MONTHYEARML0322303162003-06-27027 June 2003 Draft Information Input, Attachment 4, e-mailed on June 27, 2003 (50-498 and 50-499) Project stage: Draft Other NOC-AE-03001561, Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32, for South Texas Project, Unit 12003-07-0303 July 2003 Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32, for South Texas Project, Unit 1 Project stage: Supplement NOC-AE-03001559, Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-322003-07-0303 July 2003 Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 Project stage: Response to RAI NOC-AE-03001563, Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-322003-07-17017 July 2003 Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 Project stage: Supplement ML0321101972003-07-30030 July 2003 Ltr, Request for Withholding Information from Public Disclosure Per Section 2.790 of Title 10 of the Code of the Federal Regulations Project stage: Withholding Request Acceptance 2003-07-17
[Table View] |
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Te sPrr Ekdrt& Gecraff Stifon PO. Box 289 Ab$ h kws 7743 July 17, 2003 NOC-AE-03001563 10CFR50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Unit 1 Docket No. STN 50498 Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 (TAC No. MB9696)
Reference:
Letter, S. E. Thomas to NRC Document Control Desk, "Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 (TAC No. MB9696)," dated July 3,2003 (NOC-AE-03001559)
The NRC informally requested additional information regarding our response submitted in the referenced letter. The response to that information request is provided in the enclosure to this letter.
If there are any questions regarding this response, please contact Mr. Michael Lashley at 361-972-7523 or me at 361-972-7902.
Mark E. Kanavos Manager, Design Engineering jtc j\OD47
Enclosure:
Supplemental Response to Request for Additional Information STI: 31630261
NOC-AB-03001563 Page 2 cc:
(paper copy) (electronic copy)
Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 L. D. Blaylock Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP Texas Central Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
NOC-AE-03001563 Enclosure Page I of 2 Supplemental Response to Request for Additional Information
- 1. [Regarding the response to Question #2] The licensee indicated that the geometry of the nozzle component gap creates the geometry of a crevice and that the corrosion rate was deemed acceptable under WCAP 15973-P, Rev. 0. The licensee stated that: "The component corrosion analysis used the methodology documented in WCAP 15973-P, Rev. 0, which was reviewed by the NRC and a safety evaluation was issued."
There is no record in ADAMS that I could find of an existing safety evaluation issued by the staff for the subject WCAP. There is however, an RAI letter issued July 2, 2003 on the subject WCAP. These two items indicate to me that the safety evaluation the licensee referred to has not been issued.
Response
The appropriate reference is CE NPSD-1 198-P Rev. 0, which was approved by NRC Safety Evaluation dated February 8, 2002. WCAP 15973-P was submitted for NRC review to correct an error in the NPSD-1 198 flaw growth analysis; however, the corrosion evaluation is not affected.
- 2. [Regarding the response to question #61 The licensee stated that their successive inspections would be BMV. I don't believe this is sufficient for the following reasons:
a) Lack of field experience with this type of repair b) Typically, other licensees agree and perform post repair UT c) The .004" gap between the old and new nozzle sections allow boron to enter in the annulus, which may cause an environment similar to the Davis-Besse configuration, depending on the amount of cracking in the original J-groove weld.
d) The annulus should be monitored for changes each outage along with the BrM1V due to c).
e) The Topical Report the licensee cites previous field experience of half-nozzle repairs performed at ANO-1 in 1990. The repair was UT inspected at the 1st and 2nd refueling outages and is currently UT inspected on an every-other-cycle basis. In light of the existing Order, recent field experience and the new location of cracking in the lower head, the monitoring program of just a BMV proposed by the licensee is not adequate.
NOC-AE-03001563 Enclosure Page 2 of 2
Response
Combustion Engineering plants have extensive experience with half-nozzle repairs to pressurizer heater penetrations and reactor coolant system (RCS) instrument penetrations. No special successive examinations are required by Code Case N-638. The half-nozzle configuration results in a very low oxygen environment in a very tight annular region that is not comparable to the Davis-Besse configuration. WCAP 15973-P addresses the differences between the half-nozzle and Davis-Besse in more detail.
The old J-groove weld is no longer part of the pressure boundary and any cracking in the weld would have no effect on the boron in the annulus area. The annular region will be exposed to RCS water at the 1/16" to 1/8" gap between the top half-nozzle and the bottom half-nozzle.
STP Nuclear Operating Company (STPNOC) performed UT examination of the reactor vessel bottom head (RVBH) BMI bore hole areas of Penetrations 1 and 46 as a baseline for future wastage monitoring. STPNOC will perform UT examinations of the RVBH base material around one of these two BMI penetrations for the next two alternate refueling outages (i.e.,
lRE13 and RE15) to confirm there is no indication of RVBH base material wastage from RCS water in the annulus region of the repaired penetration. The results of the UT examination will be applicable to both repaired penetrations because both penetrations have the same design configuration, materials, and operating environment. If any indication of wastage is detected by these UT examinations, the corrosion monitoring will be extended to the other repaired penetration during that outage.