NEI 99-01, Revision to Nine Mile Point Units 1 and 2 Emergency Action Levels in Accordance with NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5

From kanterella
Jump to navigation Jump to search
Revision to Nine Mile Point Units 1 and 2 Emergency Action Levels in Accordance with NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5
ML11130A150
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 05/06/2011
From: Kaminski J J
Constellation Energy Group, EDF Group, Constellation Energy Nuclear Group
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NEI 99-01
Download: ML11130A150 (2)


Text

CENGM a joint venture of Constellatbonl

'~Energy4,%D 0 01 NINE MILE POINT NUCLEAR STATION P.O. Box 63 Lycoming, New York 13093 May 6, 2011 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Nine Mile Point Nuclear Station Unit Nos. 1 and 2; Docket Nos. 50-220 and 50-4 10 Revision to Nine Mile Point Unit 1 and Unit 2 Emergency Action Levels in Accordance with NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5 Nine Mile Point Nuclear Station, LLC (NMPNS) requests NRC approval to implement revised Emergency Action Levels (EALs) at Nine Mile Point Unit 1 (NMP1) and Nine Mile Point Unit 2 (NMP2)in accordance with 10 CFR Part 50, Appendix E, Section IV(B)(1).

Specifically, the EAL scheme used at both NMP1 and NMP2 would change from NUMARC/NESP-007, Methodology for Development of Emergency Action Levels, Revision 2, to the scheme delineated in NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5.The proposed EAL changes will be implemented within 1 year following NRC approval.

The implementation time was selected to allow for operator and Emergency Response Organization familiarization.

Emergency Preparedness representatives from the New York State Office of Emergency Management and Oswego County have reviewed and are in agreement with the proposed EAL changes.The Attachments to this letter provide the documents which support the NMP 1 and NMP2 proposed EAL scheme change. Attachments 1 and 2 provide the EAL Comparison Matrix for NMP1 and NMP2, respectively.

The Comparison Matrix is a line-by-line comparison of the Initiating Conditions (ICs), Mode Applicability and EALs described in NEI 99-01, Revision 5, and the proposed Nine Mile Point ICs, Mode Applicability and EALs. Attachments 3 and 4 provide the NMP1 and NMP2 EAL Technical Bases documents, which present an explanation and the rationale for each EAL being proposed.

Document Control Desk May 6, 2011 Page 2 Attachments 5 and 6 provide the EAL Technical Bases documents (strike-out version), which highlight the differences between the NEI 99-01, Revision 5 suggested wording and the NMPNS proposed wording. The offsite agency approvals are contained in Attachment

7. Attachments 8 and 9 provide the EAL Matrixes (wall charts) for NMP 1 and NMP2, respectively.

Should you have any questions regarding the information in this submittal, please contact John J. Dosa, Director Licensing, at (315) 349-5219.Very truly your o J. Ka nski ector Emergency Preparedness JJIK/JMT Attachments:

1) Unit 1 EAL Comparison Matrix 2) Unit 2 EAL Comparison Matrix 3) EPMP-EPP-0101, Unit 1 Emergency Classification Technical Bases 4) EPMP-EPP-0 102, Unit 2 Emergency Classification Technical Bases 5) EPMP-EPP-0101, Unit 1 Emergency Classification Technical Bases (Strike-out Version)6) EPMP-EPP-0102, Unit 2 Emergency Classification Technical Bases (Strike-out Version)7) Offsite Agency Approvals 8) EPIP-EP-001 Attachment 1 EAL Matrix Unit 1 9) EPIP-EP-002 Attachment 1 EAL Matrix Unit 2 cc: Regional Administrator, Region I, NRC Project Manager, NRC Resident Inspector, NRC