NL-03-1388, Revision to Technical Requirements Manual

From kanterella
(Redirected from NL-03-1388)
Jump to navigation Jump to search
Revision to Technical Requirements Manual
ML031840370
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/24/2003
From: Stringfellow N
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-03-1388
Download: ML031840370 (11)


Text

Intracompany Correspondence SOUTHERN AA COMPANY Eners to Serve Your We er&

DATE: June 24,2003 NL-03-1388 RE: Vogtle Electric Generating Plant Revision to Technical Requ"m5 ntsyanuy FROM: N. J. Stringfellow f TO: Technical Requireme Manua ers Enclosed are revised pages for the Technical Requirements Manual. This revision provides clarification to the required actions, completion times, and instrumentation and surveillance Identified in TRM Table 13.3.2-1. This change was approved with LDCR 2003018.

NJS/TDH

Attachment:

Instructions and Change Pages cc: SNC Document Services - RType: CVA02.002 0-01

VOGTLE ELECTRIC GENERATING PLANT TECHNICAL REQUIREMENTS MANUAL Revision Insertion Instructions June 24, 2003 Page/Section Instructions List of Effective Pages Replace.

p. 13.3-3/-4 Replace.
p. 13.3-5 / - 6 Replace.
p. 13.3-7/-8 Replace.

Transmittal letter and these instructions Discard after use.

Acknowledgment Receipt Sign and retum.

List of Effective Pages Table of Contents 1 1 10/1397 Table of Contents 2 2 3122/99 Table of Contents 3 1 1013/97 11.0-1 0 12/26/96 11.0-2 0 12/26/96 13.0-1 1 11/22/99 13.0-2 1 11/22/99 13.0-3 1 11/22/99 13.0-4 1 11/22/99 13.1-1 0 12/26196 13.1-2 2 1/8/99 13.1-3 0 12126/96 13.1-4 0 12/16/96 13.1-5 1 1/8/99 13.1-6 2 3117/98 13.1-7 0 12/26/96 13.1-8 0 12126196 13.1-9 0 12126/96 13.1-10 0 12/26196 13.1-11 0 12126196 13.1-12 1 10/22/98 13.1-13 1 2/18/99 13.1-14 1 8/5/97 13.1-15 0 12/26/96 13.3-1 0 12/26/96 13.3-2 0 12/26/96 13.3-3 1 05126199 13.3-4 2 6/24/03 13.3-5 2 6/24/03 13.3-6 2 6/24/03 13.3-7 2 6/24/03 13.3-8 1 05/26/99 13.3-9 0 12/26/96 13.3-10 2 11/22/99 13.3-11 0 12/26/96 13.3-12 2 06/04/02 13.3-13 1 1/21/99 13.3-14 0 12/26/96 13.3-15 0 12/26/96 13.3-16 0 12/26196 13.3-17 0 12/26/96 Vogtle Units 1 and 2 I Rev. 10 Technical Requirement 6/24/03

Ust of Effective Pages (continued) 13.3-18 0 12/26B96 13.4-1 0 12/26196 13.4-2 0 -. 12126/98 13.4-3 ' '_i_ __0_-_- 122B/9B 13.4-4 0 . 12126196 13.4-5 O _'i - _' 12/26196 13.4B_ 'I' '_' _ . 1' ' 03/17/00 13.473 1 . 03117/00 13.48 ;8 0 03/17/00 13.5-1 0 12126/96 13.5-2 0 120/3197 13.5-3 1 10/12100 13.57- 0 10/3/97 13.7-1 0 12/26196 13.7-1 1 0 12/22198 13.7-1 0 12/26/96 13.7-2 - C0 12/26/96 13.7-3 .. 0 12/26/96 13.74 01 10/22/98 13.7-5 0 12126/96 13.7-7 13.7-10 0 1 12126198 412/609 13.7-11 0 12/26/96 13.7-12 1 4/11/01 13.7-13 0 12126/96 13.7-14 0 12126/96 13.7-14 0 12/26/96 13.7-15 0 12/26/96 13.7-17 O _ 12126196 13.81 1 10/22198 i3.8-2 '0 12126/97 13.8-3 0 12126196 13.8-4 1 0512/299 13.8-5 0 12/26/96 13.8-8 0 12/26196 13.8-7 0 12/26/96 13.8-10 1 3122/99 13.8-11 1 3122/99 13.9-1 0 12/26/98 13.9-2 0 12/26/96 Vogtle Units I and 2 2 Rev. 10 Technical Requirement 6/24/03

List of Effective Pages (continued) ,

13.9-3 e 0 . 12/26/96 13.9-4 1 . 10/29/97 13.94a. 1 ;_ _ 10/29/97 13.9-4b I;..' .-. 10/29197 13.9-5 _  !.,s  ;! e * . ..... ~. __-_ _ _; -_ 6/319X _

13.9-6 2 10/3/02 13.9-7 2 _ , _ 1013102.

