Southern Nuclear Operating Company, Inc.
Post Offi ce Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERNA June 27,2008 COMPANY Energy to Serve Your WorldS" Docket No.: 50-364 NL-08-0884 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 2 Request for Additional Information (RAI) for Proposed Alternative FNP-ISI-ALT-01 Ladies and Gentlemen:
In letter dated October 8,2007, Southern Nuclear Company (SNC) requested, pursuant to 10 CFR 50.55a(a)(3)(i), NRC approval of proposed alternative FNP-ISI-ALT-01, Version 1.0 to allow Farley Nuclear Plant (FNP) Unit 2 lSI interval dates to correspond to the Unit 1 lSI interval dates.
This alternative was requested to remain in effect throughout the licensed life of FNP-2.
On May 8, 2008, a NRC RAI was received regarding the proposed alternative. The SNC response to the requested information is provided in the Enclosure.
If you have any questions, please advise.
Sincerely,
~~t>f-:
M. J. Ajluni Manager, Nuclear Licensing MJA/BDM/daj
U. S. Nuclear Regulatory Commission NL-08-0884 Page 2
Enclosure:
SNC Response to NRC Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley RTYPE: CFA04.054; LC# 14780 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. A. Jeryey, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley
Joseph M. Farley Nuclear Plant - Unit 2 Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-Ol, Version 1.0 Proposed Alternative
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative
- 1. Clarify that the current code of record for Farley Nuclear Plant (FNP) Unit 2 third ten-year in-service inspection (lSI) interval is the 1989 Edition of the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section XI, no addenda, and the 2001 Edition of ASME Code,Section XI, through 2003 addenda is for the fourth ten-year lSI interval.
SNC Response - The code of record for Farley Nuclear Plant (FNP) Unit 2 third ten-year in-service inspection (lSI) interval is the 1989 Edition of the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section XI, no addenda, and the 2001 Edition of ASME Code,Section XI, through 2003 addenda is the code of record for the fourth ten-year lSI interval.
- 2. Please provide a table of the remaining lSI and pressure tests required for FNP Unit 2, third period of the third ten-year lSI interval including any deferred requirements prior to the proposed closing of the third lSI ten-year interval. Also provide a separate table of lSI requirements not applicable or required anymore, because of the change to a later code edition for the fourth ten-year lSI interval.
SNC Response - A list of the scheduled lSI examinations and pressure tests that remained for the third Period of the third Interval and a list of the scheduled lSI examinations and pressure tests for the first Period of the fourth Interval have been provided as a comparison in Tables 2 through 6. As the need arises, changes to the lSI scope may be made based on ALARA, craft support requirements, or other considerations. The Reconciliation column in each of the tables show any deletion of examinations no longer required in the fourth Interval because of new requirements and also discusses other deletions/additions.
- 3. Please provide clarification on completion of the third lSI interval requirements prior to starting the fourth lSI interval. Discuss how the percentage requirements of the third period of the third lSI interval will be reconciled with the percentage requirements of the fourth lSI interval.
Justify the acceptability of not performing all inspections in the first period of the fourth interval that would have been required in the third period of the third interval and would not otherwise have been deleted.
SNC Response - Percentage requirements were reconciled by evaluating Table 1 to determine if the number of examinations (and therefore the percentage of examinations) decreased, increased, or remained the same when comparing the examinations in the third Period of the third lSI Interval to the examinations in the first Period of the fourth lSI interval. Each of the Code Categories where there are scheduled lSI examinations is addressed below. Additionally, if examinations were deleted, justification is provided for the deletion.
Page 1 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative For Categories B-A, B-B, B-D, B-G-1, B-K, B-N-1, B-N-2, B-N-3, B-O, and C A the number of examinations in the third Period of the third Interval remained the same or increased when moved to the first Period of the fourth Interval. Therefore, the examinations for each of these ASME Categories meet the third Interval lSI requirements (as well as the fourth lSI Interval requirements).
For Categories B-P, C-H, and D-B (Category D-A tests per the 1989 Edition of Section XI), the scope and frequency of pressure tests in the third Period of the third Interval remained the same when moved to the first Period of the fourth Interval.
For Category C-B, one Residual Heat Removal (RHR) Heat exchanger examination was deleted in the first Period of the fourth Interval that was originally scheduled for the third Period of the third Interval. For the steam generators the examination remains the same. For the RHR Heat Exchangers, Code Case N-706 (approved for generic use by the NRC in Regulatory Guide 1.147, Revision 15) will be used to eliminate required volumetric examinations during the fourth Interval if the conditions of the Code Case are satisfied. The basis for the code case is that: (1) the heat exchangers were carefully constructed to nuclear quality requirements, (2) the heat exchangers were inspected during construction, and then during service, and there is no history of degradation, (3) the Haw tolerance of the components is very high, since their duty cycle is mild, and they are constructed of stainless steel, and (4) the risk is not significantly changed by elimination of the volumetric examinations (visual examinations are still required).
