Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23024A0462023-01-17017 January 2023 License Amendment Request for the Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan ML22332A0482022-11-22022 November 2022 New York State Alyse Peterson Comments on Completion of Emergency Planning Nd License Amendment Request Prior to Spent Fuel Transfer from Spent Fuel Pools to Casts (Dockets 50-003, 50-247, 50-286) ML22321A1482022-11-17017 November 2022 License Amendment Request to Approve the Independent Spent Fuel Storage Installation-Only Emergency Plan ML22306A1262022-11-0202 November 2022 License Amendment Request to Revise Indian Point Nuclear Generating Unit Nos. 2 and 3 Renewed Facility Licenses and Permanently Defueled Technical Specifications and IP3 Appendix C Technical Specifications to Reflect Permanent Removal of Sp ML22214A1282022-08-0202 August 2022 License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify Staffing Requirements Following Transfer of Spent Fuel to Dry Storage ML22140A1262022-05-20020 May 2022 License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements ML22035A1212022-02-0404 February 2022 Revision to Holtec Decommissioning International, LLC, License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition ML21356B7042021-12-22022 December 2021 License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications ML20078L1402020-04-15015 April 2020 Issuance of Amendment Nos. 62, 293, and 268 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML20017A2902020-01-17017 January 2020 Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-053, Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2019-06-0606 June 2019 Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NL-19-013, Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition2019-04-15015 April 2019 Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition NL-19-026, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-04-15015 April 2019 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-001, License Amendment Request to Revise the Indian Point Energy Center Site Emergency Plan to Address the Permanently Shut Down and Defueled Condition2019-04-15015 April 2019 License Amendment Request to Revise the Indian Point Energy Center Site Emergency Plan to Address the Permanently Shut Down and Defueled Condition CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 NL-18-034, License Amendment Request- Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2018-06-20020 June 2018 License Amendment Request- Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) NL-17-070, Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program2017-05-31031 May 2017 Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program NL-17-049, Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule2017-04-28028 April 2017 Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule NL-17-035, Proposed License Amendment Regarding Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank2017-04-0707 April 2017 Proposed License Amendment Regarding Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank NL-17-018, Consistency Certification for Entergy Nuclear Indian Point 2 and Entergy Nuclear Indian Point 3 License Renewal Application2017-01-31031 January 2017 Consistency Certification for Entergy Nuclear Indian Point 2 and Entergy Nuclear Indian Point 3 License Renewal Application NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application NL-16-118, Indian Point Nuclear Power Plant, Units 2 & 3, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel2016-12-14014 December 2016 Indian Point Nuclear Power Plant, Units 2 & 3, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel ML16355A0682016-12-14014 December 2016 Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel NL-16-118, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel2016-12-14014 December 2016 Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel CNRO-2016-00020, Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning .2016-08-16016 August 2016 Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning . NL-15-148, Amendment 17 to License Renewal Application (LRA)2015-12-14014 December 2015 Amendment 17 to License Renewal Application (LRA) NL-15-144, License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-109, Reply to Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-022015-09-0101 September 2015 Reply to Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-02 NL-15-067, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-16016 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 NL-14-146, Amendment 16 to License Renewal Application (LRA)2014-12-15015 December 2014 Amendment 16 to License Renewal Application (LRA) NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years ML14304A7002014-04-30030 April 2014 Annual Energy Outlook 2014 NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-14-035, Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves2014-04-0101 April 2014 Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves NL-14-016, License Amendment Request - Cyber Security Plan Implementation Schedule2014-01-30030 January 2014 License Amendment Request - Cyber Security Plan Implementation Schedule NL-13-131, Amendment 14 to License Renewal Application (LRA)2013-09-26026 September 2013 Amendment 14 to License Renewal Application (LRA) NL-13-077, License Renewal Application-Update to Electrical Meb and Structures Monitoring Program Scope, Aging Management Programs2013-05-0606 May 2013 License Renewal Application-Update to Electrical Meb and Structures Monitoring Program Scope, Aging Management Programs NL-13-015, Proposed License Amendment Regarding Connection of Non Seismic Boric Acid Recovery System to the Refueling Water Storage Tank2013-04-15015 April 2013 Proposed License Amendment Regarding Connection of Non Seismic Boric Acid Recovery System to the Refueling Water Storage Tank ML13116A0082013-04-0909 April 2013 Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to Seismic Event NL-13-046, Amendment 13 to License Renewal Application (LRA) Pertaining to One-Time Inspection and Selective Leaching Programs2013-03-18018 March 2013 Amendment 13 to License Renewal Application (LRA) Pertaining to One-Time Inspection and Selective Leaching Programs ML13046A1662013-02-22022 February 2013 Issuance of Amendment Connecting Non-Seismic Purification System Piping to the Refueling Water Storage Tank NL-12-190, Amendment 12 to License Renewal Application (LRA)2012-12-27027 December 2012 Amendment 12 to License Renewal Application (LRA) NL-12-090, Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank2012-08-14014 August 2012 Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank NL-12-107, Application to Renew Operating Licenses for Indian Point Nuclear Power Reactors Unit 2 and Unit 3, General Correspondence - NL-12-1072012-08-0808 August 2012 Application to Renew Operating Licenses for Indian Point Nuclear Power Reactors Unit 2 and Unit 3, General Correspondence - NL-12-107 2023-01-17
