Letter Sequence Other |
---|
TAC:MD1414, (Open) TAC:MD1415, (Open) TAC:MD1416, (Open) TAC:MD1417, (Open) TAC:MD1418, (Open) TAC:MD1419, (Open) TAC:MD1420, (Open) TAC:MD1421, (Open) TAC:MD1422, (Open) TAC:MD1423, (Open) |
Results
Other: ML070810264, NOC-AE-06002076, Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43), NOC-AE-06002085, Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423), NOC-AE-07002161, Weld Overlay Examination Results (RR-ENG-2-43), NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43), NOC-AE-08002297, Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423), NOC-AE-08002323, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)
|
MONTHYEARNOC-AE-06002000, Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-05-0101 May 2006 Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Request NOC-AE-06002055, Response to NRC Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of Weld Overlay (RR-ENG-2-43)2006-08-22022 August 2006 Response to NRC Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of Weld Overlay (RR-ENG-2-43) Project stage: Response to RAI NOC-AE-06002066, Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-09-19019 September 2006 Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Request NOC-AE-06002068, Response to Request for Additional Information: Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-09-28028 September 2006 Response to Request for Additional Information: Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Response to RAI NOC-AE-06002076, Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43)2006-11-0101 November 2006 Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43) Project stage: Other NOC-AE-06002085, Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423)2006-11-29029 November 2006 Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423) Project stage: Other ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) Project stage: Other NOC-AE-07002161, Weld Overlay Examination Results (RR-ENG-2-43)2007-05-0101 May 2007 Weld Overlay Examination Results (RR-ENG-2-43) Project stage: Other NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2007-05-29029 May 2007 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) Project stage: Other NOC-AE-08002297, Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423)2008-04-29029 April 2008 Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423) Project stage: Other NOC-AE-08002323, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2008-06-18018 June 2008 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) Project stage: Other 2006-09-28
[Table View] |
Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423)ML081270090 |
Person / Time |
---|
Site: |
South Texas ![STP Nuclear Operating Company icon.png](/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png) |
---|
Issue date: |
04/29/2008 |
---|
From: |
Jenewein B South Texas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
NOC-AE-08002297, TAC MD1414, TAC MD1415, TAC MD1416, TAC MD1417, TAC MD1418, TAC MD1419, TAC MD1420, TAC MD1421, TAC MD1422, TAC MD1423 |
Download: ML081270090 (4) |
|
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ectElectric Generation Stat/on P.O. ox 289 Wadsworth, Texas 77483 v April 29, 2008 NOC-AE-08002297 File No.: G25 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Unit 1 Docket Nos. STN 50-498 Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC No. MD1414-1423)
Reference:
Letter from Brandon Jenewein, STPNOC, to NRC Document Control Desk, "Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43) (TAC Nos. MD1414-1423)," dated November 1,2006 Pursuant to 10 CFR 50.55a(a)(3)(i), STP Nuclear Operating Company (STPNOC) requested approval to use an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section Xl for the structural weld overlays on the South Texas Project Unit 1 and Unit 2 pressurizer spray, relief, safety and surge nozzle safe-ends. Ultrasonic examination of the weld overlays was to be performed to support NRC approval of the STPNOC request. STPNOC completed the ultrasonic examination for the South Texas Project Unit 1 pressurizer nozzle safe-end weld overlays on April 16, 2008, during the recent Unit 1 refueling outage (1RE14). A summary of the ultrasonic examination results for the Unit 1 pressurizer spray, relief, and safety nozzle safe ends is attached. The Unit 1 pressurizer surge nozzle was examined in October 2006 (1 RE1 3) and the results were reported as referenced above.
No repairs to the overlay material and/or base metal were required or performed.
There are no commitments in this submittal.
If there are any questions, please contact either Mr. Philip Walker at (361) 972-8392 or me at (361) 972-7431.