For Category C-C, two examinations were deleted in the first Period of the fourth Interval that were originally scheduled for the third Period of the third Interval. These examinations were deleted because a re-calculation of the examination requirements indicated that more examinations than necessary were scheduled. Both the third Interval and fourth Interval require that a minimum of 19 examinations be performed during the interval. Per Code Case N-598 (used for the third Interval), and at least 25% of the required examinations (or five examinations) need to be completed in the third period.
Fifteen examinations were completed by the end of the second Period of the third Interval and seven more (in lieu of the nine examinations originally scheduled for the third Period of the third Interval) are now scheduled for the first Period of the fourth lSI Interval; therefore, the third lSI Interval requirements are satisfied. Additionally, per the 2001 Edition of ASME Code,Section XI, through the 2003 addenda, 16 to 50% of the examinations should be performed during the first period. The seven examinations (35%) meet the fourth Interval requirements.
For Category D-A, one examination was deleted in the first Period of the fourth Interval that was originally scheduled for the third Period of the third Interval. This examination was deleted because a re-calculation of the Page 2 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative examination requirements indicated that more examinations than necessary were scheduled. The third Interval requires that a minimum of 28 examinations be performed during the interval. Per Code Case N-598 (used for the third Interval), at least 25% of the required examinations (or seven examinations) need to be completed in the third period. Nineteen examinations were completed by the end of the second Period of the third Interval and nine more (in lieu of the ten examinations originally scheduled for the third Period of the third Interval) are now scheduled for the first Period of the fourth lSI Interval; therefore, the third lSI Interval requirements are satisfied. For the fourth Interval, 26 examinations need to be performed during the interval. Per the 2001 Edition of ASME Code,Section XI, through the 2003 addenda, 16 to 50% of the examinations should be performed during the first period. The nine examinations (35%) meet the fourth Interval requirements.
For Category F-A, 28 examinations were deleted in the first Period of the fourth Interval that were originally scheduled for the third Period of the third Interval. These examinations were deleted because a re-calculation of the examination requirements indicated that more examinations than necessary were scheduled. The third Interval requires that a minimum of 266 examinations be performed during the interval. Per Code Case N-598 (used for the third Interval), at least 25% of the required examinations (or 67 examinations) need to be completed in the third period. One hundred and eighty one examinations were completed by the end of the second Period of the third Interval and 87 more (in lieu of the 115 examinations originally scheduled for the third Period of the third Interval) are now scheduled for the first Period of the fourth lSI Interval; therefore, the third lSI Interval requirements are satisfied. For the fourth Interval, 268 examinations need to be performed during the interval. Per the 2001 Edition of ASME Code,Section XI, through the 2003 addenda, 16 to 50% of the examinations should be performed during the first period. The 87 examinations (32%) meet the fourth Interval requirements.
For Category R-A the number of examinations in Period 3 of the third Interval increased due to Living Program requirements when moved to Period 1 of the fourth Interval. Therefore, the examinations for each of these ASME Categories meet the third Interval 151 requirements (as well as the fourth lSI Interval requirements).
Page 3 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative Third Interval Volumetric Exams TABLE 1 COMPLIANCE TABLE Fourth Interval Volumetric Exams COMMENT Total Total I Period 3 Cat. I Required Scheduled Scheduled Exams Exams Exams Total Total I Period 1 Required Scheduled Scheduled Exams Exams Exams Page 4 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 1 COMPLIANCE TABLE Cat.
Fourth Interval Volumetric Exams Total Total Period 1 Required Scheduled Scheduled Exams Exams Exams COMMENT Page 5 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative Third Interval Volumetric Exams Total I
Total I Period 3 Cat. I Required Scheduled Scheduled Exams Exams Exams TABLE 1 COMPLIANCE TABLE Fourth Interval Volumetric Exams Total I Total I Period 1 Required Scheduled Scheduled Exams Exams Exams COMMENT Page 6 of 21
8-8 Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 2 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1 COMPONENTS Third Interval (Third Period)
Fourth Interval (First Period)
Cat Item Component Item Component 81.11 APR1-1100-2 81.11 APR1-1100-2 81.11 APR1-1100-5 81.11 APR1-1100-5 APR1-1100-8 81.11 APR1-1100-8 81.11 81.12 APR1-1100-3 81.12 APR1-1100-3 8-A 81.12 APR1-1100-4 81.12 APR1-1100-4 81.12 APR1-1100-6 81.12 APR1-1100-6 81.12 APR1-1100-7 81.12 APR1-1100-7 81.21 APR1-1100-16 81.21 APR1-1100-16 81.30 81.30 APR1-1100-1 APR1-1100-1
... 'ff;~
- .,!f..*..
- ?;*..*?.
- ;;i);;**,i;;*
- i*,;@,~&~;,~!,;*r)f;;;*
- y.;....,...;,
2.*et< >f f"i'?';?!.
