ML25013A263

From kanterella
Jump to navigation Jump to search

Email to X-energy Transmitting Completeness Determination - Graphite Core Assembly Material Qualification and Design Methodologies Topical Report
ML25013A263
Person / Time
Site: 99902071
Issue date: 01/24/2025
From: Adrian Muniz
NRC/NRR/DANU
To: Maddocks J
X-Energy
References
EPID L-2024-TOP-0032
Download: ML25013A263 (1)


Text

From:

Adrian Muniz To:

Jessica Maddocks

Subject:

Completeness determination - X-energy"s Graphite Core Assembly Material Qualification and Design Methodologies (Revision 1) Topical Report Date:

Friday, January 24, 2025 10:49:00 AM Attachments:

NRC 898 - Completeness Determination of X-energy Graphite Core Assembly Material Qualification and Design Methodologies Topical Report.pdf

Jessica,

Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for X-energys Graphite Core Assembly Material Qualification and Design Methodologies (Revision 1) topical report. The NRC staff determined that it provided sufficient information for the NRC staff to begin a detailed technical review.

As discussed, the NRC staff plans to issue its draft safety evaluation by November 5, 2025. If needed, the NRC staff will issue a request for additional information (RAI) by June 27, 2025, with a request for X-energy to provide a response within 30 days. The NRC staff estimates that 1,340 staff hours will be needed to complete the technical review and issue the safety evaluation. The schedule and level of effort could change due to several factors (e.g., the need for additional RAIs, unanticipated changes to the scope of the review, and unsolicited supplements to the topical report). The NRC staff will communicate any significant changes to the review schedule or estimated staff hours, including the reason(s) for the changes.

If you have any questions, please feel free to contact me at 301-415-4093 or by email at Adrian.Muniz@nrc.gov.

Project No.: 99902071 EPID: L-2024-TOP-0032

Regards,

Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 (UAL2)

Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)