Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML18190A176 | 3 July 2018 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection |
IR 05000293/2015008 | 21 December 2015 | IR 05000293/2015008, 11/02/2015 - 11/19/2015, Pilgrim Nuclear Power Station, Triennial Fire Protection Inspection |
ML15358A042 | 17 December 2015 | Third Six-Month Status Report, Phase 2 Overall Integrated Plan, and Responses to Phase 1 Interim Staff Evaluation Open Items in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents. |
ML15197A270 | 16 July 2015 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information |
IR 05000293/2014003 | 11 August 2014 | IR 05000293-14-003 and ISFSI Report 07201044-14-002; 04/01/2014 - 06/30/2014; Pilgrim Nuclear Power Station (Pilgrim); Maintenance Risk Assessments and Emergent Work Control and Operability Determinations and Functionality Assessments |
ML14188B731 | 30 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML14171A200 | 26 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) |
IR 05000293/2013009 | 12 December 2013 | IR 05000293-13-009; 11/4/13 to 11/21/13; Pilgrim Nuclear Power Station; Engineering Specialist Plant Modifications Inspection |
ML12312A276 | 25 October 2012 | 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System |
ML12205A318 | 23 July 2012 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection |
ML11285A306 | 3 October 2011 | Response to NRC Special Inspection Report 05000293-11-012; Preliminary White Finding |
ML100541604 | 3 February 2010 | Request for Exemption from 10 CFR 50 Appendix R Section III.L.2.b, Performance Goal for Satisfying the Reactor Coolant Make-Up Function |
ML093510022 | 8 December 2009 | Response to NRC RAI for Exemption to Allow Hot Shutdown Manual Actions |
ML101380629 | 8 December 2009 | Response to NRC RAI for Exemption to Allow Hot Shutdown Manual Actions |
ML093350533 | 23 November 2009 | Request for Time Extension to Respond to NRC RAI for Exemption to Allow Hot Shutdown Manual Actions |
ML092950526 | 23 October 2009 | Request for Additional Information for Exemption to Allow Hot Shutdown Manual Actions |
ML110700157 | 6 March 2009 | E-mail from M. Vaaler, NRR to A. Howe, NRR Et Al. on Plants Submitting Fire Protection OMA Exemption Requests to Extend Enforcement Discretion |
ML110700158 | 6 March 2009 | E-mail from M. Vaaler, NRR to T. Boyce, NRR on Draft E-mail to Management Regarding OMA Exemptions |
ML090690690 | 6 March 2009 | Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 to Allow Hot Shutdown Manual Operator Actions |
IR 05000293/2002007 | 27 January 2003 | IR 05000293-02-007, on 09/19/2002-12/28/2002, Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station, Maintenance Risk Assessment and Emergent Work Control, Post-Maintenance Testing and Surveillance Testing |