82.11 APR1-2100-7 82.11 APR1-2100-7 82.12 APR1-21 00-3 82.12 APR1-2100-3
- f i.e'
,)....""'.;;
.. 0>
8-D
/
". ****,i!;
83.100 APR1-1100-17IR APR1-1100-17IR 83.100 83.100 APR1-1100-18IR 83.100 APR1-1100-18IR 83.100 APR1-1100-19IR 83.100 APR1-1100-19IR 83.100 APR1-1100-20IR APR1-1100-20IR 83.100 APR1-1100-21IR 83.100 83.100 APR1-1100-21IR 83.100 APR1-1100-22IR APR1-1100-22IR 83.100 APR1-21 00-13 83.110 APR1-2100-13 83.110 83.110 APR1-2100-14 83.110 APR 1-2100-14 APR1-2100-13IR 83.120 APR1-2100-13IR 83.120 APR1-2100-14IR 83.120 83.120 APR1-2100-14IR 83.140 APR1-3300-IR1 R 83.140 APR1-3300-IR1 R 83.140 APR1-3300-IR2R 83.140 APR1-3300-IR2R
"/f
,,":1'
..........).'.
Reconciliation No change. All deferred examinations in 3'd Interval, 3'd Period now scheduled in 4th Interval, 1st Period.
';;;'...;)!;.;!*.".
,.... ; "<f'f 'j;8,!'.
'.* ****0..
No change. All examinations in the 3rd Interval, 3'd Period are now scheduled in the 4th Interval, 1 51 Period.
- ...,! *.i!;!';;;I!'f'i;ft;.'i;,'j'...*...*.*.;,,;,;;** ?,!,;;;,,;;;.;..
No examinations were deleted. Added additional examinations to the 4th Interval, 1 51 Period. The steam generators were replaced in 2001 and baseline was performed. The new generators did not have nozzle-to shell welds. Four of the six inner radii (83.140) were examined in the 2nd Period and the remaining two were scheduled for examination during the 3rd Period, 3'd Interval. All examinations in the 3'd Interval, 3'd Period are now scheduled in the 4th Interval, 1 51 Period.
To optimize the scheduling (per Code Case N 624) two of the components examined in 2007 were scheduled in the 1 51 Period instead of later in the 4th Interval.
Page 7 of 21
8-G-1 Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 2 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1 COMPONENTS Cat 8-E 8-K Third Interval (Third Period)
Fourth Interval (First Period)
Item Component Item Component Reconciliation 83.90 APR1-1100-17 83.90 APR1-1100-17 83.90 APR1-1100-18 83.90 APR1-1100-18 83.90 APR1-1100-19 83.90 APR1-1100-19 83.90 APR1-1100-20 83.90 APR1-1100-20 83.90 APR1-1100-21 83.90 APR1-1100-21 83.90 APR1-1100-22 83.90 APR1-1100-22 83.140 83.140 APR1-3100-IR1 R 83.140 APR1-3100-IR2R Not a Code Category in the 2001 Edition of Section XI, through 2003 addenda since the VT-2 exams were duplicated in the Category 86.10 I APR1-1300-N01 THRU N058 I 86.10 I APR1-1300-N01 THRU N058 86.180 APR1-5300-801 THRU 8024 86.180 APR1-5300-B01 THRU 8024 r 86.30 APR1-1300-S01 THRU S058 86.20 APR1-1300-S01 THRU S058 I No change except that Item 86.30 is now Item f------+--------'------f--'----:....----+.:...::.-'-------.:....::.--=--=----=--=---~~=----=--=-=------J 86.20.
86.40 APR1-1100-L01 THRU L058 86.40 APR1-1100-L01 THRU L058 APR1-1300-W01 THRU W058 86.50 APR1-2100-8 APR1-4201-2SI-R180 01'18) 813.10 I APR1-1200-VS INT I 813.10 I APR1-1200-VS INT I No change.
Page 8 of 21 8-N-1
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 2 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1 COMPONENTS Third Interval (Third Period)
Fourth Interval (First Period)
Component Reconciliation Cat Component Item Item
{;;';;'!;;.
- {;i.e...'
Ni;!;i,,;~~;!if. f'i/fii}/;i'i;!;'i;' 'i,1;;ii;,'1':;;; '" ;.f:: ~if; h,;,y;
- ii,
- ;;;'1!&}'
'TX; "x'" ;;X;"i!'iX /x 'i![!;';"/';') ';;e",;*;*, APR1-1100-SUP-CS-1 APR1-1100-SUP-CS-1 813.60 813.60 APR1-11 00-SUP-CS-2 APR1-1100-SUP-CS-2 813.60 813.60 No change. 8-N-2 813.60 APR1-1100-SUP-CS-3 813.60 APR1-1100-SUP-CS-3 APR1-11 00-SUP-CS-4 APR1-1100-SUP-CS-4 813.60 813.60 iff;';*.;"";hi;!;';!>'.";,. ,;)e;';;;,;,.;;;(*.;'i;>!;ii'. ). ......... filiiiJi:G';:;;'?' ';,J:,[1i:,[);;;;. ,~:/'f; 8-N-3 I;Y';';';;';';:f! ';.' /';' APR1-1200-C-SS No change. APR1-1200-C-SS 813.70 813.70 ii2;,;,,;x.;;;;;;':;;:;,*;;;,/;/';';;'!);;/;!;?; "!'::i;;;;:}>,;;';;;;!;;',;;;;/.(,... "'i;;:}';;;[/;;;;;!i ['...*.i./i;);;;;";;;:;,;;.;;
- . fif,i,;,';.
