Entergy Nuclear Northeast Entergy Nuclear Operations. Inc.

Indian Point Energy Center 295 Broadway, Suite I PO. Box 249 Buchanan, NY 10511-0249 February 15, 2002 Re:

Indian Point Unit No. 2 Docket No. 50-247 NL-02-019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report - January 2002

Dear Sir:

Enclosed is the Monthly Operating Report for Indian Point Unit No. 2 for January 2002.

There are no commitments contained in this letter.

Should you have any questions regarding this matter, please contact Mr. John McCann, Manager, Nuclear Safety and Licensing (914) 734-5074.

Fred Dacimo Vice President - Operations Indian Point 2 Enclosure cc:

Mr. Hubert J. Miller Regional Administrator - Region I US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Senior Resident Inspector US Nuclear Regulatory Commission Indian Point Unit 2 PO Box 38 Buchanan, NY 10511 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

NL-02-019 Enclosure Page 1of 4 OPERATING DATA REPORT DOCKET NO.

50-247 DATE February 5, 2002 COMPLETED BY K. Krieger TELEPHONE (914)734-5146 OPERATING STATUS

1.
2.
3.
4.
5.
6.
7.

8.

Unit Name:

INDIAN POINT UNIT No. 2 Notes Reporting Period:

January-2002 Licensed Thermal Power ( MWt):

3071.4 Nameplate Rating ( Gross Mwe ):

1008 Design Electrical Rating ( Net Mwe):

986 Maximum Dependable Capacity ( Gross Mwe):

985 Maximum Dependable Capacity (Net Mwe ):

951 If Changes Occur in Capacity Ratings ( Items Number 3 Through 7 ) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any :

This Month Yr.-to-Date

11. Hours In Reporting Period 744 744
12. Number Of Hours Reactor Was Critical 744 744
13. Reactor Reserve Shutdown Hours 0

0

14. Hours Generator On-Line 744 744
15. Unit Reserve Shutdown Hours 0

0

16. Gross Thermal Energy Generated ( MWH) 2,279,903 2,279,903
17. Gross Electrical Energy Generated ( MWH) 764,342 764,342
18. Net Electrical Energy Generated ( MWH) 739,398 739,398
19. Unit Service Factor 100.0 100.0
20. Unit Availability Factor 100.0 100.0
21. Unit Capacity Factor ( Using MDC Net) 104.5 104.5
22. Unit Capacity Factor ( Using DER Net) 100.8 100.8
23. Unit Forced Outage Rate 0

0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration Of Each ) :
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status ( Prior to Commercial Operation ) :

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast N/A N/A N/A Cumulative 241,849 167,244.75 4,566.64 163,385.05 0

458,792,306 143,011,232 136,962,320 67.6 67.6 63.5 61.4 14.4 Achieved N/A N/A N/A (9/77)

NL-02-019 Enclosure Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE February 5, 2002 COMPLETED BY K. Krieger TELEPHONE (914)734-5146 January-2002 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 997 2

999 3

999 4

999 5

999 6

999 7

997 8

1002 9

993 10 998 11 997 12 997 13 997 14 995 15 996 16 997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 998 18 998 19 998 20 999 21 998 22 997 23 993 24 983 25 983 26 984 27 983 28 983 29 984 30 981 31 983 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH January-2002 DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE February 5, 2002 COMPLETED BY K. Krieger TELEPHONE (914)734-5146 1

F : Forced S : Scheduled 2

Reason :

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other ( Explain )

4 Exibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report ( LER) File ( NUREG-0161) 5 Exibit I - Same Source 0

w* w (9/77)

CA

r.

Licensee No.

Date Event E

Cause & Corrective Action to Prevent Recurrence Report#

o NONE

NL-02-019 Enclosure Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE January 2002 Unit 2 operated at full power for the entire month of January.

Major Safety Related Maintenance DATE W.O #

SYSTEM COMPONENT COMPLETED WORK PERFORMED 02-25156 CH PC-406A 1/4/02 Replaced and calibrated 21 auxiliary feedwater controller.

01-24131 MC R-29 1/11/02 Replaced and calibrated main steam line radiation detector.

02-25325 CH LR-437 1/18/02 Replaced 23 steam generator level recorder.

02-25299 MC R-27 1/20/02 Replaced low range pump and converter for plant 02-25315 1vent noble gas effluent monitor.