[Table view] Category:Technical Specification
MONTHYEARML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-17-137, License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years NL-17-137, Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML16280A2292016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-16-109, Indian Point 2 Improved Technical Specifications Bases2016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-15-094, Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements2015-08-11011 August 2015 Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections ML14287A3002014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections NL-14-122, Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance2014-09-15015 September 2014 Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance ML14268A3532014-09-15015 September 2014 Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-133, Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2010-12-16016 December 2010 Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources ML1015506572010-06-28028 June 2010 Issuance of Amendment Refueling Water Storage Tank Level Instrumentation ML0934307192009-10-13013 October 2009 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Technical Specification Bases, November 2009, Appendix a, B.2.0 Through B.3.9.6 NL-09-062, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2009-07-23023 July 2009 Proposed Technical Specification Change Regarding RWST Surveillance Requirement ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions NL-09-004, License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed2009-03-25025 March 2009 License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed NL-08-158, Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-10-28028 October 2008 Additional Information Regarding Amendment Application on Control Room Envelope Habitability NL-08-163, (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 212008-10-20020 October 2008 (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 21 NL-08-101, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-07-0909 July 2008 Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0820701552008-06-26026 June 2008 Distribution of IP3 Technical Specification Amendment 236 ML0729102922007-10-0101 October 2007 Technical Specification Bases Change ML0724801632007-07-0606 July 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases ML0715003222007-03-29029 March 2007 IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07 ML0711402032007-03-29029 March 2007 Technical Specification Bases ML0707205372007-02-26026 February 2007 Improved Technical Specifications, Amendment 233 ML0702903522007-01-19019 January 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases NL-06-099, Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-4852006-09-25025 September 2006 Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485 ML0620003692006-04-19019 April 2006 Update to IP3 Technical Specifications Bases ML0631905242006-04-19019 April 2006 Technical Specification Bases Manual, IP-SMM-AD-103 ML0604505332006-02-13013 February 2006 Tech Spec Pages for Amendments 245 and 229 Inoperability of Snubbers ML0532004452005-10-28028 October 2005 Technical Specification Bases Changes NL-05-105, Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements2005-10-0303 October 2005 Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements NL-05-107, Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology2005-09-26026 September 2005 Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology ML0523702312005-08-0808 August 2005 Technical Specification Bases NL-05-065, Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)2005-06-0808 June 2005 Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 22005-05-25025 May 2005 Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 ML0510800342005-04-14014 April 2005 Tech Spec Pages for Amendment 242 Reporting Requirements for Annual Radiological Environmental Operating Report ML0510903802005-03-31031 March 2005 Technical Specification Bases ML0509600592005-03-25025 March 2005 Distribution of IP3 Technical Specification Amendment 224 and 225 ML0508703842005-03-24024 March 2005 Technical Specification Pages Re 4.85 Percent Stretch Power Uprate & Relocation of Cycle-Specific Parameters ML0507500422005-02-0303 February 2005 Technical Specification Bases ML0506705222005-02-0303 February 2005 Technical Specification Bases 2022-02-28
[Table view] Category:Amendment
MONTHYEARML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-17-137, Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years NL-17-137, License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML1015506572010-06-28028 June 2010 Issuance of Amendment Refueling Water Storage Tank Level Instrumentation ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions NL-09-004, License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed2009-03-25025 March 2009 License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed NL-08-101, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-07-0909 July 2008 Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0707205372007-02-26026 February 2007 Improved Technical Specifications, Amendment 233 NL-06-099, Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-4852006-09-25025 September 2006 Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485 ML0604505332006-02-13013 February 2006 Tech Spec Pages for Amendments 245 and 229 Inoperability of Snubbers NL-05-105, Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements2005-10-0303 October 2005 Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements NL-05-107, Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology2005-09-26026 September 2005 Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology NL-05-065, Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)2005-06-0808 June 2005 Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 22005-05-25025 May 2005 Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 ML0510800342005-04-14014 April 2005 Tech Spec Pages for Amendment 242 Reporting Requirements for Annual Radiological Environmental Operating Report ML0509600592005-03-25025 March 