,[,.;;"";,,,,.; I;;,",.{'i;)i;:: r;; *;f,,;i; ';;T;,; Ii APR1-1300-43R-L No change except that 3 additional welds were 814.10 APR1-1300-43R-L 814.10 APR1-1300-43R-U added because deferral to the end of the APR1-1300-43R-U 814.10 814.10 8-0 APR1-1300-38R 814.10 814.10 interval (now the 1 51 Period of the 4th interval) APR1-1300-49R-L 814.10 814.10 is permissible. 814.10 APR1-1300-49R-U ";>::;;.""\\...;' 814.10 I,.,;;i:. if':,,,!;; i i;;; ",i' ;);;,)i;if;.; .. [.. /' .;',;; i./;;;';;::;;,;;,;
- i/;.
.. "'.;;/.'"...... 1\\. ",fC"" 815.10 815.11 A system leakage test (at 815.20 operating pressure) is performed each refueling outage. At or near A system leakage test (at operating 815.21 pressure) is performed each the end of the interval a The leakage test with the pressurized 815.30 refueling outage, except that at or 815.31 hydrostatic test of all the Class 1 boundary extended to all Class 1 components components in the system near the end of the interval the in the system boundary will be performed 815.40 815.10 8-P boundary must be performed in pressurized boundary must be during the 1 51 Period of the 4th Interval. This 815.41 extended to all Class 1 pressure-lieu of the system leakage test. test is equivalent to the 3 rd Interval hydrostatic 815.50 retaining components in the system test using Code Case N-498-4. 815.51 The hydrostatic test is performed 815.60 in accordance with Code Case N-boundary. 498-4 which allows operating 815.61 815.70 pressure to be used. 815.71 ) .';;':e,.,;;";';;. ;;d;;' ',,);;,;,,;';;;[;.. ",'.;";;:;;:;:"';:/";;::. i;;;;';';;;; >/
- i;;;"/
.';'".;,,;};;;,,;,;;p ..... F..,;';; .,,;;;?;;;;';; P. ..,..'. *;"!,0J[);;;;';;J. Page 9 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 2 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1 COMPONENTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Component Item Component Reconciliation B-O B16.20 Steam Generator tubing in U-Tube Design B16.20 Steam Generator tubing in U-Tube Design The extent and frequency of examination shall be governed by the plant Technical Specifications. Page 10 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 3 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 2 COMPONENTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Component Item Component Reconciliation Same number of exams scheduled; however, C-A steam generators were swapped to optimize the C-A/C-B exams. APR2-3100-6R Cl.20 APR2-3300-6R Cl.20 C1.30 APR2-3200-2R APR2-3100-2R Cl.30 I:.".... ,.. )..>::' :.<",:". ~ ~'., C2.21 APR2-3100-8R APR2-3100-8R C2.21 No change except that Code Case N-706 was CoB used to eliminate the RHR Heat Exchanger volumetric examination. C2.22 APR2-3100-IR8R C2.22 APR2-31 00-1 R8R C-C I C2.31 APR2-3500-1 (RHR Heat Ex.) .<I Z=.., 'c;". c':. '. j C3.10 APR2-3200-10R C3.10 APR2-3100-10R C3.20 APR2-4501-2RHR-R130 (W8) C3.20 APR2-4501-2RHR-R130 (W8) C3.20 APR2-4506A-RHR-2A4 (WS) C3.20 C3.20 APR2-4511-2SI-R218 (W8) C3.20 APR2-4511-2SI-R218 (W8) There is a net difference of 2 fewer exams C3.20 APR2-4512-CVCS-2A30 (WS) C3.20 APR2-4512-CVCS-2A30 (WS) being performed in the 4th Interval. The basis is that more examinations than necessary C3.20 APR2-4515-2CVC-R205 (W8) APR2-4515-2CVC-R205 (W8) C3.20 were scheduled in the 3rd Interval. C3.20 APR2-4517-2CVC-R231 (W8) APR2-4517-2CVC-R231 (W8) C3.20 C3.30 APR2-5120-CS-l (Wl) C3.30 C3.30 APR2-5120-CS-4 (Wl) C3.30 C3.30 APR2-5150-CS-1 (WS) C3.30 ~" ~'
- .:e..;:
- '.'.0:".
'c****"*. I CoD Not applicable to Farley. c.' ."...... I ..,....<... "'0 ~/ ~ C-F-l Not Used. Farley uses Risk-Informed lSI. c*... .... *c. ", c'
- .,~:..... ;..~....
C-F-2 Not Used. Farley uses Risk-Informed lSI. .c, '. . c,:.' ,**c,**. CoG Not applicable to Farley.
