ND-18-1545, Notice of Uncompleted ITAAC 225-Days Prior to Initial Fuel Load Item E.3.9.03.00.02 (Index Number 848)

From kanterella
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-Days Prior to Initial Fuel Load Item E.3.9.03.00.02 (Index Number 848)
ML18355A901
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/20/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-18-1545
Download: ML18355A901 (6)


Text

Michael J. Yox 7825 River Road

~ Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel 410-4 74-8587 cell DEC 2 0 2018 myox @southernco.com Docket Nos.: 52-026 ND-18-1545 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Notice of Uncompleted ITMC 225-days Prior to Initial Fuel Load Item E.3.9.03.00.02 [Index Number 848]

Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of December 19, 2018, Vogtle Electric Generating Plant (VEGP) Unit 4 Uncompleted Inspections, Tests, Analyses , and Acceptance Criteria (ITAAC) Item E.3.9.03.00.02 [Index Number 848] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01 , Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which req uired inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted,

~44t Michael J. Yox Regulatory Affairs Di ector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 4 Completion Plan for Uncompleted ITAAC E.3.9.03.00.02 [Index Number 848]

MJY/ RLB/sfr

U.S. Nuclear Regulatory Commission ND-18-1545 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. J.B. Klecha Mr. G. Chick Mr. M. J. Yox Mr. A. S. Parton Ms. A. L. Pugh Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros

U.S. Nuclear Regulatory Commission ND-18-1545 Page 3 of 3 Westinghouse Electric Company, LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J.E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W.R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-18-1545 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-1545 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 4 Completion Plan for Uncompleted ITAAC E.3.9.03.00.02 [Index Number 848]

U.S. Nuclear Regulatory Commission ND-18-1545 Enclosure Page 2 of 3 ITAAC Statement Program Commitment 3.2 The means exists for communications from the control room to the NRC headquarters and regional office EOC.

[F.1.f]

Inspections/Tests/Analyses 3.2 A test will be performed of the communications capabilities from the control room, TSC and EOF to the NRC, including EROS.

Acceptance Criteria 3.2 Communications are established from the control room, TSC, and EOF, to the NRC headquarters and regional office EOC. The access port for EADS successfully completed a transfer of data to the NRC Operations Center.

ITAAC Completion Description A test of the Vogtle Electric Generating Plant (VEGP) Unit 4 communications capabilities from the Main Control Room (MCA), Technical Support Center (TSC) and Emergency Operations Facility (EOF) to the NRC, including the Emergency Response Data System (EADS), is performed to demonstrate that communications are established from the MCA, TSC, and EOF to the NRC headquarters and regional office Emergency Operations Center (EOC), and that the access port for EADS successfully completes a transfer of data to the NRC Operations Center.

Communications testing is performed per Procedure XXX (Reference 1). The scope of testing includes the verification of voice transmission and reception from the MCA, TSC, and EOF to the NRC headquarters and regional office EOC; and verification that the access port for EADS successfully completes a transfer of data to the NRC Operations Center. Included in the testing is verification that dedicated Emergency Notification System (ENS) lines are located in the MCA, TSC, and EOF and functional, and that dedicated Health Physics Network (HPN) lines are located in the TSC and EOF and functional.

The results of the testing are documented in Reference 1 and confirm that communications are established from the MCA, TSC, and EOF to the NRC headquarters and regional office EOC, and that the access port for EADS successfully completed a transfer of data to the NRC Operations Center.

Reference 1 is available for NRC inspection as part of the Unit 4 ITAAC E.3.9.03.00.02 Completion Package (Reference 2).

U.S. Nuclear Regulatory Commission ND-18-1545 Enclosure Page 3 of 3 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References (available for NRC inspection)

1. Procedure XXX, Unit 4 Emergency Response NRC Communications Test
2. E.3.9.03.00.02-U4-CP-Rev o, ITAAC Completion Package
3. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"