2005 Distribution of IP3 Technical Specification Amendment 224 and 225 ML0508703842005-03-24024 March 2005 Technical Specification Pages Re 4.85 Percent Stretch Power Uprate & Relocation of Cycle-Specific Parameters NL-04-025, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2004-03-0909 March 2004 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process NL-04-022, Proposed Change to Technical Specifications Regarding Reactor Coolant Pump Flywheel Inspection Interval (TSTF-421)2004-03-0303 March 2004 Proposed Change to Technical Specifications Regarding Reactor Coolant Pump Flywheel Inspection Interval (TSTF-421) ML0330904272003-10-30030 October 2003 Tech Spec Page for Amendment No. 219, Revising TS 5.5.10 to Adopt the Requirements of the American Society for Testing and Materials Standard D3803-1989 ML0325213882003-08-28028 August 2003 Transmittal of IP3 Technical Specification Amendment 218 ML0311403682003-03-26026 March 2003 Transmittal of Technical Specification Amendment 216 ML0221202052002-07-30030 July 2002 Technical Specifications, Amendment Reactor Vessel Material Surveillance Program (Tac No. MB3917) NL-02-082, License Amendment Request (LAR No. 02-010) - Regarding Indian Point Energy Center, Unit No. 2 Technical Specifications Requirements for Control Rod Misalignment & Rod Position Indication2002-07-0909 July 2002 License Amendment Request (LAR No. 02-010) - Regarding Indian Point Energy Center, Unit No. 2 Technical Specifications Requirements for Control Rod Misalignment & Rod Position Indication ML0215505332002-05-29029 May 2002 List of Figures for Amendment No. 227, Indian Point, Unit 2 ML0211905422002-04-25025 April 2002 No. 2 - Technical Specifications - Changes to Technical Specifications Bases ML0210103892002-04-11011 April 2002 Correction of Technical Specification Page Issued by Amendment No. 225 (Tac No. MB2990) ML0209400142002-04-0202 April 2002 Technical Specification, Amendment Technical Specification Changes to Secondary Leakage Limits and Steam Generator Tube Inservice Surveillance Requirements (Tac No. MB0770) ML0209101122002-03-27027 March 2002 Technical Specification Pages for Amendment No. 225 ML0205004982002-02-15015 February 2002 TS, Amendment Updated Pressure-Temperature Limit Curves (Tac No. MB2419) ML0204403322002-02-12012 February 2002 Technical Specification Amendment No. 223, Re Removal of Containment Isolation Valve Lists from Technical Specifications ML0037781142000-12-12012 December 2000 Transfer of Facility Operating Licenses and Proposed License Amendments. Consolidated Edison Co. of New York, Inc, Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit Nos. 1 and 2 2022-02-28
[Table view] |
Text
Entergy Nuclear Northeast Indian Point Energy Center
% Entergy 450 Broadway, GSB PO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration May 25, 2005 Re: Indian Point Unit No. 2 Docket No. 50-247 NL-05-062 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements
Dear Sir:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby requests an amendment to the Operating License for Indian Point Nuclear Generating Unit No. 2 (IP2). The proposed change to Technical Specification 3.4.9 will revise the existing pressurizer water level limit for plant operating Mode 3 (Hot Standby).
Technical Specification 3.4.9 currently requires the pressurizer to be operable with an indicated water level of less than or equal to 65.1% in Modes 1, 2, and 3. The proposed amendment will retain this limit for Modes 1 and 2, but will establish a limit for actual water level of less than or equal to 90% for Mode 3. This proposed change will provide additional operational flexibility and efficiency for performing a plant cooldown.
Entergy has evaluated the proposed change in accordance with 10 CFR 50.91 (a)(1) using the criteria of 10 CFR 50.92 (c) and Entergy has determined that this proposed change involves no significant hazards considerations, as described in Attachment 1. The proposed changes to the Technical Specification and Bases are shown in Attachment 2.
A copy of this application and the associated attachments are being submitted to the designated New York State official.
Entergy requests approval of the proposed amendment by February 17, 2006, with a 30-day implementation period, to support the next refueling outage for IP2. Commitments being made T0ok
NL-05-062 Docket No. 50-247 Page 2 of 2 by Entergy for implementing the requested amendment are stated in Attachment 3. If you have any questions or require additional information, please contact Mr. Kevin Kingsley at 914-734-6695.
I declare under penalty of perjury that the foregoing is true and correct. Executed on ____
Sincerely, Site Vice President Indian Point Energy Center Attachments:
- 1. Analysis of Proposed Technical Specification Changes
- 2. Proposed Technical Specification and Bases Changes (markup)
- 3. Commitments cc: Mr. Patrick D. Milano, Senior Project Manager Project Directorate I, Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2 Washington, DC 20555 Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector's Office Indian Point Unit 2 U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Peter R. Smith President, NYSERDA 17 Columbia Circle Albany, NY 12203 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223
ATTACHMENT 1 TO NL-05-062 ANALYSIS OF PROPOSED TECHNICAL SPECIFICATION CHANGE REGARDING PRESSURIZER WATER LEVEL REQUIREMENT ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247
NL-05-062 Docket No. 50-286 Attachment 1 Page 1 of 7
1.0 DESCRIPTION
This is a request for an amendment to Operating License DPR-64, Docket No. 50-247 for Indian Point Nuclear Generating Unit No. 2.
The proposed change to Section 3.4.9 of the Indian Point 2 Technical Specifications will establish a new limit for pressurizer water level (L 90%) in MODE 3. The existing level requirement (L 65.1%) for MODES 1 and 2 is not being changed.
The reason for the proposed amendment is to allow greater operational flexibility and efficiency when performing a plant cooldown. The new higher limit in Mode 3 will provide the following benefits:
- reduce additional RCS makeup required for establishing the 'pressurizer-solid' condition in Mode 4.
2.0 PROPOSED CHANGE
S 2.1 Indian Point 2 Technical Specification LCO 3.4.9 currently states:
'The pressurizer shall be OPERABLE with:
- a. Pressurizer water level < 65.1%; and .........
The applicability for this LCO is MODES 1, 2, and 3.
The proposed amendment will revise LCO 3.4.9 to state:
'The pressurizer shall be OPERABLE with:
- a. Pressurizer water level < 65.1% in MODES 1 and 2, or < 90% in MODE 3; and ........
