MONTHYEARNL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks ML23165A2192023-06-13013 June 2023 Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73 NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 NL-22-0977, License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing2023-02-0909 February 2023 License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002) ND-22-0894, License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)2022-12-19019 December 2022 License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005) ML22307A0072022-11-0202 November 2022 Draft LAR for TS 3.8.3 Inverters Operating Completion Time Extension ML22326A1092022-10-31031 October 2022 Bases for Improved Technical Specifications NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-09-13013 September 2022 Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902022-06-30030 June 2022 License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML22179A1482022-06-15015 June 2022 Technical Specifications Bases, Revision 70 NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-0984, Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-11-10010 November 2021 Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-21-0845, License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2021-09-30030 September 2021 License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications ML21179A0952021-06-15015 June 2021 8 to Technical Specifications Bases, List of Effective Sections NL-21-0444, Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values2021-05-0606 May 2021 Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values ML21102A2222021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report NL-21-0265, 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications2021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications NL-20-0173, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values2021-03-30030 March 2021 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-18-1302, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ...2018-12-19019 December 2018 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ... ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables ND-18-0647, Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017)2018-07-20020 July 2018 Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017) ND-18-0374, Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)2018-04-13013 April 2018 Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009) ND-17-1559, Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034)2017-09-22022 September 2017 Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034) NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NL-16-2206, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process NL-16-2080, Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process NL-16-1246, Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment2016-08-12012 August 2016 Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment NL-16-0091, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application.2016-07-28028 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application. NL-16-0686, Response to Request for Additional Information Regarding Adoption of TSTF-432, Rev. 1, Change in Technical Specifications End States (WCAP-16294)2016-05-0909 May 2016 Response to Request for Additional Information Regarding Adoption of TSTF-432, Rev. 1, Change in Technical Specifications End States (WCAP-16294) NL-14-1974, Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed.2014-12-12012 December 2014 Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed. NL-14-0869, Response to Request for Additional Information Regarding Revision to Technical Specification 3.7.14 Completion Time2014-05-30030 May 2014 Response to Request for Additional Information Regarding Revision to Technical Specification 3.7.14 Completion Time NL-13-1727, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)2013-08-0707 August 2013 Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS) NL-13-0081, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement...2013-01-23023 January 2013 Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement... NL-12-1192, Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System2012-09-26026 September 2012 Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines.2012-09-13013 September 2012 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. NL-12-0561, License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report.2012-03-22022 March 2012 License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report. NL-11-1004, Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.2011-07-26026 July 2011 Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6. ML1120709912011-07-26026 July 2011 Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6. 2024-07-25
[Table view] Category:Bases Change
MONTHYEARNL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks ML23165A2192023-06-13013 June 2023 Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73 NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002) ML22326A1092022-10-31031 October 2022 Bases for Improved Technical Specifications NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902022-06-30030 June 2022 License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML22179A1482022-06-15015 June 2022 Technical Specifications Bases, Revision 70 NL-21-0845, License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2021-09-30030 September 2021 License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System ML21179A0952021-06-15015 June 2021 8 to Technical Specifications Bases, List of Effective Sections NL-20-0173, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values2021-03-30030 March 2021 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values NL-21-0265, 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications2021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications ML21102A2222021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-18-1302, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ...2018-12-19019 December 2018 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ... ND-18-0374, Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)2018-04-13013 April 2018 Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009) ND-17-1559, Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034)2017-09-22022 September 2017 Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034) NL-16-2080, Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process NL-16-2206, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process NL-16-0091, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application.2016-07-28028 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application. NL-16-0686, Response to Request for Additional Information Regarding Adoption of TSTF-432, Rev. 1, Change in Technical Specifications End States (WCAP-16294)2016-05-0909 May 2016 Response to Request for Additional Information Regarding Adoption of TSTF-432, Rev. 1, Change in Technical Specifications End States (WCAP-16294) NL-13-0081, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement...2013-01-23023 January 2013 Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement... NL-12-1192, Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System2012-09-26026 September 2012 Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System NL-12-0561, License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report.2012-03-22022 March 2012 License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report. NL-10-2078, License Amendment Request for Incorporation of Previously NRC Approved Tech Spec Task Force Standard Technical Specification Change Traveler TSTF-361-A, Rev 2, Allow Standby Sdc/Rhr/Dhr Loop to Inoperable to Support Testing.2011-03-14014 March 2011 License Amendment Request for Incorporation of Previously NRC Approved Tech Spec Task Force Standard Technical Specification Change Traveler TSTF-361-A, Rev 2, Allow Standby Sdc/Rhr/Dhr Loop to Inoperable to Support Testing. NL-09-1431, License Amendment Request for Technical Specification Table 3.3.1-12010-02-0202 February 2010 License Amendment Request for Technical Specification Table 3.3.1-1 NL-06-0266, Request for Technical Specification Amendment Re Containment Tendon Surveillance Program2006-03-29029 March 2006 Request for Technical Specification Amendment Re Containment Tendon Surveillance Program NL-04-2205, Changes to Technical Specification Bases2004-11-10010 November 2004 Changes to Technical Specification Bases NL-04-0564, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, Application for Technical Specification Amendment to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors2004-05-21021 May 2004 Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, Application for Technical Specification Amendment to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors NL-03-1365, Revision to Bases2003-06-24024 June 2003 Revision to Bases NL-03-1388, Revision to Technical Requirements Manual2003-06-24024 June 2003 Revision to Technical Requirements Manual NL-03-1140, Changes to Technical Specification Bases2003-06-11011 June 2003 Changes to Technical Specification Bases 2024-07-25
[Table view] |
Text
Intracompany Correspondence SOUTHERN AA COMPANY Eners to Serve Your We er&
DATE: June 24,2003 NL-03-1388 RE: Vogtle Electric Generating Plant Revision to Technical Requ"m5 ntsyanuy FROM: N. J. Stringfellow f TO: Technical Requireme Manua ers Enclosed are revised pages for the Technical Requirements Manual. This revision provides clarification to the required actions, completion times, and instrumentation and surveillance Identified in TRM Table 13.3.2-1. This change was approved with LDCR 2003018.
