Acceptance Letter Westinghouse WCAP-16996-PNP, Revision 1, Supplement 3, Revision 0, Extension of Full Spectrum LOCA (Fsloca) Evaluation Methodology to Perform Analysis of High Burnup Fuel
ML26063A290
Person / Time
Site: Westinghouse
Issue date: 03/09/2026
From: Damaris Marcano
Licensing Processes Branch
To: Ewing J
Westinghouse
References
EPID L-2025-TOP-0044, WCAP-16996-PNP, Rev. 0
Download: ML26063A290 (0)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 9, 2026 Mr. Jerrod Ewing Manager, Operating Plants Licensing Westinghouse Electric Company 1000 Westinghouse Drive, Building 1 Cranberry Township, PA 16066

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION ACCEPTANCE REVIEW FOR THE WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-16996-P/NP, REVISION 1, SUPPLEMENT 3, REVISION 0, EXTENSION OF FULL SPECTRUM LOCA (FSLOCA) EVALUATION METHODOLOGY TO PERFORM ANALYSIS OF HIGH BURNUP FUEL (PROPRIETARY/

NON-PROPRIETARY) (EPID: L-2025-TOP-0044)

Dear Mr. Ewing:

By letter dated December 29, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25363A148), Westinghouse Electric Company (Westinghouse) submitted Topical Report (TR) WCAP-16996-P/NP, Revision 1, Supplement 3, Revision 0, Extension of FULL SPECTRUM LOCA (FSLOCA) Evaluation Methodology to Perform Analysis of High Burnup Fuel (Proprietary/Non-Proprietary), for the U.S. Nuclear Regulatory Commission (NRC) staffs review and approval.

The NRC staff has found that the TR contains sufficient information to begin its detailed technical safety review. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

NOTICE: Enclosure to this letter contains Proprietary Information. Upon separation from Enclosure, this letter is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION The estimated review schedule milestones are provided in the table below:

Milestone Planned Date NRC to Issue Requests for Additional Information (RAIs)

August 18, 2026 Westinghouse to Submit Responses to RAIs October 16, 2026 NRC to Issue Draft Safety Evaluation (SE)

January 29, 2027 Draft SE Proprietary Review Completed by Westinghouse February 26, 2027 NRC to Issue Final SE May 3, 2027 Westinghouse to Submit TR Approved Version (-A)

June 3, 2027 NRC to Issue Verification June 29, 2027 This schedule takes into consideration the NRCs current review priorities and available technical resources which may be subject to change. If modifications to these dates are deemed necessary, we will provide revisions/updates to this information. To support a more efficient review process, the NRC is setting a goal of a 15 percent improvement in timeliness and resources. Accordingly, our estimate for this review is 1020 hours0.0118 days <br />0.283 hours <br />0.00169 weeks <br />3.8811e-4 months <br /> total review time including project management time within a 15-month review timeframe (based on the best estimate of 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> and an 18-month schedule).

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date of significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. The review schedule milestones and estimated review costs were discussed and agreed upon between Nathaniel Mackereth, Westinghouse, and the NRC staff on March 4, 2026.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TRs are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, the NRC staff hours will be billed accordingly.

If you have any questions regarding this matter, please contact Ekaterina Lenning at 301-415-3151 or via email at Ekaterina.Lenning@nrc.gov Sincerely,

/RA/

Damaris Marcano, Branch Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902038

OFFICIAL USE ONLY - PROPRIETARY INFORMATION J. Ewing OFFICIAL USE ONLY - PROPRIETARY INFORMATION

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION ACCEPTANCE REVIEW FOR THE WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-16996-P/NP, REVISION 1, SUPPLEMENT 3, REVISION 0, EXTENSION OF FULL SPECTRUM LOCA (FSLOCA) EVALUATION METHODOLOGY TO PERFORM ANALYSIS OF HIGH BURNUP FUEL (PROPRIETARY/

NON-PROPRIETARY) (EPID: L-2025-TOP-0044) DATED MARCH 9, 2026 DISTRIBUTION:

PUBLIC (Letter Only)

NONPUBLIC (Enclosure)

RidsOgcMailCenter RidsACRS_MailCTR RidsNrrDorl RidsNrrDorlLlpb RidsNrrLADHarrison DMarcano, NRR ELenning, NRR RidsNrrDss RidsNrrDssSfnb SKrepel, NRR JLehning, NRR BWise, NRR KHeller, NRR RFu, NRR ADAMS Accession Nos.:

ML26062A106 (Package)

ML26063A290 (Letter)

ML26063A292 (Proprietary Enclosure) e-Concurrence case 20260304-60031