TRISO-X, LLC, Fuel Fabrication Facility Special Nuclear Material License Application Cover Page, Chapter Index, Abbreviations, and Acronyms, Revision 4
ML25353A614
Person / Time
Site: Triso-X
Issue date: 12/19/2025
From:
Triso-X
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML25353A611 List:
References
TX0-REG-LTR-0101
Download: ML25353A614 (0)


Text

TXF-REG-NRC-0000 Revision 4 December 2025 Page i TRISO-X Fuel Fabrication Facility Special Nuclear Material License Application Cover Page, Chapter Index, Abbreviations, and Acronyms Revision

4 Status
Approved NRC Docket No.
70-7027

TXF-REG-NRC-0000 Revision 4 December 2025 Page ii SPECIAL NUCLEAR MATERIAL LICENSE CHAPTER INDEX CHAPTER TITLE REVISION REVISION DATE 1

General Information 4

December 2025 2

Organization and Administration 3

December 2025 3

Integrated Safety Analysis 3

December 2025 4

Radiation Safety 3

December 2025 5

Nuclear Criticality Safety 3

December 2025 6

Chemical Process Safety 2

December 2024 7

Fire Safety 2

December 2024 8

Emergency Management 2

December 2024 9

Environmental Safety 3

December 2025 10 Decommissioning 2

December 2024 11 Management Measures 3

December 2025 12 Material Control and Accounting of Special Nuclear Material 2

December 2024 13 Protection of Special Nuclear Material 2

December 2024 Addendum Sensitive Information 2

December 2024

TXF-REG-NRC-0000 Revision 4 December 2025 Page iii REVISION

SUMMARY

Revision Date Section/Page Description of Change 1

5-Apr-22 ALL Initial issue.

2 4-Nov-22 Chapter Index Updated License Chapter 1 to Revision 2.

3 Dec-24 ALL Added document number TXF-REG-NRC-0000 to header.

Chapter Index Updated License Chapter 1 to Revision 3, and all other Chapters to Revision

2.

Revision Summary Deleted revision summary entries for Revision 2 on this page because all were added to the License Chapter 1 revision summary.

4 Dec-25 Chapter Index Updated License Chapter 1 to Revision 4.

Updated License Chapters 2, 3, 4, 5, 9, and 11 to Revision 3.

TXF-REG-NRC-0000 Revision 4 December 2025 Page iv ABBREVIATIONS AND ACRONYMS This list contains the abbreviations and acronyms used in this document.

Abbreviation or Acronym Definition ALARA As Low As Reasonably Achievable ALI Annual Limit on Intake AHJ Authority Having Jurisdiction ANS American Nuclear Society ANSI American National Standards Institute ASCE American Society of Civil Engineers BDC Baseline Design Criteria BS/BA Bachelor of Science / Bachelor of Arts CAA Controlled Access Area CAAS Criticality Accident Alarm System CEDE Cumulative Effective Dose Equivalent CFR Code of Federal Regulations CM Configuration Management DAC Derived Air Concentration DFP Decommissioning Funding Plan DOE U.S. Department of Energy DOT U.S. Department of Transportation EPA U.S. Environmental Protection Agency ETSZ East Tennessee Seismic Zone FFF Fuel Fabrication Facility FHA Fire Hazards Analyses FNMCP Fundamental Nuclear Material Control Plan HALEU High Assay Low Enriched Uranium HPGe High Purity Germanium IAEA International Atomic Energy Agency IBC International Building Code ICPMS Inductively Coupled Plasma Mass Spectrometry ICRP International Commission on Radiation Protection Publication ISA Integrated Safety Analysis IROFS Items Relied On For Safety KPA Kinetic Phosphorescence Analyzer LA License Application LEU Low Enriched Uranium MBA Material Balance Area

