ML26045A160
| ML26045A160 | |
| Person / Time | |
|---|---|
| Site: | 05000614 |
| Issue date: | 01/24/2025 |
| From: | NRC |
| To: | |
| References | |
| Download: ML26045A160 (0) | |
Text
From:
Adrian Muniz Sent:
Friday, January 24, 2025 11:23 AM To:
ext_Jessica_Maddocks
Subject:
Completeness determination - X-energy's Graphite Core Assembly Material Qualification and Design Methodologies (Revision 1)
Topical Report Attachments:
NRC 898 - Completeness Determination of X-energy Graphite Core Assembly Material Qualification and Design Methodologies Topical Report.pdf
- Jessica, Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for X-energys Graphite Core Assembly Material Qualification and Design Methodologies (Revision 1) topical report. The NRC staff determined that it provided sufficient information for the NRC staff to begin a detailed technical review.
As discussed, the NRC staff plans to issue its draft safety evaluation by November 5, 2025. If needed, the NRC staff will issue a request for additional information (RAI) by June 27, 2025, with a request for X-energy to provide a response within 30 days. The NRC staff estimates that 1,340 staff hours will be needed to complete the technical review and issue the safety evaluation. The schedule and level of effort could change due to several factors (e.g., the need for additional RAIs, unanticipated changes to the scope of the review, and unsolicited supplements to the topical report). The NRC staff will communicate any significant changes to the review schedule or estimated staff hours, including the reason(s) for the changes.
If you have any questions, please feel free to contact me at 301-415-4093 or by email at Adrian.Muniz@nrc.gov.
Project No.: 99902071 EPID: L-2024-TOP-0032
- Regards, Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 (UAL2)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Hearing Identifier:
XeDOW_ProjectLongMott_SafPublic Email Number:
161 Mail Envelope Properties (CO6PR09MB7512CB634AB95C0F8E65C33C8FE32)
Subject:
Completeness determination - X-energy's Graphite Core Assembly Material Qualification and Design Methodologies (Revision 1) Topical Report Sent Date:
1/24/2025 11:23:07 AM Received Date:
1/24/2025 10:49:00 AM From:
Adrian Muniz Created By:
Adrian.Muniz@nrc.gov Recipients:
"ext_Jessica_Maddocks" <>
Tracking Status: None Post Office:
CO6PR09MB7512.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1468 1/24/2025 10:49:00 AM NRC 898 - Completeness Determination of X-energy Graphite Core Assembly Material Qualification and Design Methodologies Topical Report.pdf 1364486 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
NRC FORM 898 (01-2021)
Topical Report Completeness Determination U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 898 (01-2021)
Page 1 of 1 Topical Report Information 009380 Report Number:
Graphite Core Assembly Material Qualification and Design Methodologies, Revision 1
Title:
ML24306A125 ADAMS Accession Number:
L-2024-TOP-0032 EPID:
99902071 Docket Number:
Review Information NRR/DANU/UAL2 NRR/DANU/UTB1 Office/Division/
Branch:
Adrian Muniz Ondra Dukes Project Manager:
M. Audrain, M. Gordon, J. Bass, C. Song, V.
Voltaggio, I. Jung, T. Drzewiecki Reviewers:
Review Type:
Standard Compressed ADAMS Accession Numbers (Top row is for transmittal of this form) 25013A232 Package: ML25013A263 E-mail: ML25013A233 This Form: ML Ongoing Withholding Determination: ML N/A Fee Waiver: ML Topical Reports for Review
The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.
Information for Topical Reports That Are Found Acceptable for Review 06/27/2025 Issue Dates For Requests for Additional Information:
11/05/2025 Issue Dates For Draft Safety Evaluation:
1340 Review hours total includes project management and contractor time:
Topical Reports Not Acceptable for Review Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.
[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.
N/A Basis for Nonacceptance:
N/A Additional Information Needed:
Approvals Technical Branch Chief Projects Branch Chief PAUL OBERSON Digitally signed by PAUL OBERSON Date: 2025.01.13 15:14:22 -05'00' John P. Segala Digitally signed by John P. Segala Date: 2025.01.21 15:29:43 -05'00'