Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 fiBuchanan, N.Y. 10511-0249 lULL- Tel (914) 734-6700 Joseph E. Pollock Site Vice President Administration May 15, 2008 Indian Point Units 1, 2 and 3 Re: Dockets50-003, 50-247 and 50-286 NL-08-079 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001

Subject:

Remediation and Long Term Monitoring of Site Groundwater

Reference:

Entergy letter dated January 11, 2008, J. E. Pollock to Document Control Desk, "Results of Ground Water Contamination Investigation" (NL-08-152)

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (Entergy) provided the results of the comprehensive groundwater investigation conducted at the Indian Point Energy Center (IPEC) during the period October 2005 through October 2007, per the referenced letter. In that letter and the attached investigation report, the scope of the investigation, which included all three reactor units and all areas of the site where credible potential sources of leakage could exist, was described.

The investigation identified the sources of leakage responsible for the radioactive contaminants that have been found in groundwater at the IPEC site. The effected ground water regime has been characterized and modeled, the sources of the leakage identified and the radiological impacts resulting from this leakage determined. Entergy has begun implementation of a long term ground water monitoring program and initiated a remediation program to address the site groundwater conditions described in the report.

During the course of the groundwater investigation, radiological dose impact assessments have been performed and continue to be reported in the Annual Radiological Effluent Release Report to the NRC and changes and enhancements to our Radiological Environmental Monitoring Program (REMP) have been implemented. The only noteworthy pathway resulting from groundwater migration to the river is through consumption of fish and invertebrates from the Hudson River, the calculated doses of which are well below 1/100 of the federal limits.

01o

Indian Point Units 1, 2 and 3 Docket Nos.50-003, 50-247 and 50-286 NL-08-079 Page 2 of 3 Notwithstanding the low dose, Entergy has made the determination to apply a remedial strategy that incorporates source term control and elimination, along with monitored natural attenuation, to address the identified groundwater contamination at the site.

Additionally Entergy is committing to the long term monitoring of site groundwater with the objectives of assuring proper assessment and reporting of dose impact, the identification of potential new leaks to ground water, and the ongoing assessment of the long term monitored attenuation strategy. Attachment 1 lists the commitments associated with this letter.

Implementation plans associated with these objectives include:

1. Continued source term control in the Unit 1 fuel pools via the installed demineralization system, removal of the remaining Unit 1 fuel and draining of the Unit 1 pools by year end 2008.
2. A long term site ground water monitoring program institutionalized via the IPEC Offsite Dose Calculation Manual and associated implementing procedures.

If you should have any questions, please contact Mr. Robert Walpole, Manager, Licensing, Indian Point Energy Center, at 914-734-6710.

Sincerely yours, J. E. Pollock Site Vice President Indian Point Energy Center cc: See Page 3 : List of Commitments

Indian Point Units 1, 2 and 3 Docket Nos.50-003, 50-247 and 50-286 NL-08-079 Page 3 of 3 cc: NRC Resident Inspector's Office Mr. John Boska, Senior Project Manager, NRC NRR DORL Mr. Ted Smith, Project Manager, NRC FSME DWMEP Mr. Samuel Collins, Regional Administrator, NRC Region 1 Mr. Paul D. Tonko, President, NYSERDA Mr. Paul Eddy, New York State Dept. of Public Service Mr. John White, Branch Chief, NRC Region 1 Mr. Tim Rice, New York State DEC

ATTACHMENT TO NL-08-079 List of Commitments ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT UNITS 1, 2 and 3 DOCKET NOS.50-003, 50-247 and 50-286

NL-08-079 Docket Nos.50-003, 50-247 and 50-286 Attachment 1 Page 1 of 1 List of Commitments Number Commitment Due Date, NL-08-079-1 Entergy will remove the fuel from the Unit 1 pool to 12/31/08 the existing ISFSI and drain the associated fuel pools to a level low enough to allow final cleaning and sludge removal as necessary.

NL-08-079-2 Process remaining Unit 1 pool bottoms/water for 4/30/09 cleanup.

NL-08-079-3 Report to USNRC Region 1 schedule deviations Ongoing until which jeopardize the overall Unit 1 fuel removal and Unit 1 fuel draining schedule. removal to the existing ISFSI and draining of associated Unit 1 fuel pools NL-08-079-4 Entergy will incorporate the institutional controls and 7/30/08 objectives associated with the long term groundwater monitoring program into the IPEC Offsite Dose Calculation Manual and associated implementing procedures.