TXF-REG-NRC-0000 Revision 4 December 2025 Page v Abbreviation or Acronym Definition MC&A Material Control and Accountability MMI Modified Mercalli Intensity MOU Memorandum of Understanding NCRP National Commission on Radiation Protection NCS Nuclear Criticality Safety NFPA National Fire Protection Association NIST National Institute of Standards and Technology NMSS Nuclear Materials Safety and Safeguards NRC U.S. Nuclear Regulatory Commission OCA Owner Controlled Area OJT On-the-Job Training OSHA Occupational Safety and Health Administration PHA Process Hazard Analyses PM Preventive maintenance PSP Physical Security Plan QA Quality Assurance RCA Radiologically Controlled Area REM Roentgen Equivalent Man RPP Radiation Protection Program RSO Radiation Safety Officer RWP Radiation Work Permits SEP Site Emergency Plan SME Subject Matter Expert SNM Special Nuclear Material SRC Safety Review Committee TEDE Total Effective Dose Equivalent TRISO-X FFF TRISO-X Fuel Fabrication Facility U

Uranium U-235 Uranium-235 U-238 Uranium-238 UL Underwriters Laboratory USGS United States Geological Survey

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-1 GENERAL INFORMATION Table of Contents SECTION TITLE STARTS ON PAGE 1.1 1.1.1 1.1.1.1 1.1.1.2 1.1.1.3 1.1.1.4 1.1.2 1.1.3 1.1.4 Facility and Process Information Site Description and Location Population, Nearby Land Uses, and Transportation Meteorology Hydrology Geology Facility Buildings and Structures General Process Description Raw Materials, Products, By-Products and Wastes 1-2 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 Institutional Information Corporate Identity U.S. Nuclear Regulatory Commission License Information Financial Qualifications Type, Quantity, and Form of Licensed Material Authorized Uses and Activities Site Safeguards Terminology / Definitions 1-16 1.3 1.3.1 1.3.1.1 1.3.1.2 1.3.1.3 1.3.1.4 1.3.1.5 1.3.1.6 1.3.2 1.3.2.1 1.3.2.2 Special Exemptions and Special Authorizations Special Exemptions Criticality Monitoring Posting and Labeling ICRP-68 DAC and ALI Values ICRP-60 Organ Dose Weighting Factors Certain Unplanned Contamination Events Process Buildings Special Authorizations Changes to the License Application Release for Unrestricted Use 1-21

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-2 GENERAL INFORMATION 1.1 Facility and Process Information The primary purpose of the TRISO-X Fuel Fabrication Facility (FFF) in Oak Ridge, Tennessee, is to manufacture coated particle fuel for the next generation of commercial nuclear reactors. The modular design of the process cells / areas anticipates additional manufacturing capabilities to satisfy the needs of a variety of fuel designs and reactors (e.g., pebble bed high temperature gas-cooled, prismatic gas-cooled, molten salt-cooled, accident tolerant fuel, nuclear thermal propulsion, and others). Nuclear materials enriched to less than 20 weight percent U-235 are utilized in the product manufacturing operations authorized by this license.

1.1.1 Site Description and Location The TRISO-X site is located in the Horizon Center Industrial Park on property abutting portions of Renovare Boulevard, within the western limits of the City of Oak Ridge and in the northeastern portion of Roane County, Tennessee. The site is situated in an area dedicated and zoned for industrial development, on an approximately 110-acre greenfield site. Of the total acreage, approximately 60 acres are designated for manufacturing and administrative buildings, equipment yards, access roads, parking, and stormwater management. The site is situated at approximately latitude N 35° 57 41 and longitude W 84° 22 13.

The site location in northeastern Roane County is in the Valley and Ridge physiographic province.

The regional topography near the site is typical of the Valley and Ridge province which is characterized by northeast-southwest trending ridges and intervening valleys. The site and other developed areas along State Route 95 (TN 95 - Oak Ridge Turnpike) to the northeast and southwest are located on relatively flat or slightly undulating terrain associated with the East Fork Poplar Creek Valley, while just northwest of the site, there is a steep incline to the top of Black Oak Ridge. Several other ridges oriented northeast to southwest are present within the vicinity of the site. The Poplar Creek Valley is the next valley north and parallels Black Oak Ridge. East Fork Ridge is located to the south and east of the site and is interrupted by the valley of Bear Creek and TN 95. Pine Ridge is located south and east of East Fork Ridge.

