NL-05-0356, Withdrawal of Technical Specifications Revision Request, Section 5.3.1, Unit Staff Qualifications

From kanterella
(Redirected from NL-05-0356)
Jump to navigation Jump to search

Withdrawal of Technical Specifications Revision Request, Section 5.3.1, Unit Staff Qualifications
ML051800269
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/27/2005
From: Sumner H
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-05-0356
Download: ML051800269 (2)


Text

H. L Sumner. Jr.

Vice President Hatch Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERNAN COMPANY Energy to Serve YourWorld' June 27, 2005 Docket Nos.:

50-321 50-366 NL-05-0356 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Withdrawal of Technical Specifications Revision Request Section 5.3.1. Unit Staff Oualifications Ladies and Gentlemen:

By letter dated July 20, 2004 (NL-04-0946), Southern Nuclear Operating Company (SNC) submitted a request to revise the Edwin 1. Hatch Nuclear Plant (HNP) Unit I and Unit 2 Technical Specifications. The proposed change was to revise Administrative Controls Technical Specification 5.3.1, Unit Staff Qualifications. In response to this request, SNC received a draft Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) on October 29, 2004. Subsequent discussions with the NRC and HNP staffs regarding resolution of the draft RAI have indicated that it would be prudent at this time for SNC to withdraw this request. However, SNC plans to re-submit the application with certain modifications based on additional insights gained from these discussions.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, H. L. Sumner, Jr.

HLS/tmm1sdl (Distribution on following page)

,jM 

U. S. Nuclear Regulatory Commission NL-05-0356 Page 2 cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RType: CHAO2.004 U. S. Nuclear Regzulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch State of Georgia Mr. L. C. Barrett, Commissioner - Department of Natural Resources