NJS/TDH
Attachment:
Instructions and Change Pages cc: SNC Document Services - RType: CVA02.002 0-01
VOGTLE ELECTRIC GENERATING PLANT TECHNICAL REQUIREMENTS MANUAL Revision Insertion Instructions June 24, 2003 Page/Section Instructions List of Effective Pages Replace.
- p. 13.3-3/-4 Replace.
- p. 13.3-5 / - 6 Replace.
- p. 13.3-7/-8 Replace.
Transmittal letter and these instructions Discard after use.
Acknowledgment Receipt Sign and retum.
List of Effective Pages Table of Contents 1 1 10/1397 Table of Contents 2 2 3122/99 Table of Contents 3 1 1013/97 11.0-1 0 12/26/96 11.0-2 0 12/26/96 13.0-1 1 11/22/99 13.0-2 1 11/22/99 13.0-3 1 11/22/99 13.0-4 1 11/22/99 13.1-1 0 12/26196 13.1-2 2 1/8/99 13.1-3 0 12126/96 13.1-4 0 12/16/96 13.1-5 1 1/8/99 13.1-6 2 3117/98 13.1-7 0 12/26/96 13.1-8 0 12126196 13.1-9 0 12126/96 13.1-10 0 12/26196 13.1-11 0 12126196 13.1-12 1 10/22/98 13.1-13 1 2/18/99 13.1-14 1 8/5/97 13.1-15 0 12/26/96 13.3-1 0 12/26/96 13.3-2 0 12/26/96 13.3-3 1 05126199 13.3-4 2 6/24/03 13.3-5 2 6/24/03 13.3-6 2 6/24/03 13.3-7 2 6/24/03 13.3-8 1 05/26/99 13.3-9 0 12/26/96 13.3-10 2 11/22/99 13.3-11 0 12/26/96 13.3-12 2 06/04/02 13.3-13 1 1/21/99 13.3-14 0 12/26/96 13.3-15 0 12/26/96 13.3-16 0 12/26196 13.3-17 0 12/26/96 Vogtle Units 1 and 2 I Rev. 10 Technical Requirement 6/24/03
Ust of Effective Pages (continued) 13.3-18 0 12/26B96 13.4-1 0 12/26196 13.4-2 0 -. 12126/98 13.4-3 ' '_i_ __0_-_- 122B/9B 13.4-4 0 . 12126196 13.4-5 O _'i - _' 12/26196 13.4B_ 'I' '_' _ . 1' ' 03/17/00 13.473 1 . 03117/00 13.48 ;8 0 03/17/00 13.5-1 0 12126/96 13.5-2 0 120/3197 13.5-3 1 10/12100 13.57- 0 10/3/97 13.7-1 0 12/26196 13.7-1 1 0 12/22198 13.7-1 0 12/26/96 13.7-2 - C0 12/26/96 13.7-3 .. 0 12/26/96 13.74 01 10/22/98 13.7-5 0 12126/96 13.7-7 13.7-10 0 1 12126198 412/609 13.7-11 0 12/26/96 13.7-12 1 4/11/01 13.7-13 0 12126/96 13.7-14 0 12126/96 13.7-14 0 12/26/96 13.7-15 0 12/26/96 13.7-17 O _ 12126196 13.81 1 10/22198 i3.8-2 '0 12126/97 13.8-3 0 12126196 13.8-4 1 0512/299 13.8-5 0 12/26/96 13.8-8 0 12/26196 13.8-7 0 12/26/96 13.8-10 1 3122/99 13.8-11 1 3122/99 13.9-1 0 12/26/98 13.9-2 0 12/26/96 Vogtle Units I and 2 2 Rev. 10 Technical Requirement 6/24/03
List of Effective Pages (continued) ,
13.9-3 e 0 . 12/26/96 13.9-4 1 . 10/29/97 13.94a. 1 ;_ _ 10/29/97 13.9-4b I;..' .-. 10/29197 13.9-5 _ !.,s ;! e * . ..... ~. __-_ _ _; -_ 6/319X _
13.9-6 2 10/3/02 13.9-7 2 _ , _ 1013102.
