NL-05-1493, Third and Fourth 10-Year Interval Inservice Inspection Programs Submittal of Revised Exemption Request

From kanterella
Jump to navigation Jump to search
Third and Fourth 10-Year Interval Inservice Inspection Programs Submittal of Revised Exemption Request
ML052370435
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/24/2005
From: Sumner H
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-05-1493
Download: ML052370435 (5)


Text

H. L Sumner, Jr.

Vice President Hatch Project August 24, 2005 Docket Nos.:

50-321 50-366 Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERN A COMPANY Energy to Serve Your World '"

U. S. Nuclear Regulatory Commission A m : Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Third and Fourth 10-Year Interval Inservice Inspection Programs Submittal of Revised Exemption Request Ladies and Gentlemen:

By letter dated August 2,2005, Southern Nuclear Operating Company (SNC) submitted a revision to Enclosure 9 of the letter dated March 30, 2005 (Exemption Request ISI-EX-01, Version 2). In response to a telephone conversation with the NRC staff on August 16,2005, this enclosure has been revised to indicate the special circumstance of 10 CFR 50.12(a)(2) to which the exemption request applies.

In accordance with 10 CFR 50.12(aX 1) and pursuant to the special circumstance described in1 0 CFR 50.12(a)(2)(ii), SNC requests an exemption from 10 CFR 50.55a(bX2Xix)(G) requirements for VT-3 examination of the containment vent system.

As described in the Enclosure, application of the regulation in this particular circumstance is not necessary to achieve the underlying purpose of the rule. SNC proposes to continue to use the method established by Third 10-Year Interval Relief Request RR-MC-9 to implement the visual requirements.

This letter contains no NRC commitments. If you have any questions, please advise.

H. L. Sumner, Jr. (Replacement): ISI-EX-0 1, Version 3.0

U. S. Nuclear Regulatory Commission NL-05-1493 Page 2 cc:

Southern Nuclear Omrating Com~anv Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch

Plant Site-Unit:

Interval-Interval Dates:

Requested Date for Approval:

ASME Code Components Affected:

Applicable Code Edition and Addenda:

Applicable Requirements:

Reason for Request:

SOUTHERNNUCLEAROPERATINGCOMPANY ISI-EX-01, Version 3.0 10 CFR 50.55a EXEMPTION REQUEST Edwin I. Hatch Nuclear Plant-Units 1 and 2 4" IS1 Interval extending from January 1,2006 through December 3 1,2015.

Approval is requested by November 1,2005 to support examinations performed during 1R22 (scheduled for February 2006)

Accessible surface areas of the Containment Vessel pressure retaining boundary Vent System, requiring visual examination per ASME Section XI, Table IWE-2500-1, Category E-A, Item Number E1.20.

ASME Section XI, 2001 Edition through the 2003 Addenda 10 CFR 50.55a(b)(2)(ix)(G) requires a VT-3 examination of components in W E Table 2500-1, Category E-A, Item E1.20 in lieu of the ASME Section XI required General Visual Examination (CFR dated October 4, 2004).

During the 3rd inservice inspection interval, the 1992 Code with 1992 Addenda required a VT-3 examination of the accessible surface areas of the vent system.

SNC requested approval in Relief Request RR-MC-9 to use a General Visual examination in lieu of the VT-3 examination. This request was approved by the NRC. For the 4" interval, the 2001 Edition through the 2003 Addenda does not require the VT-3 examination; however in 10 CFR 50e55a(b)(2)(ix)(G), the NRC added a requirement to perform the VT-3 examinations.

SNC believes that the examination provisions established in previous Relief Request RR-MC-9 have proven to be sufficient to maintain the structural integrity and leak-tightness of the containment surfaces; therefore, SNC is requesting to continue the use of similar provisions during the 4" interval.

See References for dates and TAC numbers associated with RR-MC-9.

SOUTHERN NUCLEAR OPERATING COMPANY ISI-EX-01, Version 3.0 10 CFR 50.55a EXEMPTION REQUEST Proposed In lieu of conducting the 10CFR50.55a(b)(2)(ix)(G) required visual Alternative and examination (VT-3), SNC proposes to perform a general visual type Basis for Use:

examination on all non-submerged, accessible pressure boundary surfaces of the vent system. This general visual type examination will be performed in accordance with the Plant Hatch "Qualified (N) Coatings" program. The details of this program were provided in the October 19,1998 response to NRC Generic Letter 98-04, "Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment." The procedures and personnel qualifications applicable for the coatings program implementation are in compliance with Regulatory Guide 1.54, 1973, and the implementation is based on the following documents: (1) ANSI N 101.2-1972, "Protective Coatings (Plants) for Light Water Nuclear Reactor Containment Facilities;"

(2) ANSI N101.4-1972, "Quality Assurance for Protective Coatings Applied to Nuclear Facilities;" and (3) EPRI Report TR-109937, "Guideline on Nuclear Safety-Related Coatings." This program was approved by the NRC in a letter dated November 19, 1999.

The "Qualified (N) Coatings" program examination frequency is equivalent to that of the ASME XI Code and the program requires that when evidence of degradation is detected, a detailed examination and evaluation be performed.

The detailed visual examination would be performed in accordance with the provisions of ASME XI paragraph IWE-23 10(c).

The exterior surfaces of the Vent System that connects the BWR Drywell to the Suppression Pool are located in the Reactor Building. The Reactor Building environment does not pose adverse conditions that would promote rapid degradation of the outside pressure boundary surfaces of the Vent System. The interior surfaces of the Vent System that connects the Drywell to the suppression pool and the portions of the vent system located inside the Suppression Pool are maintained in a nitrogen inerted environment during normal power operation in accordance with Technical Specification requirements. History and previous examinations have indicated that this environment does not promote rapid degradation of the surfaces.

The requirements specified for a VT-3 were developed for detecting flaws in metal components and are more stringent than those required for detection of degradation such as corrosion. Since corrosion of base metal is the primary issue of concern for containment pressure boundary surface areas, a general visual type examination, in accordance with the site "Qualified (N) Coatings" program, is sufficient to inspect the subject surface areas of the containment and will provide an acceptable level of quality and safety. Therefore, SNC hereby requests an exemption from the requirements of 10CFR50.55a (b)(2)(ix)(G) pursuant to 10 CFR 50.12(a)(l) and 10 CFR 50.12(a)(2)(ii) since granting the exemption will not present an undue risk to the public SOUTHERN NUCLEAR OPERATING COMPANY ISI-EX-01, Version 3.0 10 CFR 50.55a EXEMPTION REQUEST health and safety, and the application of the regulation in this particular circumstance is not necessary to achieve the underlying purpose of the rule.

Duration of The proposed exemption is applicable for the 4" Inservice Inspection Proposed Interval.

Alternative:

Precedents:

A similar request was approved for the 3'* Inservice Inspection Interval as RR-MC-9.

References:

SNC letter HL-5957, dated July 19,2000 submitting RR-MC-9.

Approval for RR-MC-9 was granted for the 3rd Interval by NRC letter dated October 04,2000 - TAC numbers MA9569 and MA9570.

Status:

Awaiting NRC approval.