Brandon Jenewein Manager, Testing/Programs PLW
Attachment:
Summary of Ultrasonic Examination Results for 1 RE1 4
/( 04-'
STI: 32305584
NOC-AE-08002297 Page 2 of 2 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis &.Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Mohan C. Thadani Thad Hill Senior Project Manager Steve Winn U.S. Nuclear Regulatory Commission Catherine Callaway One White Flint North (MS 7 D1) Brad Porlier 11555 Rockville Pike Eddy Daniels Rockville, MD 20852 Staney Rostad NRG South Texas LP Richard A. Ratliff J. J. Nesrsta Bureau of Radiation Control R. K. Temple Texas Department of State Health Services E. Alarcon 1100 West 49th Street Kevin Polio Austin, TX 78756-3189 City Public Service C. M. Canady C. Kirksey City of Austin City of Austin Electric Utility Department 721 Barton Springs Road Jon C. Wood Austin, TX 78704 Cox Smith Matthews Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483
Attachment NOC-AE-08002297 Page 1 of 2 South Texas Project Unit 1 Summary of Ultrasonic Examination Results for 1 RE14 Ultrasonic Examination Procedure The weld overlay examinations were performed using Structural Integrity Associates procedure SI-UT-126, Revision 3, Procedure for the Phased Array Ultrasonic Examination of Weld Overlaid Similar and Dissimilar Metal Welds. The procedure and the examiners who applied the procedure are qualified through the Performance Demonstrative Initiative (PDI) Program at the Electric Power Research Institute Non-Destructive Examination Center.
Examination Regions: Weld Overlay Material, Outer 25% Dissimilar Metal Weld and Adjacent Base Material, and Outer 25% Safe End-to-Pipe Weld & Adjacent Base Material Axial Examination Angles: 00 through 840 Circumferential Examination Angles: 00 through 670 The examination gain was adjusted to maintain the procedure-specified baseline noise level from 5% to 20% of full screen height. The lower range of examination angles detected responses from the inside surface of the component which were useful for monitoring search unit contact / coupling effectiveness during the examination.
Spray Nozzle N2 Weld Overlay Examination Component Identification: PZR-1 -N2-SE-WOL Examination Summary: Examiridtion of the required volumes in the weld overlay and underlying upper 25% of the base material found no flaw indications. A small axial indication (length 0.7", through-wall dimension 0.16") in the underlying base metal was recorded at the inside diameter surface near the austenitic metal weld (Safe End-to-Pipe). The location is outside the scope of the weld overlay process. The indication is acceptable as evaluated to the criteria of ASME Section XI Code Case N-504-2, Appendix Q, and Table IWB-3514-2.
99.6% coverage of the Code-required volume was achieved for the weld overlay for the dissimilar metal weld (Safe End-to-Nozzle). 100% coverage of the Code-required volume was achieved for the weld overlay for the austenitic metal weld (Safe End-to-Pipe); the limitation is due to the nozzle configuration relative to the weld overlay.
Safety Nozzle N3 Weld Overlay Examination Component Identification: PZR-1 -N3-SE-WOL Examination Summary: Examination of the required volumes in the weld overlay identified two laminar indications in the weld overlay volume for the austenitic weld (Safe End-to-Elbow). The laminar indications were evaluated to the requirements of ASME Section XI Code Case N-504-2, Appendix Q, and Tables IWB-3514-3 and IWB-3514-2 and found to be acceptable. No flaw indications were found in the underlying upper 25% of the base material.
100% coverage of the Code-required volume was achieved.
Attachment NOC-AE-08002297 Page 2 of 2 Relief Nozzle N4A Weld Overlay Examination Component Identification: PZR-1-N4A-SE-WOL Examination Summary: Examination of the required volumes in the weld overlay and, underlying upper 25% of the base material found no flaw indications.
100% coverage of the Code-required volume was achieved.
Safety Nozzle N4B Weld Overlay Examination Component Identification: PZR-1-N4B-SE-WOL Examination Summary: Examination of the required volumes in the weld overlay and underlying upper 25% of the base material found no flaw indications.
100% coverage of the Code-required volume was achieved.
Safety Nozzle N4C Weld Overlay Examination Component Identification: PZR-1-N4C-SE-WOL Examination Summary: Examination of the required volumes in the weld overlay and underlying upper 25% of the base material found no flaw indications.
100% coverage of the Code-required volume was achieved.