13.9-7a 'i ' - . 1._ - 6/8/98.
13.9-7b -: . 1I;. . , 6/3L98 13.8-8 .j, 0 12126196 13.9-9 - -- - P12/26196 13.9-10 1 , :. Q22/97 13.12-1 , , ' 12/26196 13.12-2 00 12/26/96 -
13.12-3 0 -12/26/96..
13.12-4 ; . . : 12/26196 13.12-5 .. , 0 . , 12/26/96 !
13.12-6 0 . _ . 12/26/96..
13.12-7 - 0 12/26/96 13.12-8 - 0 12/O6,96.
13.12-9 . ._ 0 . 12/26t96 15.1-1 00" 12/26/96.
15.1-2 .:- 0 , . . .126/96 tfl 3 F
'22 C
- a) s:/vogUe/IrmIAPL .doc a
- :j
', I.
0 '1
) ,. 'C F.
. .'. 1, - 'I
. I i' r Vogfle Units 1 and 2 3 Rev. 10 Technical Requirement 6/24/03
Seismic Monitoring Instrumentation TR 13.3.2 13.3 Instrumentation TR 13.3.2 Seismic Monitoring Instrumentation (common system)
TR 13.3.2 The seismic monitoring instrumentation Identified in Table 13.3.2-1 shall be OPERABLE.
APPLICABILITY: At all times.
ACTIONS a
WWI I I TR 13.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME NOTE Separate Condition entry Is allowed for each seismic monitoring Instrument.
A. One or more required A.1 Restore Instrumentation to 30 days seismic monitoring OPERABLE status.
instruments inoperable.
B. Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met. the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.
(continued)
Vogtle Units 1 and 2 13.3-3 Rev.1 Technical Requirement 05/26/99
Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS (continued)
K)j CONDITION ' I - REQUIRED ACTION COMPLETION TIME I ........ ._..
C. One or more required C.1 Evaluate data retrieved from" 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> seismic monitoring actuated free-field instruments %'tuated instrumentation.
during a seisnic event
Ž 0.01g. AND.-
. , ,s ,.
-NOTENOTE 14 days
-The CHANNEL
-OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument-evaluationw described in section 4.3 of
-. . ~~~~~~ .?;
.,.NRC Regiilatory Guides 1.166.
.Condut' a CHANNEL ' I4 hours
- OPERATIONAL TEST or'..i-
t actuated free-field
, . 1,i inrtrumentation.
AND C.3 Evaluate data retrieved from ..14 days remaining actuated
- .Instrumentation. co AND C- , .,O:, - .-
C.4 NOTE -
... - .T T ' CH ANNEL' OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument evaluation described in section 4.3 of NRC Regulatory Guide 1.166.
Perform a CHANNEL 14 days OPERATIONAL TEST on remaining actuated instrumentation.
(continued)
Vogue Units 1 and 2 13.3 -4 Rev.2 Technical Requirement 6/24103
Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS CONDITION REQUIRED ACTION. SOMPLETION
-C, TIME
~.. .. . ,1. . . .. . ..1. _
C. (continued) AD
- -1.-- - , tP~repare thpe and adsubmit aa~repot OrpW 14 days to the NRC in accordance., *1..
with 10 CFR 50.4 describing ,
the rmdghitude, frequency
,,.- < spectrjum, results of instrument evaluations, and
, ,i 4-: . ,resultanteffect upon facility features Important to safety.
- , ~ ~
',. ie t,:1 '
_C QE .. .__..
- - I, p-i;,,,.
TECHNICAL REQUIREMENT SiXVEILMI4CES
- ratIT .J I I r-Refer to Tabje 13.3.2-1 todetermline 1yWh.ich ,SRs apply for each seismic monitoring instrument.