The applicability statement for this LCO is not being changed.
2.2 Indian Point 2 Technical Specification surveillance SR 3.4.9.1 currently states:
'Verify pressurizer water level is < 65.1%."
The proposed amendment will revise SR 3.4.9.1 to state:
'Verify pressurizer water level is < 65.1% in MODES 1 and 2, OR < 90% in MODE 3."
NL-05-062 Docket No. 50-286 Attachment 1 Page 2 of 7 The frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for this surveillance is not being changed.
Proposed changes to the Bases Section 3.4.9 pertaining to the proposed new pressurizer water level limit in Mode 3 are also provided in Attachment 2, for information.
3.0 BACKGROUND
The pressurizer is a component in the reactor coolant system (RCS) that is used to maintain required RCS pressure during steady state operations. The pressurizer also limits pressure changes caused by reactor coolant thermal expansion and contraction during load transients.
The pressurizer provides a point in the RCS where liquid and vapor are maintained in equilibrium under saturated conditions for pressure control purposes. The proposed change will not alter these design features of the pressurizer.
The water level in the pressurizer, and the corresponding steam space volume, is maintained by a control system that varies level as a function of reactor coolant average temperature, Tavg.
The control system is programmed to maintain pressurizer water level at approximately 37%
with the RCS at the zero power Tavg (5470F). The programmed level increases with temperature and reaches approximately 53% at the current full power Tavg (5620F). This temperature-dependent level program is designed to maintain a constant mass of reactor coolant over the programmed temperature range for power operation. The water level maintained by this program is sufficient so that the pressurizer will not empty on a reactor trip from 100% power. The steam space associated with this water level is sufficient to prevent water relief through the pressurizer safety valves following a loss-of-load event or a loss-of-normal feedwater event at 100% power. Although the safety function of the pressurizer safety valves (overpressure protection of the RCS pressure boundary) can still be met if water relief occurs, it is preferable to limit operation to steam relief. Water discharge results in higher hydraulic loading on the discharge piping and other components downstream of the safety valves. The proposed change will not alter these design features of the pressurizer level control system.
The current Tech Spec limit is based on the initial condition pressurizer level (71 %) used for the limiting design basis accidents that result in a water insurge to the pressurizer. The 71% value is based on the nominal programmed pressurizer level that would result from the plant operating at the highest Tayg (572 0F) covered by the current safety analyses. The 71% value also includes 5.9% level for instrument uncertainty, so that the 65.1% value in Tech Specs is a limit on indicated level.
The design of the pressurizer and the pressurizer level control system are based primarily on thermal-hydraulic conditions that occur when the reactor is operating. The maximum water level limit is specified to maintain sufficient space for a steam bubble during normal operation and therefore accommodate pressurizer insurge during heatup transients. The safety analyses for loss-of-load and loss-of-normal feedwater represent the limiting analyses for insurge to the pressurizer. The proposed change will not affect the existing accident analyses and resulting requirements in Modes 1 and 2, which are for Power Operation and Plant Startup, respectively.
The proposed change only applies to Mode 3 (Hot Standby), when the reactor is shutdown. In this Mode, a higher initial pressurizer level is acceptable because the magnitude of a
NL-05-062 Docket No. 50-286 Attachment 1 Page 3 of 7 pressurizer insurge due to thermal expansion of the reactor coolant for an event in Mode 3 is much smaller than that which would occur in Mode 1 with the plant at full power.
Potential sources of insurge into the pressurizer during Mode 3 result from a Chemical and Volume Control System (CVCS) malfunction that maximizes charging flow or an inadvertent safety injection. At an actual pressurizer level of 90%, there is approximately 2300 gallons of empty volume in the pressurizer. In the event that a charging pump is operating without letdown, the operator would have more than 20 minutes to respond to that condition. In the unlikely event that all three charging pumps are operating without letdown, the operator would have nearly 8 minutes to respond to the condition. The purpose of the license amendment is to support a specific and limited plant evolution (e.g., plant cooldown from Mode 3 to Mode 4).
Entergy will establish administrative controls which will require that an operator be assigned during that evolution for operating and controlling the CVCS, including monitoring pressurizer water level, whenever the indicated pressurizer level, in Mode 3, is above the 65.1% limit established for Modes 1 and 2.
The effect of an inadvertent safety injection on pressurizer water level is limited, because IP2 is a low head injection plant. The nominal shutoff head of the safety injection pumps is 1500 psig.
Therefore, in the event of a safety injection actuation in Mode 3 with pressure above the pump shutoff head, no mass injection would occur and pressurizer level would not be affected. In the event of a safety injection with pressure below the shutoff head, the resulting mass injection would compress the pressurizer steam space and system pressure would increase to the pump shutoff head, at which point additional mass injection and increase in pressurizer level would terminate. The pressure-temperature limits for operating the plant are established, in part, by operating curves which ensure that the reactor pressure boundary fracture toughness requirements of 10 CFR 50 Appendix G are satisfied. The Low Temperature Overpressure Protection Technical Specification requirements for IP2 are not applicable in Mode 3.