1.1.1.1 Population, Nearby Land Uses, and Transportation A site location map, including the population centers located near the site, is shown in Figure 1-

1. Key features near the site are shown in Figure 1-2. The closest major population center is the City of Oak Ridge which had a population of 31,402 as of April 1, 2020, per the United States Census Bureau website. The closest residents to the site are located in a residential development off Poplar Creek Road, approximately 0.6 miles northwest of the site boundary, separated from the site by Black Oak Ridge and areas of dense vegetation. There are also residential neighborhoods located to the east off TN 95, approximately 1.3 miles or more from the site. The Environmental Report, Figures 3.10.1-1 through 3.10.1-4, provides more information about

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-3 population near the site. The North Boundary Greenway, a low-density recreational trail used for hiking and biking, borders the site boundary to the northwest.

The immediate area surrounding the site consists of rural wooded area and light commercial and industrial use buildings. The immediately adjacent one-story warehouse/office building located near the southern corner of the property is the corporate office of Philotechnics Inc., a radiological service and mixed and radioactive waste brokerage provider licensed by the State of Tennessee, does not manage, utilize, or store chemicals (hazardous materials) in quantities that pose hazards to the TRISO-X site. Renovare Boulevard, which borders the site to the southeast, is a two-lane divided roadway that provides access to the site and to other parcels within the Horizon Center Industrial Park.

Lands adjacent to the industrial park are predominantly undeveloped and forested, consisting of large tracts of U.S Department of Energy Oak Ridge Reservation land which border the site to the northwest and surround the industrial park in other directions, with the exception of the TN 95 roadway corridor to the east. The existing land use within one mile of the site consists of primarily industrial development and woodlands. Within a five-mile radius of the site, approximately 83 percent of the land is undeveloped (e.g., forest, pasture, wetland) and the remainder is developed. Other land uses within 5 miles of the site include heavy industrial, light industrial/manufacturing, commercial/office space, agricultural, and residential. The Methodist Medical Center of Oak Ridge is the nearest hospital, located approximately 9 miles from the site.

The closest school to the site is Dyllis Springs Elementary School, located approximately 3.2 miles northeast of the site.

Transportation infrastructure near the site includes Renovare Boulevard; TN 95; two interstate highways - Interstate 40 and Interstate 75 - several Tennessee state highways; and local roads.

Regional highways and interstates near the site are shown in Figure 1-3. The McGhee Tyson Airport, which serves public and military needs, is located 26 miles from Oak Ridge by road. Oliver Springs Airport is a small private airport located 6 miles northeast of the site. The closest railroad track is approximately 1 mile southwest of the site boundary, adjacent to Blair Road. The closest major waterway, the Clinch River, is approximately 3 miles west of the site boundary. Shipping of materials and products to and from the site will be conducted by truck; no use of railroad or river barge is planned. Truck shipments would likely use Interstate 40 and State Route 58 west of the site due to the ease of access via 4-lane highways located in less populated areas with less traffic.

1.1.1.2 Meteorology Oak Ridge is located in the broad Tennessee River valley between the Cumberland Mountains, which lie to the northwest, and the Great Smoky Mountains, to the southeast. The Cumberland Mountains moderate the local climate by retarding the flow of cold air from the north during winter. Both mountain ranges are generally oriented in a northeast-southwest direction. The

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-4 valley between them is corrugated by broken ridges approximately 300 to 500 feet high and oriented parallel to the main valley in an approximate northeast-southwest direction.

The climate of Oak Ridge is classified as humid subtropical. The subtropical designation indicates that the region experiences a wide range of seasonal temperatures. Such areas are typified by significant temperature differences between summer and winter. The normal liquid equivalent annual precipitation in the Oak Ridge area is 50.91 inches, and the average annual snowfall is 5.9 inches. The normal daily minimum temperature in January is 28.9 degrees Fahrenheit (°F) and the normal daily maximum temperature in July is 88.4°F.

