500C002A Emergency Equip Service Water South Pump 3 Yes P4500C002B Emergency Equip Service Water North Pump 3 Yes R3001C005 EDG 11 DG Service Water Pump 3 Yes R3001C006 EDG 12 DG Service Water Pump 3 Yes R3001C007 EDG 13 DG Service Water Pump 3 Yes R3001C008 EDG 14 DG Service Water Pump 3 Yes T4100C040 South CCHVAC Chilled Water Pump 3 No T4100C041 North CCHVAC Chilled Water Pump 3 No
2. Applicable Code Edition and Addenda
ASME OM Code 2004 Edition, No Addenda
3. Applicable Code Requirement
ISTB-5123 - Comprehensive Pump Testing for Centrifugal Pumps ISTB-5223 - Comprehensive Pump Testing for Vertical Line Shaft Pumps
Enclosure to NRC-16-0028 Page 2 10 CFR 50.55a Relief Request PRR-007, Revision 1 Relief from Comprehensive Pump Testing
4. Reason for Request
Pursuant to 10 CFR 50.55a, Codes and Standards, paragraph (z)(1), relief is requested from the requirements of ASME OM Code ISTB-5123 and ISTB-5223. The basis of the relief request is that the proposed alternative would provide an acceptable level of quality and safety.
Table ISTB-3400-1 specifies a biennial frequency for Comprehensive Pump Testing (CPT) for Group A and Group B pumps. ISTB-5123 describes the specific requirements for performance of CPT for centrifugal pumps. Performance of the biennial CPT on the identified pumps are unnecessary since the existing quarterly pump tests are performed at sufficient flow rate to adequately monitor for pump degradation.
- 5. Proposed Alternative and Basis for Use Fermi 2 proposes to perform the quarterly testing of these pumps individually at their existing test flow-rates or higher using 0.5 % accuracy requirements for determining pump differential pressure (DP). Furthermore, Fermi 2 will utilize a maximum acceptable DP limit of 106% or lower for quarterly testing which is also consistent with recent Code changes applicable to CPT.
The 2004 edition of the ASME OM Code (Section ISTB-3300) requires that CPT be performed within 20% of the design flow rate. This can be interpreted as either the design accident flow rate, design point, or the best efficiency point provided that the testing is performed in a region of the pump curve where there is a linear flow to head relationship.
This is necessary to properly monitor for degradation. Table 1 below describes where each of the pumps is tested with respect to pump curve or design requirements.
Table 1
+/- 20% Design +/- 20% Best Linear Pump Accident Flow Efficiency Point Region of Rate Flow Rate Pump Curve RHR RHR Service Water High Pressure Coolant Injection Emergency Equipment Cooling Water Emergency Equipment Service Water DG Service Water CCHVAC Chilled Water
Enclosure to NRC-16-0028 Page 3 10 CFR 50.55a Relief Request PRR-007, Revision 1 Relief from Comprehensive Pump Testing ASME Code Case OMN-18 will allow owners to perform a Group A test in lieu of the CPT if the Group A test is conducted at the CPT flow rate using pressure instruments that meet the CPT accuracy requirements. The basis behind this change is that quarterly Group A pump testing performed at the CPT flow rate is more effective in assessing the pumps operational readiness, through trending, than a Group A test at lower flows in conjunction with a biennial CPT. Quarterly testing at CPT equivalent flow rates provides accurate data eight times as often as the CPT for trending purposes. This data is on a linear sloped portion of the pump curve where small changes in pump hydraulic performance are more easily detected.
Therefore, when the actual CPT is identical to what would amount to a Group A test with the same instrumentation, there is no added value in performing a separate CPT with reduced required action limits.
In conclusion, using the provisions of this relief request as an alternative to the specific CPT requirements of ISTB-5123 and ISTB-5223 will provide adequate indication of pump performance, permit early detection of component degradation, and continue to provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(z)(1), Fermi 2 requests relief from the specific ISTB requirements identified in this request.
- 6. Duration of Proposed Alternative This proposed alternative will be utilized for the remainder of the third 120 month interval.
- 7. Precedents ASME has approved Code Case OMN-18 which will allow for the substitution of quarterly Group A pump testing in lieu of CPT. As a conservative exception to OMN-18, Fermi 2 will be imposing a tighter maximum DP acceptance criteria of 106% to quarterly testing.
Fermi 2 - Evaluation of Relief Request Nos: PRR-004, PRR-005, PRR-007, and PRR-010 for the Third 10-Year Interval Inservice Program (TAC Nos. ME2552, ME2553, ME2554, ME2559), dated July 6, 2010 (ML101670372)