NOC-AE-06002066, Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)

From kanterella
(Redirected from NOC-AE-06002066)
Jump to navigation Jump to search

Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)
ML062690505
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/19/2006
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G25, NOC-AE-06002066, RR-ENG-2-43, STI: 32055441, TAC MD1414, TAC MD1415, TAC MD1416, TAC MD1417, TAC MD1418, TAC MD1419, TAC MD1420, TAC MD1421, TAC MD1422, TAC MD1423 RR-ENG-2-43
Download: ML062690505 (3)


Text

N eOarOp ompany South km Ek£0k Gen'aq..i*ao PO. A 2839 Wiwrif, Tkw 77483 A A *,-

September 19, 2006 NOC-AE-06002066 File No.: G25 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) (TAC Nos. MD1 414-1423)

References:

(1) Letter dated May 1, 2006, from M. J. Berg, STPNOC, to NRC Document Control Desk, "Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)," (NOC-AE-06002000)

(2) Letter dated August 22, 2006, from M. J. Berg, STPNOC, to NRC Document Control Desk, "Response to Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)," (NOC-AE-06002055)

During review of references 1 and 2, the NRC determined that a commitment to provide information on the results of the ultrasonic examinations of the South Texas Project pressurizer weld overlays is required for approval of Relief Request RR-ENG-2-43.

In accordance with this request, STP Nuclear Operating Company (STPNOC) will provide the details of the ultrasonic examination results to the NRC within 14 days following completion of the respective final ultrasonic examinations of the Unit 1 and Unit 2 pressurizer spray, relief, safety, and surge nozzle safe-ends structural weld overlays. STPNOC will notify the NRC Project Manager for the South Texas Project when the examination of the final structural weld overlay for each unit is complete.

The attachment to this letter lists the commitments.

If there are any questions, please contact either Mr. Philip Walker at (361) 972-8392 or me at (361) 972-7867.

David W. Rencurrel Vice President Engineering

& Strategic Projects PLW

Attachment:

List of Commitments STI: 32055441 74 7

NOC-AE-06002066 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Richard A. Ratliff Steve Winn Bureau of Radiation Control Christine Jacobs Texas Department of State Health Services Eddy Daniels 1100 West 49th Street NRG South Texas LP Austin, TX 78756-3189 C. Kirksey City of Austin Senior Resident Inspector J. J. Nesrsta U. S. Nuclear Regulatory Commission R. K. Temple P. 0. Box 289, Mail Code: MN1 16 E. Alarcon Wadsworth, TX 77483 City Public Service C. M. Canady Jon C. Wood City of Austin Cox Smith Matthews Electric Utility Department 721 Barton Springs Road Austin, TX 78704

Attachment NOC-AE-06002066 Page 1 of 1 LIST OF COMMITMENTS The following table identifies the actions in this document to which the STP Nuclear Operating Company has committed. Statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments. Please direct questions regarding these commitments to Philip Walker at (361) 972-8392.

Commitment Expected CR Action Nos.

Completion Dates STPNOC will notify the NRC Project Manager for the 10/31/2006 (Unit 1) 05-15744-42 South Texas Project when the examination of the final 04/30/2007 (Unit 2) 05-15744-44 structural weld overlay for each unit is complete.

STPNOC will provide the details of the ultrasonic 11/07/2006 (Unit 1) 05-15744-43 examination results to the NRC within 14 days following 05/07/2007 (Unit 2) 05-15744-45 completion of the respective final ultrasonic examinations of the Unit 1 and Unit 2 pressurizer spray, relief, safety, and surge nozzle safe-end structural weld overlays.