October 2002 Monthly Operating Report for Fermi 2
ML023240439
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/12/2002
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-0082
Download: ML023240439 (4)


Text

Fermi 2 6400 North Dixie Hwy, Newport, MI 48166 Detroit Edison Reg. Guide 1.16 November 12, 2002 NRC-02-0082 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Subject:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43 Monthly Operating Status Report for October 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for October 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 DATE November 12, 2002 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 OPERATING STATUS

1.

Unit name: Fermi 2

2.

Reporting period: October 2002

3.

Licensed thermal power (MWt): 3430

4.

Nameplate rating (Gross MWe): 1217

5.

Design elect rating (Net MWe): 1150

6.

Max dependable cap (Gross MWe): 1140

7.

Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe I,

10.

Reasons for restrictions, if any:

Zet):

N/A N/A "THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 745 702.7 0

687.3 0

2,307,456 782,619 751,040 92.3%

92.3%

92.6%

87.7%

7.7%

YEAR TO DATE 7,296 7,254 0

7,238 0

24,100,008 8,100,902 7,760,505 99.2%

99.2%

97.7%

-92.5%

0.8%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each):

03/28/2003, 30 days

25.

If shutdown at end of report period, estimated date of startup: N/A

26.

Units in test statds (prior to commercial operation): N/A CUMULATIVE 129,494 98,890 0

95,136 0

300,870,419 99,294,299 94,951,925 73.5%

73.5%

75.5% (1) 70.8% (1) 15.8%

Refueling Outage 9, Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE November 12, 2002 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 Month October 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1093 17 1131 2

683 18 1126 3

0 19 1123 4

0 20 1129 5

371 21 1130 6

1003 22 1126 7

1117 23 1130 8

1122 "24 1129 9

1122 25 1126 10 1119 26 1127 11 1115 27 1129 12 1117 28 1129 13 1123 29 1129 14 1130 30 1129 15 1125 31 1131 16 1127

"* "1"

  • UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 November 12, 2002 COMPLETED BY:

TELEPHONE:

Ron Stiemsma (734) 586-1656 REPORT MONTH October 2002 (2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4) Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)

(5)

Same Source as (4)

(6) R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7) Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.

Method of LER Sys Code (4)

Comp Cause and Corrective Action to shutting down No.

Code (5)

Prevent Recurrence reactor or reducing power (3) 3 02-004 KE P

Turbine trip and automatic reactor scram due to decrease in condenser vacuum caused by circulating water pump failure.

I

.1.

(1)

F: Forced S: Scheduled