13.9-7a 'i ' - . 1._ - 6/8/98.

13.9-7b -: . 1I;. . , 6/3L98 13.8-8 .j, 0 12126196 13.9-9 - -- - P12/26196 13.9-10 1 ,  :. Q22/97 13.12-1 , , ' 12/26196 13.12-2 00 12/26/96 -

13.12-3 0 -12/26/96..

13.12-4  ; . .  : 12/26196 13.12-5 .. , 0 . , 12/26/96  !

13.12-6 0 . _ . 12/26/96..

13.12-7 - 0 12/26/96 13.12-8 - 0 12/O6,96.

13.12-9 . ._ 0 . 12/26t96 15.1-1 00" 12/26/96.

15.1-2 .:- 0 , . . .126/96 tfl 3 F

'22 C

  • a) s:/vogUe/IrmIAPL .doc a

- :j

', I.

0 '1

) ,. 'C F.

. .'. 1, - 'I

. I i' r Vogfle Units 1 and 2 3 Rev. 10 Technical Requirement 6/24/03

Seismic Monitoring Instrumentation TR 13.3.2 13.3 Instrumentation TR 13.3.2 Seismic Monitoring Instrumentation (common system)

TR 13.3.2 The seismic monitoring instrumentation Identified in Table 13.3.2-1 shall be OPERABLE.

APPLICABILITY: At all times.

ACTIONS a

WWI I I TR 13.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME NOTE Separate Condition entry Is allowed for each seismic monitoring Instrument.

A. One or more required A.1 Restore Instrumentation to 30 days seismic monitoring OPERABLE status.

instruments inoperable.

B. Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met. the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.

(continued)

Vogtle Units 1 and 2 13.3-3 Rev.1 Technical Requirement 05/26/99

Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS (continued)

K)j CONDITION ' I - REQUIRED ACTION COMPLETION TIME I ........ ._..

C. One or more required C.1 Evaluate data retrieved from" 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> seismic monitoring actuated free-field instruments  %'tuated instrumentation.

during a seisnic event

Ž 0.01g. AND.-

. , ,s ,.

-NOTENOTE 14 days

-The CHANNEL

-OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument-evaluationw described in section 4.3 of

-. . ~~~~~~ .?;

.,.NRC Regiilatory Guides 1.166.

.Condut' a CHANNEL ' I4 hours

- OPERATIONAL TEST or'..i-

t actuated free-field

, . 1,i inrtrumentation.

AND C.3 Evaluate data retrieved from ..14 days remaining actuated

- .Instrumentation. co AND C- , .,O:, - .-

C.4 NOTE -

... - .T T ' CH ANNEL' OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument evaluation described in section 4.3 of NRC Regulatory Guide 1.166.

Perform a CHANNEL 14 days OPERATIONAL TEST on remaining actuated instrumentation.

(continued)

Vogue Units 1 and 2 13.3 -4 Rev.2 Technical Requirement 6/24103

Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS CONDITION REQUIRED ACTION. SOMPLETION

-C, TIME

~.. .. . ,1. . . .. . ..1. _

C. (continued) AD

-1.-- - , tP~repare thpe and adsubmit aa~repot OrpW 14 days to the NRC in accordance., *1..

with 10 CFR 50.4 describing ,

the rmdghitude, frequency

,,.- < spectrjum, results of instrument evaluations, and

, ,i 4-: . ,resultanteffect upon facility features Important to safety.

, ~ ~

',. ie t,:1 '

_C QE .. .__..

- - I, p-i;,,,.

TECHNICAL REQUIREMENT SiXVEILMI4CES

- ratIT .J I I r-Refer to Tabje 13.3.2-1 todetermline 1yWh.ich ,SRs apply for each seismic monitoring instrument.

SURVEIULANE,. FREQUENCY TRS 13.3.2.1 Perform CHANNEL CHECK 31 days Tj , '  ; _ _ _ _ __,,'_;_

TRS 13.3.2.2 Perform CHANNEL OPERATIONAL TEST. 184 days I TRS 13.3.2.3 Perform CHANNEL CALIBRATION. 18 months

'0t 0~*D tit 39dI.X3 t

e Ptv II

- '.13I Vogtle Units 1 and 2 13.3-5 Rev.2 Technical Requirement 6/24/03

Seismic Instrumentation~~~~~~~~

Monitoring

.J -*

  • Seismic Monitoning Instrumentation TR 13.3.2 Table 13.3.2-1 (page 1 of 2)

Seismic Monitoring Instrumentation n~~~~ - ~, -r~n ' -r;

'.; * - I .