- c:
Page 11 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 3 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 2 COMPONENTS Fourth Interval (First Period) Third Interval (Third Period) Cat Item C-H C7.10 C7.20 C7.30 C7AO C7.50 C7.60 C7.70 C7.80 Component Item Component A system leakage test (at operating pressure) is performed each period on the Class 2 pressure-retaining components. In lieu of the system leakage test a hydrostatic test is required once during the interval. The hydrostatic test is performed in accordance with Code Case N 498-4 which allows operating pressure to be used. C7.10 A system leakage test (at operating pressure) is performed each period on the Class 2 pressure-retaining components. 'X: ')~;',,;,i', ..,. It!;.*.**... . *c*.>'.~li~f;1i.g11*>.' }. (iiC>i"';..i."".rii'['f.*Zi'.*****i **** ** t" i;;; Reconciliation A system leakage test (at operating pressure) will be performed during the 1st Period of the 4th Interval. This test is equivalent to the 3'd Interval hydrostatic test using Code Case N 498-4. \\.i.r", i" "'i"."/" ,.,'}}' i, " Page 12 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 4 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 3 COMPONENTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Component Item Component Reconciliation 01.10 0200089-1-SW 501 A An 01.10 0200089-1-SW 501A An 01.10 01.10 0205063-CCW HX2C An 01.20 EG2-045-2AFW-R44 An 01.20 EG2-045-2AFW-R44 An 01.20 EG2-046-2AFW-R85 An 01.20 EG2-046-2AFW-R85 An per Code Case N-509 in lieu of the 1989 01.20 EG2-193-2SW-R870 An 01.20 Code. O-A 01.20 EG2-208-2SW-R805 An 01.20 01.20 01.20 EG2-077-2SW-R22 An There is a net difference of 1 f 01.20 EG2-252-CCW-2A17 An 01.20 EG2-252-CCW-2A17 An is that more examinations tha 01.20 EG2-310-2SW-R208Y An 01.20 EG2-310-2SW-R208Y An n necessary were scheduled in the 3rd Interval. 01.20 EG2-457-2CCW-BR10 An 01.20 EG2-457-2CCW-BR10 An 01.20 EG2-472-2CCW-R111 An 01.20 EG2-472-2CCW-R111 An / '. 01.20 i), EG2-497-2SW-R303 An P'i!;,/)£:;"'i';',; ');,< ":,)/," 1;;0;;< /,.... -- ':*'**"/;*'ii :".'
- i...." I;;);",,;!,*,;i!,;,,';"
- !!;;';<?>.,;;';;.'
ewer exam A system leakage test (at operating pressure) is performed each period on the Class 3 pressure-retaining components. A system leakage test (at operating 01.10 In lieu of the system leakage test pressure) is performed each period O-B 01.20 a hydrostatic test is required once 02.10 on the Class 3 pressure-retaining 01.30 during the interval. The components. hydrostatic test is performed in accordance with Code Case N 498-4 which allows operating pressure to be used.
- ) ;;,,;;;;;;.;.
.;,.,. **;;x*.i... *;;;**
- .);,'<'/8/
-
- £1'1.;£/;.
,..,;!,!;;;,£!!! [!!£ .I'!;;);!£; ;.".<:'" I',i!*..);;...,//;/".,,"',; Third Interval examinations were performed being performed in the 4th Interval. The basis .';';'?;".;;;;;"; A system leakage test (at operating pressure) will be performed during the 1st Period of the 4th Interval. This test is equivalent to the 3rd Interval hydrostatic test using Code Case N 498-4. Pressure testing of Class 3 components was changed from Category O-A in the 1989 Edition of Section XI to Category O-B in the 2001 Edition through the 2003 Addenda of Section XI. '/;";'0"'i';'..u1'".,. *.