ML26045A072

From kanterella
Jump to navigation Jump to search
Project Long Mott Docs - Completeness Determination - X-energys Training Programs Methodology Topical Report
ML26045A072
Person / Time
Site: 05000614
Issue date: 04/24/2024
From:
NRC
To:
References
Download: ML26045A072 (0)


Text

From:

Adrian Muniz Sent:

Wednesday, April 24, 2024 3:58 PM To:

ext_Jessica_Maddocks Cc:

'Maggie Staiger'

Subject:

Completeness determination - X-energy's Training Programs Methodology Topical Report Attachments:

NRC Form 898 Topical Report Completeness Determination - X-energy Training Programs Topical Report.pdf

Jessica, Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for X-energys Training Programs Methodology topical report. The NRC staff determined that it provided sufficient information for the NRC staff to begin a detailed technical review.

As discussed, the NRC staff plans to issue its draft safety evaluation by April 15, 2025. If needed, the NRC staff will issue a request for additional information (RAI) by November 4, 2024, with a request for X-energy to provide a response within 30 days. The NRC staff estimates that 250 staff hours will be needed to complete the technical review and issue the safety evaluation. The schedule and level of effort could change due to several factors (e.g., the need for additional RAIs, unanticipated changes to the scope of the review, and unsolicited supplements to the topical report). The NRC staff will communicate any significant changes to the review schedule or estimated staff hours, including the reason(s) for the changes.

If you have any questions, please feel free to contact me at 301-415-4093 or by email at Adrian.Muniz@nrc.gov.

Project No.: 99902071 EPID: L-2024-TOP-0008

Regards, Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 (UAL2)

Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)

Hearing Identifier:

XeDOW_ProjectLongMott_SafPublic Email Number:

89 Mail Envelope Properties (CO6PR09MB7512E63CB099FF39FED62EEB8F102)

Subject:

Completeness determination - X-energy's Training Programs Methodology Topical Report Sent Date:

4/24/2024 3:57:43 PM Received Date:

4/24/2024 3:57:00 PM From:

Adrian Muniz Created By:

Adrian.Muniz@nrc.gov Recipients:

"'Maggie Staiger'" <mstaiger@x-energy.com>

Tracking Status: None "ext_Jessica_Maddocks" <>

Tracking Status: None Post Office:

CO6PR09MB7512.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1413 4/24/2024 3:57:00 PM NRC Form 898 Topical Report Completeness Determination - X-energy Training Programs Topical Report.pdf 2171764 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

NRC FORM 898 (01-2021)

Topical Report Completeness Determination U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 898 (01-2021)

Page 1 of 1 Topical Report Information Report Number:

006012

Title:

Xe-100 Training Programs Methodology Topical Report, Revision 3.

ADAMS Accession Number:

ML24089A243 EPID:

L-2024-TOP-0008 Docket Number:

99902071 Review Information Office/Division/

Branch:

NRR/DANU/UAL2 NRR/DRO/IOLB NRR/DANU/UTB1 Project Manager:

Adrian Muniz Reviewers:

Jeff Correll, Maurin Scheetz, Jing Xing, Ian Jung Review Type:

Standard

Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)

Package: ML24115A161 E-mail: ML24115A182 This Form: ML24115A181 Withholding Determination: ML Fee Waiver: ML Topical Reports for Review

The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.

Information for Topical Reports That Are Found Acceptable for Review Issue Dates For Requests for Additional Information: November 4, 2024 Issue Dates For Draft Safety Evaluation: April 15, 2025 Review hours total includes project management and contractor time:

250 Topical Reports Not Acceptable for Review Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.

[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.

Basis for Nonacceptance:

Additional Information Needed:

Approvals Technical Branch Chief Projects Branch Chief Lauren A. Nist Digitally signed by Lauren A. Nist Date: 2024.04.24 14:53:46 -04'00' Michael J. Wentzel Digitally signed by Michael J. Wentzel Date: 2024.04.24 15:40:39 -04'00'