4.0 TECHNICAL ANALYSIS
When performing a plant cooldown, reactor coolant contracts, resulting in a reduction in pressurizer water level. In order to maintain level in the pressurizer, a net positive addition to the RCS is established by adjusting the charging and letdown flowrates of the Chemical and Volume Control System (CVCS). However, the net positive addition of water may not be sufficient to fully compensate for contraction when performing a cooldown at or near the maximum allowable rate based on metal thermal stress considerations. Operation of the CVCS in this plant condition is also used to establish the higher reactor coolant boron concentrations required to maintain shutdown margin as reactor coolant temperature is reduced. The proposed change to allow a higher pressurizer water level in Mode 3 will provide operators greater flexibility in preparing for and performing a plant cooldown at or near the maximum allowable rate. The higher level will help compensate for reactor coolant contraction and will be less of an operational restriction to the addition of borated water, as needed, to meet shutdown margin requirements. In addition, upon reaching Mode 4 (RCS temperature less than 350 OF) and placing the residual heat removal system in service, pressurizer level is raised to a 'water-solid' condition. The increase in level is typically performed using the pressurizer spray line to protect the pressurizer surge line from cooling too rapidly. The lower the initial pressurizer level is, the longer this evolution will take. Entergy estimates that a time savings of approximately 1 - 2
NL-05-062 Docket No. 50-286 Attachment 1 Page 4 of 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> for plant cooldown from Mode 3 to Mode 4 is achievable if a higher pressurizer level is allowed in Mode 3. During Modes changes for return to power operation, (e.g., Mode 3 to 2),
there is no benefit to maintaining a higher pressurizer level so that the pressurizer level in Mode 3 for that evolution would normally be maintained at the existing Mode 1 /2 limit.
The proposed change will allow plant operators to adjust actual pressurizer level in Mode 3 to
< 90% in anticipation of performing a plant cooldown. The proposed Tech Spec limit for Mode 3 is based on actual level, since there is not a direct indication that would be used for a Tech Spec limit that specifies 'indicated level'. The reading from the instrument channel indicators must be adjusted by plant operators using density compensation curves when the pressurizer is not at the temperature used for the instrument channel calibration. The limit on pressurizer water level established in plant procedures will account for applicable instrument uncertainty in addition to specifying the use of density compensation curves.
In Mode 3, the rate of volumetric expansion of reactor coolant in the event of a loss of decay heat removal would be much less significant than that resulting from a loss-of-load or loss-of-normal feedwater, with the plant at full power. The water level limit in Modes 1 and 2, which accommodates water insurge for these limiting events, is not being changed. The proposed change only applies to Mode 3 and there will still be a steam bubble maintained in the pressurizer with the proposed new level limit of 90%. In addition, administrative controls, implemented in plant procedures, will require that an operator be assigned for operating and controlling the CVCS, including monitoring pressurizer water level, whenever the pressurizer level, in Mode 3, is above 65.1%.
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration Entergy Nuclear Operations, Inc. (Entergy) has evaluated the safety significance of the proposed change regarding the Mode 3 pressurizer water level limit according to the criteria of 10 CFR 50.92, "Issuance of Amendment". Entergy has determined that the subject changes do not involve a Significant Hazards Consideration as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No Pressurizer water level is an assumed initial condition for certain accident analyses.
Plant initial conditions are not accident initiators and do not have an effect on the probability of the accident occurring. The proposed change only revises the specified limit on water level in the pressurizer, so this change does not affect accident probability.
Pressurizer water level is an assumed initial condition for accidents such as LOCA, loss-of-load and loss-of-normal feedwater. The limiting accident analysis results occur at full power conditions when the available core thermal power is maximized. The proposed change does not affect the specified pressurizer level limit at any power level from zero to full power. That is, the pressurizer level limit is not being changed in Modes 1 and 2.
NL-05-062 Docket No. 50-286 Attachment 1 Page 5 of 7 The proposed change does revise the specified pressurizer water level limit in Mode 3 (Hot Standby) but this does not affect accident analysis results because the limiting analyses will remain those that are postulated to occur in Mode 1 with the plant at full power.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not involve physical changes to existing plant equipment or the installation of any new equipment. The design of the pressurizer, the pressurizer level control system and the pressurizer safety valves is not being changed and the ability of these systems, structures, and components to perform their design or safety functions is not being affected. The proposed change revises the specified limit on pressurizer water level in Mode 3 (Hot Standby) to allow operators greater flexibility in performing a plant cooldown. The method used in performing the plant cooldown is not being changed. This proposed change does not create new failure modes or malfunctions of plant equipment nor is there a new credible failure mechanism.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No Pressurizer level is an initial condition assumed in certain accident analyses involving an insurge in the pressurizer and an increasing reactor coolant system (RCS) pressure.
