NOC-AE-03001500, Revision to Year 2002 10CFR-50.46 Annual Report of ECCS Model Revisions for South Texas Project, Units 1 & 2

From kanterella
Jump to navigation Jump to search
Revision to Year 2002 10CFR-50.46 Annual Report of ECCS Model Revisions for South Texas Project, Units 1 & 2
ML031010477
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/08/2003
From: Leazar D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-03001500
Download: ML031010477 (5)


Text

Nuclear Operating Company nertInSSLtbon PO, B289 Wadmwrth Tws77483 South TeasPrjctEedrlc Gcr April 8, 2003 NOC-AE-03001500 10CFR50.46 File: G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Revision to the Year 2002 10CFR50.46 Annual Report of ECCS Model Revisions

References:

1) Letter from D. A. Leazar to NRC Document Control Desk, "IOCFR50.46 Thirty-Day Report of Significant ECCS Model Changes," dated December 17, 2002 (NOC-AE-02001441)
2) Letter from D. A. Leazar to NRC Document Control Desk, "10CFR50.46 Annual Report of ECCS Model Revisions," dated January 9, 2002 (NOC-AE-02001233)
3) Letter from D. A. Leazar to NRC Document Control Desk, "IOCFR50.46 Thirty-Day Report of Significant Changes to the Accepted ECCS Model," dated October 19, 1999 (NOC-AE-000683)
4) Letter from D. A. Leazar to NRC Document Control Desk, "10CFR50.46 Annual Report of ECCS Model Revisions and 30-Day Report of Significant ECCS Model Changes," dated December 13, 2000 (NOC-AE-00000980)
5) Letter from D. A. Leazar to NRC Document Control Desk, "10CFR50.46 Annual Report of ECCS Model Revisions," dated December 17, 1998 (NOC-AE-000390)
6) Letter from D. A. Leazar to NRC Document Control Desk, "10CFR50.46 Annual Report of ECCS Model Revisions," dated February 11, 2003 (NOC-AE-03001464)

This letter constitutes a revision to the year 2002 10CFR50.46 Annual Report of ECCS Model Revisions (Reference 6). Subsequent to submitting Reference 6 it was determined that the report incorrectly characterized an input change associated with the Large Break Loss of Coolant Analysis (LBLOCA). Specifically, Reference 6 stated that the gamma energy deposition model (GEDM) inputs had been revised from reduced values to the default GEDM inputs. Instead, reduced GEDM inputs, between the previously used "reduced" inputs and the default inputs, were included in the limited scope reanalysis. The use of the new reduced GEDM inputs provides some PCT benefit.

The reduced GEDM inputs will continue to be verified as part of the reload design process.

0 /QUALITYANDLICENSING/NVINrc-ap/Misc-03/03001500 (50 46 year end report-Rev.1) doc STI 31580832

NOC-AE-03001500 Page 2 The error in the report had no impact on the analysis results and no changes were made to (2002 Year end PCT Rack-Ups). Specific changes associated with the correct characterization of the use of reduced GEDM factors have been incorporated into the following text.

Pursuant to 10CFR50.46(a)(3)(ii), the South Texas Project (STP) submits this annual report concerning revisions to the accepted Emergency Core Cooling System (ECCS) evaluation model at STP Units 1 and 2.

As documented in Reference 1, STP implemented a revised Small Break Loss of Coolant Accident (SBLOCA) analysis of record during 2002. The current SBLOCA Peak Clad Temperature is 1578 0 F for Unit 1 and Unit 2. No other SBLOCA ECCS model revisions were made in 2002.

During 2002, Westinghouse performed a limited scope Large Break Loss of Coolant Accident (LBLOCA) reanalysis to address concerns related to boiling in the downcomer. Details of the large break LOCA limited scope reanalysis are provided below. The PCT results of both the small break and large break LOCA analyses continue to remain below the acceptance criterion of 22000 F.

Details of the LBLOCA Limited Scope Reanalysis A methodology has been developed by Westinghouse to extend the BASH-EM transient beyond the point at which downcomer boiling is predicted to occur in the BASH computer code. The new methodology models the reduction in core inlet flooding rate due to boiling in the downcomer. The impact of the methodology change on STP Units 1 and 2 was assessed through a limited scope reanalysis. As part of the limited scope reanalysis of the LBLOCA, a corrected version of the LOCBART code was used to account for the impact of downcomer boiling on the peak cladding temperature and cladding oxidation transients. As a result, all existing PCT assessments for LOCBART errors, as listed below, were eliminated.