*.i; ";';');;"'; ".,// / Page 13 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 5 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1, 2, AND 3 COMPONENT SUPPORTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Component Reconciliation F-A Item Component There is a net difference of 28 fewer exams APR 1-4112-SS-12382 (Class 1) F1.10 F1.10 being performed in the 4th Interval. More F1.10 APRl-4201-2SI-R184 F1.10 examinations than necessary were F1.10 APRl-4202-2SI-R146 APR 1-4202-2SI-R146 F1.10 scheduled in the 3'd Interval. F1.10 APRl-4202-2SI-R147 F1.10 APRl-4204-2SI-R137 F1.10 F1.10 F1.10 APRl-4205-2RC-R48 F1.10 F1.10 F1.10 F1.10 APRl-4207-2CVC-R658 APR1-4300-0-206238 F1.10 F1.10 APRl-4300-U-202224 APRl-4300-U-202224 F1.10 APRl-4301-2RC-R22 F1.10 F1.10 F1.10 APR 1-4301-2RC-R23 APRl-4301-2RC-R23 F1.10 F1.10 APRl-4301-2RH-R155 F1.10 F1.10 Fl.l0 APRl-4301-2RH-R89 APRl-4301-2RH-R90 F1.10 APR1-4301-2RH-R90 F1.10 F1.10 APR1-4301-2RH-R91 F1.10 APRl-4301-2RH-R91 F1.10 APRl-4302-2SI-R168 F1.10 F1.10 APR1-4302-2SI-R171 Fl.l0 F1.10 APRl-4303-2SI-R53X F1.10 F1.10 APR 1-4304-2SI-R67 APR1-4304-2SI-R67 F1.10 F1.10 APR1-4304-2SI-R73 F1.10 F1.10 APR1-4304-2SI-R74 APRl-4304-2SI-R74 F1.10 Fl.l0 APR1-4307-SS-12356 APRl-4307-SS-12356 F1.10 APRl-4307-SS-12361 APR1-4307-SS-12361 F1.10 F1.10 APR1-4308-SS-12408 APRl-4308-SS-12408 F1.10 F1.10 F1.10 APR1-4308-SS-12411 APR1-4308-SS-12411 F1.10 F1.10 APR1-4308-SS-12419 F1.10 APRl-4308-SS-12419 F1.10 APRl-4309-SS-12677 APR 1-4309-SS-12677 F1.10 Page 14 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 5 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1, 2, AND 3 COMPONENT SUPPORTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Item Component Reconciliation F1.10 Component F1.10 APRl-4502-2RC-R138 F1.10 APRl-4502-2RC-R138 F1.10 APRl-4502-2RC-R139 F1.10 APR1-4504-2RC-R140 F1.10 F1.10 APRl-4504-2RC-R143 F1.10 APRl-4504-2RC-Rl43 F1.10 APR1-4505-88-12463 F1.10 F1.10 APRl-4506-88-12367 F1.10 APR 1-4506-88-12367 F1.10 APR1-4506-88-12368 F1.10 APR 1-4506-88-12368 F1.10 F1.10 APRl-4101-2RH-R600 F-A F1.20 F1.20 APR2-1120-2CVC-R634X (Class 2) F1.20 APR2-4201-2M8-R509 F1.20 F1.20 F1.20 APR2-4613-88-12297 F1.20 APR2-4300-2M8-W-C-2 F1.20 APR2-4300-2M8-W-C-2 F1.20 APR2-4301-2M8-R502 F1.20 F1.20 APR2-4505-281-R106 F1.20 F1.20 APR2-4507-2RHR-R73 F1.20 APR2-4507-2RHR-R73 F1.20 APR2-4509-281-R124 F1.20 F1.20 APR2-4509A-281-R220 F1.20 APR2-4509A-281-R220 F1.20 APR2-4510-281-R123 F1.20 APR2-4510-281-R123 F1.20 APR2-4511-281-R50X F1.20 F1.20 APR2-4513-2CVC-R247 F1.20 F1.20 APR2-4513-CVC8-2A29 F1.20 F1.20 APR2-4515-2CVC-R205 F1.20 F1.20 APR2-4515-2CVC-R208 F1.20 F1.20 APR2-4517-2CVC-R231 F1.20 F1.20 APR2-4517-2CVC-R265 F1.20 APR2-4517-2CVC-R265 F1.20 APR2-4523-2CVC-R241 F1.20 APR2-4523-2CVC-R241 Page 15 of 21
Enclosure SNe Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 5 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1, 2, AND 3 COMPONENT SUPPORTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Item Component Component Reconciliation F1.20 APR2-4525-2CVC-R821 F1.20 APR2-4525-2CVC-R821 APR2-4526-2CVC-R824 F1.20 APR2-4526-2CVC-R824 F1.20 F1.20 APR2-4527-2CVC-R234 APR2-4527-2CVC-R234 F1.20 F1.20 APR2-4603-2SI-R133 F1.20 F1.20 APR2-4604-2SI-R59 F1.20 F1.20 APR2-4607-SI-R63 F1.20 F1.20 APR2-4613-SS-12297 F1.20 F1.20 APR2-4614-SS-12405 F1.20 APR2-4614-SS-12406 F1.20 F1.20 F1.20 APR2-4627-2SI-R333 F1.20 APR2-4627-2SI-R333 F1.20 APR2-4627-2SI-R340 APR2-4627-2SI-R340 F1.20 F1.20 APR2-4700-CS-2A7 F1.20 F1.20 