These analyses demonstrate that the design pressure for the RCS is not exceeded for the limiting analyses based on the plant at full power. The proposed change does not affect the existing Technical Specification requirement for Mode 1 (Power Operation) or Mode 2 (Plant Startup) and therefore does not affect the assumptions or results of these accident analyses. The margin for RCS design pressure demonstrated by these analysis results is not being reduced. The proposed change only applies to the pressurizer level limit in Mode 3 (Hot Standby) when there is substantially lower thermal energy available to cause rapid expansion of reactor coolant and an insurge to the pressurizer. Protection of the RCS pressure boundary is still maintained by the pressurizer safety valves, which are not being modified by the proposed change in pressurizer water level.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
NL-05-062 Docket No. 50-286 Attachment 1 Page 6 of 7 Based on the above, Entergy Nuclear Operations, Inc. concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92 (c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements / Criteria The proposed changes have been evaluated to determine whether applicable requirements continue to be met. The proposed change is consistent with the Indian Point 2 FSAR. Section 4.2.2.2 states, 'The pressurizer maintains the required reactor coolant pressure during steady-state operation, limits the pressure changes caused by coolant thermal expansion and contraction during normal load transients, and prevents the pressure in the reactor coolant system from exceeding the design pressure." This design function of the pressurizer will continue to be met with the proposed new water level limit in Mode 3, and no change to the FSAR is needed.
Changes to the Technical Specification Bases are proposed to provide information about the limit on pressurizer level in Mode 3. The existing Bases state 'The intent of the LCO (e.g. 3.4.9) is to ensure that a steam bubble exists in the pressurizer prior to power operation to minimize the consequences of potential overpressure transients." This intent will continue to be satisfied with the proposed change. The new level limit still ensures that a steam bubble exists in the pressurizer in Mode 3. The limit on pressurizer level and the corresponding steam bubble in the pressurizer prior to power operation is not affected, because the existing level limit is not being changed for Modes 1 and 2. In addition, proposed changes to the Bases specify that whenever pressurizer water level in Mode 3 is above the Mode 1 and 2 limit, a dedicated operator is assigned for operating and controlling the chemical and volume control system, including monitoring pressurizer water level. This new requirement will be implemented in plant operating procedures.
Although IP2 is not a Standard Review Plan (SRP) plant, SRP Section 15.5.1 /2 (Inadvertent Operation of ECCS and CVCS Malfunction that Increases the Reactor Coolant Inventory) does provide guidance regarding pressurizer insurge causing water relief through the pressurizer safety valves, followed by a failure to reclose, resulting in SBLOCA. The proposed use of a dedicated operator, as well as the potential for safety valve function during water relief, provides reasonable assurance that this condition is prevented.
The NRC review and approval of stretch power (SPU) operation at IP2 (Reference 1) applied criteria from SRP Section 15.4.6 (CVCS Malfunction that Results in a Decrease in RCS Boron Concentration). The proposed change in Mode 3 pressurizer water level has no affect on the Entergy analysis and NRC basis for SPU approval. For operation in Mode 3 the analysis credits at least one RCP being in service to assure that inadvertent boron dilution from a CVCS malfunction can be detected and mitigated by operator action before shutdown margin is lost. Having at least one RCP in service assures adequate mixing so that a power excursion resulting from a dilution slug entering the
NL-05-062 Docket No. 50-286 Attachment 1 Page 7 of 7 core region does not occur. This proposed amendment does not change plant procedures regarding RCP operation in Mode 3.
Entergy has determined that the proposed changes do not require any exemptions or relief from regulatory requirements other than the change requested to Technical Specification Section 3.4.9. The proposed change to the Technical Specification does not affect conformance to any design criteria described in the FSAR and the revised Technical Specification will continue to satisfy Criterion 2 of 10 CFR 50.36.
5.3 Environmental Considerations The proposed change to the IP2 Technical Specifications regarding pressurizer water do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 PRECEDENCE The proposed change in the pressurizer water level limit for Mode 3 plant operation was previously approved for Indian Point 3 (Reference 2).
7.0 REFERENCES
- 1. NRC letter to Entergy Nuclear Operations, Inc, dated October 27, 2004; "Indian Point Nuclear Generating Unit No. 2- Issuance of Amendment [241] RE: 3.26 Percent Power Uprate (TAC MC1 865).
- 2. NRC letter to Entergy Nuclear Operations, Inc, dated March 25, 2003; "Indian Point Nuclear Generating Unit No. 3 - Issuance of Amendment [216] RE: Pressurizer Level Limit in Mode 3 (TAC MB5296).
ATTACHMENT 2 TO NL-05-062 MARKUP OF TECHNICAL SPECIFICATION AND BASES PAGES FOR PROPOSED CHANGES REGARDING PRESSURIZER WATER LEVEL REQUIREMENTS Bold, Italics for added text Strike9Ut for deleted text ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247
Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:
- a. Pressurizer water level
- 65.1% in MODES 1 and 2, or
< 90% in MODE 3; and
- b. Two groups of pressurizer heaters OPERABLE with the capacity of each group Ž150 kW with each group powered from a different safeguards power train.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer water level A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> not within limit.
AND A.2 Fully insert all rods. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND A.3 Place Rod Control System 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in a condition incapable of rod withdrawal.
AND A.4 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. One required group of B.1 Restore required group of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters pressurizer heaters to inoperable. OPERABLE status.
INDIAN POINT 2 3.4.9 - 1 Amendment No. 241
Pressurizer 3.4.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not AND met.
C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS .
SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify pressurizer water level is < 65.1% in MODES 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 and 2, or < 90% In MODE 3.
SR 3.4.9.2 Verify capacity of each required group of pressurizer 24 months heaters is 2 150 kW.