SURVEIULANE,. FREQUENCY TRS 13.3.2.1 Perform CHANNEL CHECK 31 days Tj , ' ; _ _ _ _ __,,'_;_
TRS 13.3.2.2 Perform CHANNEL OPERATIONAL TEST. 184 days I TRS 13.3.2.3 Perform CHANNEL CALIBRATION. 18 months
'0t 0~*D tit 39dI.X3 t
e Ptv II
- '.13I Vogtle Units 1 and 2 13.3-5 Rev.2 Technical Requirement 6/24/03
Seismic Instrumentation~~~~~~~~
Monitoring
.J -*
- Seismic Monitoning Instrumentation TR 13.3.2 Table 13.3.2-1 (page 1 of 2)
Seismic Monitoring Instrumentation n~~~~ - ~, -r~n ' -r;
'.; * - I .
Instruments and Sepnrsor Locations -Measurement Range Required Number Surveillance
- .j!oftt.*
? or Setting of Instruments and Requirements Tag Number.
- 1. Triaxial Time-History ... .. ,
Accelerograph with Internal Force Balance Accelerometer r,
.2,
- a. Free Field (rt24000cft from -1gto+ lg 19 TRS 13.3.2.1 containnentr (AXR-19931) TRS 13.3.2.2
- 2. Triaxial Force Balance Apceferometers ,tl ;
. i,.. .
- a. Field (- 225 ft from -19 to +g 19 ' 'TRS 13.3.2.1 containment) (AXT-1g9dd0)- IRS 13.3.2.2 TRS 13.3.2.3
- b. Unit I Containment Gallery -1gto+ lg I TRS 13.3.2.1 (basemat);: -: (AXT-19901) TRS 13.3.2.2
,,a.. . .
TRS 13.3.2.3 '",oFf
- c. Unit 1 Containtment -1gto+1g I TRS 13.3.2.1 Operating Floo . (AXT-1 9902) TRS 13.3.2.2 TRS 13.3.2.3
- d. Unit I Containment I TRS 13.3.2.1 Bioshield Wall (AXT-19903) TRS 13.3.2.2 TRS 13.3.2.3
- e. Auxiliary Building Level I -1 to + 1g I TRS 13.3.2.1 (AXT-19905) TRS 13.3.2.2 TRS 13.3.2.3
- f. Auxiliary Building Basemat -g to+ 1g I TRS 13.3.2.1 (AXT-19906) TRS 13.3.2.2 TRS 13.3.2.3
- g. Diesel Generator Building -g to + 1g TRS 13.3.2.1 Slab Floor (AXT-19925) TRS 13.3.2.2 TRS 13.3.2.3 Vogtle Units I and 2 13.3-6 ; ; Rev. 2 Technical Requirement 6124/03
Seismic Monitoring Instrumentation TR 13.3.2 Table 13.3.2-1 (page 2 of 2)
Seismic Monitoring Instrumentation Instruimefst and Sensor Lo-cations Measurement Range Required Number of Surveillance
- .-;.. . r e}.or 6etting - ' > hnstutnents and Tag Requirements
';t^,
- t. , Number
- 3. Triaxial Time-History xli!
Accelerographs (Recorders) a,fiw ii
- a. Control Room -Ig to + Ig 4 TRS 13.3.2.1 (AXR-19928A,) TRS 13.3.2.2 (AXR-199288)
(AXR-19928C)
(AXR-19928D)
- 4. Central Controlling Unit to Include a computer, keyboard, LCD display, printer, palarm panel, and
.uninterruptible~power supply.
- a. Control Room' N/A 6 TRS 13.3.2.1 (A-2414-5W-SIPCPI) TRS 13.3.2.2
(AXI-19928)
(A-2414-05-SIP-PRI)
(AXA-19928&fi'rn .
(A-2414-Q:SIP4JPS)
!' SI j,. , . 'vI
~11' 4 , , 1:J! '. -,tr..1 ,
. C.CA I -i -
- ..: ;, I f _. "I ,. , i%
{ \' \,
Vogtle Units 1 and 2 13.3-7 Rev. 2 Technical Requirement 6/24/03
Meteorological Instrumentation TR 13.3.3 13.3 Instrumentation TR 13.3.3 Meteorological Instrumentation (common system)
TR 13.3.3 The meteorological monitoring instrumentation channels identified in Table 13.3.3-1 shall be OPERABLE.
APPLICABILITY: At all times.
ACTIONS
%11^TrC P4Ij lI
- 1. TR 13.0.3 is not applicable.
- 2. Separate Condition entry is allowed for each meteorological monitoring instrument channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore instrumentation to 7 days meteorological monitoring OPERABLE status.
instrument channels inoperable.
B. Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.
TECHNICAL REQUIREMENT SURVEILLANCES SURVEILLANCE FREQUENCY TRS 13.3.3.1 Perform a CHANNEL CHECK on each meteorological 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring channel Identified in Table 13.3.3-1.
TRS 13.3.3.2 Perform a CHANNEL CALIBRATION on each 184 days meteorological monitoring channel identified in Table 13.3.3-1.
Vogtle Units 1 and 2 13.3-8 Rev.1 Technical Requirement 05/26/99