APR2-4701-2CS-R327 F1.20 APR2-4701-2CS-R327 F1.20 APR2-4706-2CS-R321 F1.20 F1.20 F1.20 APR2-4708-2CS-R285 F1.20 APR2-4709-2CS-R333 APR2-4709-2CS-R333 F1.20 F1.20 APR2-4709-2CS-R334 F1.20 APR2-4709-2CS-R334 F1.20 APR2-4709-2CS-R337 APR2-4709-2CS-R337 F1.20 F-A F1.30 E6474-SS-14930 F1.30 (Class 3) F1.30 EG2-045-2AFW-R44 F1.30 EG2-045-2AFW-R44 F1.30 EG2-046-2AFW-R77 F1.30 EG2-046-2AFW-R77 F1.30 EG2-046-2AFW-R85 F1.30 EG2-046-2AFW-R85 F1.30 EG2-193-2SW-R860 F1.30 EG2-193-2SW-R860 F1.30 EG2-193-2SW-R870 F1.30 EG2-193-2SW-R870 F1.30 F1.30 EG2-193-2SW-R890 F1.30 EG2-193-2SW-R910 F1.30 EG2-193-2SW-R91 0 F1.30 EG2-199-2SW-R601 F1.30 EG2-199-2SW-R601 Page 16 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 5 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1, 2, AND 3 COMPONENT SUPPORTS Third Interval (Third Period) Fourth Interval (First Period) Cat Item Component Item Component Reconciliation F1.30 EG2-207-2SW-R720 F1.30 EG2-207-2SW-R720 F1.30 EG2-207-2SW-R725 EG2-207-2SW-R725 F1.30 F1.30 EG2-208-2SW-R805 EG2-208-2SW-R805 F1.30 F1.30 EG2-208-2SW-R817 F1.30 EG2-208-2SW-R817 F1.30 EG2-208-SW-2A4 F1.30 F1.30 EG2-215-2SW-R98 EG2-215-2SW-R98 F1.30 F1.30 EG2-219-2SW-R121 F1.30 EG2-219-2SW-R121 F1.30 EG2-220-2SW-H517 F1.30 F1.30 F1.30 EG2-221-SW-2A09 F1.30 EG2-243-2CCW-H47 F1.30 F1.30 EG2-247-2CCW-R203 F1.30 EG2-247-2CCW-R203 F1.30 EG2-249-2CCW-R204 F1.30 EG2-249-2CCW-R204 F1.30 EG2-252-CCW-2A17 EG2-252-CCW-2A17 F1.30 F1.30 EG2-256-2CCW-R230 F1.30 EG2-256-2CCW-R230 F1.30 EG2-257-2CCW-H52 F1.30 EG2-257-2CCW-H52 F1.30 EG2-258-2SW-H36 F1.30 EG2-258-2SW-H36 F1.30 EG2-258-2SW-R520 F1.30 EG2-258-2SW-R520 F1.30 EG2-310-2SW-R208Y F1.30 EG2-310-2SW-R208Y F1.30 F1.30 EG2-317-2PA-R36 F1.30 EG2-387-2SW-R422 F1.30 EG2-387-2SW-R422 F1.30 EG2-448-2CCW-R144 F1.30 EG2-448-2CCW-R144 F1.30 EG2-456-2CCW-R221 F1.30 EG2-456-2CCW-R221 F1.30 EG2-457-2CCW-BR10 F1.30 EG2-457-2CCW-BR10 F1.30 EG2-472-2CCW-R111 EG2-472-2CCW-R111 F1.30 F1.30 EG2-475-2CCW-R129 F1.30 F1.30 EG2-479-2AFW-R153 F1.30 F1.30 EG2-482-2AFW-R138 F1.30 F1.30 EG2-487-2AFW-R119 F1.30 Page 17 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-Ol, Version 1.0 Proposed Alternative TABLE 5 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1ST PERIOD) EXAMINATIONS CLASS 1, 2, AND 3 COMPONENT SUPPORTS Third Interval (Third Period) Fourth Interval (First Period) Cat Component Reconciliation Item Component Item F1.30 EG2-487-2AFW-R36 F1.30 F1.30 F1.30 F1.30 EG2-497-2SW-R303 F1.30 F1.30 EG2-498-2SW-R277X EG2-548-2ASCR-Rl12 F1.30 F1.30 EG2-548-2ASCR-BR13 F1.30S F1.40 F1.40 APR1-1100-CS-5 F1.40 APR1-1100-CS-5 APR1-1100-CS-6 F1.40 APR1-1100-CS-6 F1.40 APRl-2100-SKIRT F1.40 APRl-2100-SKIRT F1.40 F1.40 APRl-3300-CS-1R F1.40 APR1-3300-CS-1 R F1.40 APRl-3300-CS-2R F1.40 APR1-3300-CS-2R APR 1-3300-CS-3R F1.40 APR1-3300-CS-3R F1.40 APRl-3300-CS-4R F-A APR1-3300-CS-4R F1.40 F1.40 APR2-1100-WS-1 F1.40 APR2-1100-WS-1 (Equipment) APR2-5120-CS-1 F1.40 F1.40 APR2-5120-CS-1 F1.40 APR2-5120-CS-2 F1.40 APR2-5120-CS-2 F1.40 APR2-5120-CS-3 F1.40 APR2-5120-CS-3 F1.40 F1.40 APR2-5120-CS-4 APR2-5120-CS-4 F1.40 D200039-1-RMW TANK F1.40 F1.40 D200089-1-P001 A-A F1.40 D200089-1-P001 A-A F1.40 D205051-SF P #1 F1.40 D205051-SF P #1 F1.40 D205063-CCW P 2A F1.40 D205063-CCW P 2A Page 18 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 6 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1 ST PERIOD) EXAMINATIONS CLASS 