INDIAN POINT 2 3.4.9 - 2 Amendment No. 241
Pressurizer B 3.4.9 NO CHANGES THIS PAGE - FOR INFORMATION ONLY B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.9 Pressurizer BASES BACKGROUND The pressurizer provides a point in the RCS where liquid and vapor are maintained in equilibrium under saturated conditions for pressure control purposes to prevent bulk boiling in the remainder of the RCS. Key functions include maintaining required primary system pressure during steady state operation, and limiting the pressure changes caused by reactor coolant thermal expansion and contraction during normal load transients.
The pressure control components addressed by this LCO include the pressurizer water level, the required heaters, and their controls and emergency power supplies. Pressurizer safety valves and pressurizer power operated relief valves are addressed by LCO 3.4.10, "Pressurizer Safety Valves," and LCO3.4.11, "Pressurizer Power Operated Relief Valves (PORVs)," respectively.
The intent of the LCO is to ensure that a steam bubble exists in the pressurizer prior to power operation to minimize the consequences of potential overpressure transients. The presence of a steam bubble is consistent with analytical assumptions. Relatively small amounts of noncondensible gases can inhibit the condensation heat transfer between the pressurizer spray and the steam, and diminish the spray effectiveness for pressure control.
Electrical immersion heaters, located in the lower section of the pressurizer vessel, keep the water in the pressurizer at saturation temperature and maintain a constant operating pressure. A minimum required available capacity of pressurizer heaters ensures that the RCS pressure can be maintained. The capability to maintain and control system pressure is important for maintaining subcooled conditions in the RCS and ensuring the capability to remove core decay heat by either forced or natural circulation of reactor coolant. Unless adequate heater capacity is available, the hot, high pressure condition cannot be maintained indefinitely and still provide the required subcooling margin in the primary system. Inability to control the system pressure and maintain subcooling under conditions of natural circulation flow in the primary system could lead to a loss of single phase natural circulation and decreased capability to remove core decay heat.
INDIAN POINT 2 B 3.4.9 - 1 Revision 1
Pressurizer B 3.4.9 BASES BACKGROUND (continued)
Pressurizer heaters are powered from either the offsite source or the diesel generators (DGs) through the four 480 V vital buses as follows:
Safeguards Power Train 5A supports heater group 23 (485 kW);
Safeguards Power Train 6A supports heater group 24 (277 kW); and Safeguards Power Train 2A/3A supports both:
heater group 21 from Bus 3A (554 kW); and heater group 22 from Bus 2A (485 kW).
APPLICABLE In MODES 1, 2, and 3, the LCO requirement for a steam bubble is reflected SAFETY implicitly in the accident analyses. The limitinganalysis is for Fo-r ANALYSES events that result in pressurizer insurge (e.g., loss of normal feedwater and the loss of load/turbine trip). Analyses assume that the limiting value for the highest initial pressurizer level is 71.0%. This is an analytical limit and is based on the pressurizer program level at a full power Tayg of 572 Degrees F (65%) (65.1%oplus a %5.9% allowance for instrument error. For other events, the nominal value of pressurizer level is assumed because the effect of initial pressurizer level on PCT is small (Ref. 1). Safety analyses performed for lower MODES are not limiting. All analyses performed from a critical reactor condition assume the existence of a steam bubble and saturated conditions in the pressurizer. In making this assumption, the analyses neglect the small fraction of noncondensible gases normally present.
Safety analyses presented in the UFSAR (Ref. 1) do not take credit for pressurizer heater operation; however, an implicit initial condition assumption of the safety analyses is that the RCS is operating at normal pressure.
The maximum pressurizer water level limit, which ensures that a steam bubble exists in the pressurizer, satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii). Although the heaters are not specifically used in accident analysis, the need to maintain subcooling in the long term during loss of offsite power, as indicated in NUREG-0737 (Ref. 2), is the reason for providing an LCO.
LCO The LCO requires the pressurizer to be OPERABLE with the actual water level less than or equal to 71.0%, in MODES 1 and 2. This maximum pressurizer level of 71.0% is the nominal level of the pressurizer program level at a full power Tavg of 572 Degrees F (65%) (65.1%) plus a 6.0%
5.9% allowance for instrument error. The level limit in MODE 3 is less than or equal to INDIAN POINT 2 B 3.4.9 - 2 Revision I
Pressurizer B 3.4.9 BASES LCO (continued) 90% actual. Pressurizer level indications in the control room are averaged to come up with a value for comparison to the limit. A maximum allowance for instrument error of 5.9% (based on 2 channel measurement) applied to the analytical limit of 71% results in an indicated level that should not exceed 65.1%,
in MODES 1and 2. An instrument error of 5.9% is also conservative to use in Mode 3. In addition, density compensation curves must be applied to the Indicator values when the pressurizer is not at the temperature used for the instrument channel calibration. Whenever pressurizer water level in MODE 3 is above the MODE 1and 2 limit, a dedicated operator is assigned for operating and controlling the chemical and volume control system, including monitoring pressurizer water level.
Limiting the LCO maximum operating water level preserves the steam space for pressure control. The LCO has been established to ensure the capability to establish and maintain pressure control for steady state operation and to minimize the consequences of potential overpressure transients. Requiring the presence of a steam bubble is also consistent with analytical assumptions.
