NL-11-036, Submittal of Revision 11 to Physical Security, Training and Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation, Security Program.

From kanterella
Jump to navigation Jump to search
Submittal of Revision 11 to Physical Security, Training and Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation, Security Program.
ML111040601
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/12/2011
From: Joseph E Pollock
Entergy Corp
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
NL-11-036
Download: ML111040601 (2)


Text

Indian Point Energy Center 450 Broadway, GSB

%EnterWy P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 734-6700 J.E. Pollock Site Vice President SAFEGUARDS INFORMATION Administration NL-1 1-036 April 12, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852

SUBJECT:

Submittal of Revision 11 to "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" Indian Point Unit Nos. 1, 2, and 3 Docket Nos. 50-03, 50-247, and 50-286 License Nos. DPR-5, DPR-26 and DPR-64

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (ENO) has revised the IPEC "Physical Security, Training and Qualification, Safeguards Contingency Plan, And Independent Spent Fuel Storage Installation Security Program" to implementation of the security rule scheduled for March 2010 with some aspects rescheduled to February 2011. This revision is included in Enclosure 1. Attachment 1 contains a description of the changes in the required format.

The changes were evaluated pursuant to 10 CFR 50.54(p)(2) and do not decrease the safeguards effectiveness of the plan.

This letter includes no new commitments. If you have any questions, or require additional information, please contact Mr. Robert Walpole, Manager, Licensing at (914) 734-6710.

Sincerely, cc next page SAFEGUARDS INFORMATION Attachment 1 and Enclosure 1 contain Safeguards Information. When separated from Attachment 1 and Enclosure 1 this letter is not Safeguards.

<ýý 0c) I

NL-1 1-036 Docket Nos. 50-03, 50-247, and 50-286 Page 2 of 2 Attachment 1 -

SUMMARY

OF CHANGES TO "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" Enclosure 1 Revision 11 to IPEC "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" cc: Mr. William Dean, Regional Administrator, NRC Region I with / Attachment and Enclosure Mr. J. Boska, Senior Project Manager, NRC, NRR, DORL with / out Attachment or Enclosure Mr. E. Leeds, Director, NRC, NRR with / out Attachment or Enclosure Mr. Stephen Giebel, NRC, FSME, DURLD with / out Attachment or Enclosure Resident Inspector's Office with / Attachment and Enclosure Mr. Paul Eddy, NYS Dept. of Public Service with / out Attachment or Enclosure Mr. Francis J. Murray, Jr., President and CEO, NYSERDA with / out Attachment or Enclosure SAFEGUARDS INFORMATION Attachment 1 and Enclosure 1 contain Safeguards Information. When separated from Attachment 1 and Enclosure 1 this letter is not Safeguards.