Instruments and Sepnrsor Locations -Measurement Range Required Number Surveillance

- .j!oftt.*

? or Setting of Instruments and Requirements Tag Number.

1. Triaxial Time-History ... .. ,

Accelerograph with Internal Force Balance Accelerometer r,

.2,

a. Free Field (rt24000cft from -1gto+ lg 19 TRS 13.3.2.1 containnentr (AXR-19931) TRS 13.3.2.2
  • . .t TRS 13.3.2.3
2. Triaxial Force Balance Apceferometers ,tl ;

. i,.. .

a. Field (- 225 ft from -19 to +g 19 ' 'TRS 13.3.2.1 containment) (AXT-1g9dd0)- IRS 13.3.2.2 TRS 13.3.2.3
b. Unit I Containment Gallery -1gto+ lg I TRS 13.3.2.1 (basemat);: -: (AXT-19901) TRS 13.3.2.2

,,a.. . .

TRS 13.3.2.3 '",oFf

c. Unit 1 Containtment -1gto+1g I TRS 13.3.2.1 Operating Floo . (AXT-1 9902) TRS 13.3.2.2 TRS 13.3.2.3
d. Unit I Containment I TRS 13.3.2.1 Bioshield Wall (AXT-19903) TRS 13.3.2.2 TRS 13.3.2.3
e. Auxiliary Building Level I -1 to + 1g I TRS 13.3.2.1 (AXT-19905) TRS 13.3.2.2 TRS 13.3.2.3
f. Auxiliary Building Basemat -g to+ 1g I TRS 13.3.2.1 (AXT-19906) TRS 13.3.2.2 TRS 13.3.2.3
g. Diesel Generator Building -g to + 1g TRS 13.3.2.1 Slab Floor (AXT-19925) TRS 13.3.2.2 TRS 13.3.2.3 Vogtle Units I and 2 13.3-6  ; ; Rev. 2 Technical Requirement 6124/03

Seismic Monitoring Instrumentation TR 13.3.2 Table 13.3.2-1 (page 2 of 2)

Seismic Monitoring Instrumentation Instruimefst and Sensor Lo-cations Measurement Range Required Number of Surveillance

  • .-;.. . r e}.or 6etting - ' > hnstutnents and Tag Requirements

';t^,

t. , Number
3. Triaxial Time-History xli!

Accelerographs (Recorders) a,fiw ii

a. Control Room -Ig to + Ig 4 TRS 13.3.2.1 (AXR-19928A,) TRS 13.3.2.2 (AXR-199288)

(AXR-19928C)

(AXR-19928D)

4. Central Controlling Unit to Include a computer, keyboard, LCD display, printer, palarm panel, and

.uninterruptible~power supply.

a. Control Room' N/A 6 TRS 13.3.2.1 (A-2414-5W-SIPCPI) TRS 13.3.2.2
  • ^ - (A-2414-Q5-SIPQKB1)'

(AXI-19928)

(A-2414-05-SIP-PRI)

(AXA-19928&fi'rn .

(A-2414-Q:SIP4JPS)

!' SI j,. , . 'vI

~11' 4 , , 1:J! '. -,tr..1 ,

. C.CA I -i -

- ..: ;, I f _. "I ,. , i%

{ \' \,

Vogtle Units 1 and 2 13.3-7 Rev. 2 Technical Requirement 6/24/03

Meteorological Instrumentation TR 13.3.3 13.3 Instrumentation TR 13.3.3 Meteorological Instrumentation (common system)

TR 13.3.3 The meteorological monitoring instrumentation channels identified in Table 13.3.3-1 shall be OPERABLE.

APPLICABILITY: At all times.

ACTIONS

%11^TrC P4Ij lI

1. TR 13.0.3 is not applicable.
2. Separate Condition entry is allowed for each meteorological monitoring instrument channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore instrumentation to 7 days meteorological monitoring OPERABLE status.

instrument channels inoperable.

B. Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.

TECHNICAL REQUIREMENT SURVEILLANCES SURVEILLANCE FREQUENCY TRS 13.3.3.1 Perform a CHANNEL CHECK on each meteorological 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring channel Identified in Table 13.3.3-1.

TRS 13.3.3.2 Perform a CHANNEL CALIBRATION on each 184 days meteorological monitoring channel identified in Table 13.3.3-1.

Vogtle Units 1 and 2 13.3-8 Rev.1 Technical Requirement 05/26/99