1 AND 2 RISK-INFORMED PIPING EXAMINATIONS Third Interval (Third Period) Fourth Interval (First Period) Cat. Item Component Component Reconciliation Item Due to Living Program requirements there are additional examinations being R-A R1.11 APR1-41 00-14DM-RI APR1-4100-14DM-RI R1.15E R1.11 APR1-4100-1DM-RI R1.15D APR1-4100-1DM-RI performed during the 4th Interval. With R1.15A APR1-4100-25RDM-RI Living Program enhancements the scope R1.15A APR1-4100-26RDM-RI continues to be subject to change. R1.11H APR1-4101-5-RI R1.11H APR1-4103-33-RI R1.11 H APR1-4104-32-RI R1.11 APR1-4200-14DM-RI R1.15E APR1-4200-14DM-RI R1.11 APR1-4200-1DM-RI R1.15D APR1-4200-1 DM-RI R1.11 APR1-4300-14DM-RI R1.15E APR1-4300-14DM-RI R1.11 APR1-4300-1 DM-RI R1.15D APR1-4300-1 DM-RI R1.11 APR1-4300-23RDM-RI R1.15A APR1-4300-23RDM-RI R1.11 APR1-4300-24RDM-RI APR1-4300-24RDM-RI R1.11 R1.15A APR1-4301-5-RI R1.11S APR1-4303-6-RI R1.11S APR1-4303-6-RI R1.11H APR1-4304-20-RI R1.11S APR1-4310-9-RI R1.11S APR1-4310-9-RI R1.11C APR1-4500-1-RI R1.11C APR1-4500-1-RI R1.15TB APR1-5100-CCW-TB-IN-RI R1.15TB APR1-5100-CCW-TB-OUT-RI R1.15TB APR1-5200-CCW-TB-IN-RI R1.15TB APR1-5200-CCW-TB-OUT-RI R1.15TB APR1-5300-CCW-TB-IN-RI R1.15TB APR1-5300-CCW-TB-OUT-RI Page 19 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 6 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1 ST PERIOD) EXAMINATIONS CLASS 1 AND 2 RISK-INFORMED PIPING EXAMINATIONS Third Interval (Third Period) Fourth Interval (First Period) Cat. Item Item Component Reconciliation Component R1.11 R1.11 APR2-4202-1 BC-RI APR2-4202-1 BC-RI R1.11 R1.11 APR2-4300-1 R-RI R1.11 APR2-4300-1 R-RI R1.11 APR2-4301-1-RI R1.11 APR2-4301-1-RI APR2-4301-2-RI R1.11 APR2-4301-2-RI R1.11 APR2-4301-23B-RI APR2-4301-23BC-RI R1.11 R1.11 APR2-4301-24-RI R1.11 APR2-4301-24-RI R1.11 APR2-4301-25-RI R1.11 APR2-4301-25-RI R1.11 APR2-4301-26-RI R1.11 APR2-4301-26-RI R1.11 APR2-4301-27-RI R1.11 APR2-4301-27-RI R1.11 APR2-4301-28-RI R1.11 APR2-4301-28-RI R1.11 APR2-4301-29-RI R1.11 APR2-4301-29-RI R1.11 APR2-4301-3-RI R1.11 APR2-4301-3-RI R1.11 APR2-4301-30-RI R1.11 APR2-4301-30-RI R1.11 R1.11 APR2-4301-31-RI APR2-4301-31-RI R1.11 APR2-4301-32-RI R1.11 APR2-4301-32-R1 R1.11 APR2-4302-1 BC-RI R1.11 APR2-4302-1 BC-RI R1.11 APR2-4303-2-RI R1.11 APR2-4303-2-RI R1.11 APR2-4303-3-RI APR2-4303-3-RI R1.11 R1.11 APR2-4303-4-RI R1.11 APR2-4303-4-RI R1.11 APR2-4350-2-RI R1.11 APR2-4350-2-RI R1.11 R1.11 APR2-4350-28-RI APR2-4350-28-RI R1.11 APR2-4501-1-RI R1.11 APR2-4501-1-RI R1.11H APR2-4504-1-RI R1.11 APR2-4506-1-RI R1.11 APR2-4506-1-RI R1.11 APR2-4506A-16-RI R1.11 APR2-4506A-16-RI Page 20 of 21
Enclosure SNC Response to Request for Additional Information FNP-ISI-ALT-01, Version 1.0 Proposed Alternative TABLE 6 THIRD INTERVAL (3RD PERIOD) EXAMINATIONS COMPARED TO THE FOURTH INTERVAL (1 ST PERIOD) EXAMINATIONS CLASS 1 AND 2 RISK-INFORMED PIPING EXAMINATIONS Third Interval (Third Period) Fourth Interval (First Period) Cat. Item Item Component Reconciliation Component R1.11 APR2-4507-18-RI R1.11 APR2-4507-18-RI R1.11 R1.11 APR2-4507-26-RI R1.11 APR2-4507-26-RI APR2-4507-32-RI R1.11 APR2-4507-32-RI R1.11 APR2-4507-36-RI R1.11 APR2-4507-36-RI R1.11 APR2-4507-38-RI R1.11 APR2-4507-38-RI R1.11H APR2-4508-1-RI APR2-4508-1-RI R1.11 R1.11H APR2-4540-19-RI R1.11 APR2-4540-19 R1.11 APR2-4540-22-RI R1.11 APR2-4540-27-RI APR2-4540-27-RI R1.11 Page 21 of 21}}