The LCO requires two groups of OPERABLE pressurizer heaters, each with a capacity 2 150 kW. Each of the two groups of pressurizer heaters must be powered from a different DG to ensure that the minimum required capacity of 150 kW can be energized during a loss of offsite power condition assuming the failure of a single DG. The minimum heater capacity required is sufficient to maintain the RCS near normal operating pressure when accounting for heat losses through the pressurizer insulation. By maintaining the pressure near the operating conditions, a wide margin to subcooling can be obtained in the loops.
The value of 150 kW has been demonstrated to be adequate to maintain RCS pressures control.
APPLICABILITY The need for pressure control is most pertinent when core heat can cause the greatest effect on RCS temperature, resulting in the greatest effect on pressurizer level and RCS pressure control. Thus, applicability has been designated for MODES 1 and 2. The applicability is also provided for MODE 3. The purpose is to prevent solid water RCS operation during heatup and cooldown to avoid rapid pressure rises caused by normal operational perturbation, such as reactor coolant pump startup.
In MODES 1, 2, and 3, there is need to maintain the availability of pressurizer heaters, capable of being powered from an emergency power supply. In the event of a loss of offsite power, the initial conditions of these MODES give the greatest demand for maintaining the RCS in a hot pressurized condition with loop subcooling for an extended period. For MODE 4, 5, or 6, it is not necessary to control pressure (by heaters) to ensure loop subcooling for heat transfer when the Residual Heat Removal (RHR) System is in service, and therefore, the LCO is not applicable.
INDIAN POINT 2 B 3.4.9 - 3 Revision 1
Pressurizer B 3.4.9 BASES ACTIONS A.1, A.2. A.3, and A.4 Pressurizer water level control malfunctions or other plant evolutions may result in a pressurizer water level above the nominal upper limit, even with the plant at steady state conditions. If the pressurizer water level is not within the limit, action must be taken to bring the plant to a MODE in which the LCO does not apply. To achieve this status, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the unit must be brought to MODE 3 with all rods fully inserted and incapable of withdrawal.
Additionally, the unit must be brought to MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This takes the unit out of the applicable MODES.
The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
B.1 If one required group of pressurizer heaters is inoperable, restoration is required within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is reasonable considering that the redundant heater group is still available and the low probability of an event during this period. Pressure control may be maintained during this time using the remaining heaters.
C.1 and C.2 If one group of pressurizer heaters are inoperable and cannot be restored in the allowed Completion Time of Required Action B.1, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.4.9.1 REQUIREMENTS This SR requires that during steady state operation, pressurizer level is maintained below the nominal upper limit to provide a minimum space for a steam bubble. The LCO requires that the actual pressurizer water level be less than or equal to 71.0% in MODES 1 and 2, or 90% in MODE 3.
Pressurizer level indications in the control room are averaged to come up with a value for comparison to the limit. An additional margin of approximately 5.9%, should be allowed for instrument error (i.e., the indicated level should not exceed 65.1% in MODES 1 and 2. In MODE 3, instrument uncertainty and density compensation curves must be applied to assure that the actual level limit of 90% is met. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> has been shown by operating INDIAN POINT 2 B 3.4.9 - 4 Revision 1
Pressurizer B 3.4.9 BASES SURVEILLANCE REQUIREMENTS (continued) practice to be sufficient to regularly assess level for any deviation and verify that operation is within safety analyses assumption of ensuring that a steam bubble exists in the pressurizer. Alarms are also available for early detection of abnormal level indications. In MODE 3 with level above the MODE 1 and 2 limit, pressurizer level monitoring is enhanced by use of a dedicated operator.
SR 3.4.9.2 The SR is satisfied when the power supplies are demonstrated to be capable of producing the minimum power and the associated pressurizer heaters are verified to be at their design rating. This may be done separately by testing the power supply output which is performed by surveillance tests required by LCO 3.8.1, "AC Sources - Operating," and by performing an electrical check on heater element continuity and resistance. The Frequency of 24 months is considered adequate to detect heater degradation and has been shown by operating experience to be acceptable.
REFERENCES 1. UFSAR, Section 14.
- 2. NUREG-0737, November 1980.
INDIAN POINT 2 B 3.4.9- 5 Revision 1
ATTACHMENT 3 TO NL-05-062 ENTERGY COMMITMENTS FOR PROPOSED CHANGES REGARDING PRESSURIZER WATER LEVEL REQUIREMENTS ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247
Attachment 3 to NL-05-062 Docket 50-247 Page 1 of 1 COMMITMENTS REGARDING PROPOSED IP2 LICENSE AMENDMENT REQUEST FOR RELAXATION OF PRESSURIZER LEVEL REQUIREMENT IN MODE 3 Number Commitment Due Date NL-05-062-A Revise Technical Specification Bases to specify a On or before the requirement that a dedicated operator is assigned implementation for operating and controlling the chemical and date established volume control system, including monitoring when the License pressurizer level, whenever pressurizer level in amendment is Mode 3 is above the Mode 1 and 2 limit. issued.
NL-05-062-B Revise the operating procedure for plant cooldown Prior to use of the from Mode 3 to Mode 4 to implement the relaxed limit on requirement for a dedicated operator as stated in pressurizer water the revised Technical Specification Bases. level in Mode 3.