  • Change in LBLOCA PCT based on the 1999 limiting case reanalysis following the correction of errors in the LOCBART code (Reference 3)
  • LOCBART Dispersed Flow Regime Wall Emissivity Error (Reference 4)
  • LOCBART Vapor Film Flow Regime Heat Transfer Error (Reference 4)
  • LOCBART Cladding Emissivity Errors (Reference 2)

The previous LBLOCA PCT rack-ups included unit specific PCT benefits for the use of reduced Gamma Energy Deposition Model (GEDM) factors. In the limited scope reanalysis, reduced GEDM factors were included in the analysis. As a result, the separate PCT assessment associated with the use of reduced GEDM factors has been eliminated. The reduced GEDM factors will continue to be verified during the reload design process.

0 /QUALrl'YAND-LICENSING/NVNrc-ap/Misc-03/03001500 (50 46 year end report-Rev.1) doc STI 31580832

NOC-AE-03001500 Page 3 In addition, the limited scope reanalysis did not include an assessment for potential conditions in 0

which the accumulator water temperatures would exceed 90'F. The previously reported 26 F PCT assessment for operation with safety injection accumulator water temperature temperatures between 90'F and 110'F (Reference 5) has been eliminated. An STP evaluation demonstrates that the original LBLOCA assumption of a maximum accumulator water temperature of 90'F is valid for STP Units 1 and 2. The evaluation demonstrates that the containment temperature 0

would exceed the Technical Specification 3.6.1.5 limit of 110 F prior to any accumulator temperature reaching 90'F.

Significance Determination IOCFR50.46(a)(3)(i) requires the holder of an operating license to determine if any change to or error in an evaluation model or in the application of such a model is significant based on guidelines identified in 10CFR50.46. For the significance determination, the changes associated with the GEDM factor benefit and the elimination of the PCT assessment for accumulator water temperatures in excess of 90 'F are not considered. Neither of these changes represents changes to the evaluation model, nor are the changes associated with an error in the evaluation model or the evaluation model inputs. Reduced GEDM factors were included in the reanalysis. The separate PCT assessment associated with the use of reduced GEDM factors has been eliminated.

The accumulator water temperature assessment was included to address a potential condition 0

which has since been found to be not credible. For the downcomer boiling issue, a single 46 F PCT assessment is added to the result of the analysis of record, resulting in a revised Unit 1 /

0 Unit 2 LBLOCA PCT of 2136 0 F. The revised Peak Clad Temperature (PCT) represents a 39 F reduction for Unit 1 from the last year-end report and a 420 F reduction for Unit 2 from the last year-end report. Since the impact of this change is less than 50 'F, the change is not significant in accordance with 10CFR50.46.

Attachment 1 provides the current ECCS evaluation model PCT rack-ups. The acceptance criteria for all models continue to be satisfied.

If you should have any questions concerning this matter, please contact Mr. Safdar Hafeez at (361) 972-8906 or me at (361) 972-7795.

D. A. Leaz Director Nuclear Fuel and Analysis jmw/kaw

Attachment:

2002 Year End PCT Rack-ups 0 /QUALXTYANDLICENSING/NI/Nrc-ap/Misc-03/03001500 (50 46 year end report-Rev.1) doc S'n 31580832

NOC-AE-03001500 Page 4 cc:

(paper copy) (electronic copy)

Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 L. D. Blaylock Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 0 /QUAL1TY_ANDLICENSING/NVNrc-ap/Misc-03/03001500 (50 46 year end report-Rev.1) doc STI 31580832

NOC-AE-03001500 Attachment 1 Page 1 of 1 ATTACHMENT 1 2002 YEAR END PCT RACK-UPS Unit 1 and Unit 2 Large Break LOCA:

Large Break LOCA Analysis of Record (Reference 5) 2090 OF Limited Scope Reanalysis to Address Boiling in the Downcomer + 46 IF Revised Year End Large Break LOCA PCT 2136 OF Unit 1 and Unit 2 Small Break LOCA:

2002 Reanalysis (Reference 1) 1578 OF 0 IQUALITYANDLICENSING/NVNrc-ap/Misc-03/03001500 (50 46 year end report-Rev 1) doc STI 31580832