Direct deflection of the winds by terrain is a dominant mechanism that drives the winds in the Tennessee River valley. This mechanism acts approximately 50 - 60 percent of the time, resulting in winds that blow in directions generally along the approximate northeast-southwest axis of the valley. The distribution of prevailing monthly wind directions is bimodal, with winds from the northeast (50 - 60 degrees), or from the southwest (210 - 220 degrees). The mean annual wind speed is 2.8 miles per hour.

Severe storm conditions are infrequent in the Oak Ridge area, due to the area being south of most blizzard conditions, and too far inland to be affected by hurricane activity. Tornadoes generally occur more frequently in the western and middle portions of Tennessee; however, Eastern Tennessee experiences tornado outbreaks of varying magnitudes approximately every three to six years. In a four-county area around the site for the period 1950 to 2020, the highest intensity tornadoes were rated F3 as a result of storms on February 21, 1993. Due to the low frequency of tornadoes in this region, no specific design criteria relative to tornadoes are required by the International Building Code. Lightning risk at the site has been addressed through lightning protection systems as specified in the Fire Hazards Analysis as described in Chapter 7.

In accordance with 10 CFR 70.64(a)(2), the most severe documented historical events for the site are listed below for various natural phenomena.

(a) High Wind - The most severe documented wind speed for Roane County is 74 knots (85 miles per hour) per the NOAA NCEI Storm Events Database (1950-2025) for high wind, strong wind, and thunderstorm wind. This event occurred from a thunderstorm on November 10, 2002.

(b) Intense Precipitation - The most severe documented intense precipitation for Roane County is 7.48 inches in a 24-hour period with 3.43 inches in a 1-hour period. Per the Environmental Report Section 3.6.1.4.5, this event was recorded by the NOAA Atmospheric Turbulence and Diffusion Division (ATTD) in Oak Ridge and occurred from thunderstorms on August 10, 1960.

(c) Temperature Extremes - The most severe documented minimum and maximum dry bulb temperatures for the area are -24 °F and 108 °F per the Environmental Report Table 3.6-

21. The low temperature of -24 °F was recorded at the Knoxville airport weather station

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-5 on January 21, 1985 (NOAA NCEI). The high temperature of 108 °F was recorded at the Loudon 1 E weather station on July 29, 1930 (NOAA NCEI).

(d) Lightning and Thunderstorm - Quantifying the most severe documented historical lightning event is not straightforward, therefore an average number of cloud to ground lightning strikes per square mile per year is provided based on an EPRI estimation method available in the Environmental Report Section 3.6.1.4.1.3. The frequency of lightning strikes to ground per square mile per year is 15.1 for the TRISO-X site and surrounding area. This is based on the average number of thunderstorm days per year of 48.8 (NOAA NCEI). The most severe documented number of thunderstorm days per year occurred in 2012 with 65 thunderstorm days per the ORNL metweb website and Environmental Report Section 3.6.1.4.1.3.

(e) Ice and Snowstorm - The most severe documented historical 24-hr snowfall is 12 inches, which occurred in March of 1960 per NOAA NCEI and the Environmental Report Section 3.6.1.4.2. Ice or freezing rain occurs relatively infrequently on an average of 1 day per year per ORNL meteorological data and the Environmental Report Section 3.6.1.4.2.

1.1.1.3 Hydrology The site is categorized as upland; no water bodies or wetlands were identified within the site.

The nearest water body to the site is East Fork Poplar Creek, the closest portions of which run in a southwest direction through the industrial park between TN 95 and Renovare Boulevard at an approximate elevation of less than 770 feet. East Fork Poplar Creek empties into Poplar Creek approximately 1.25 miles southwest of the site, and Poplar Creek empties into the Clinch River approximately 3 miles southwest of the site boundary.

Federal Emergency Management Agency Flood Insurance Rate Map Number 47145C0130F, Panel 0130F, Roane County, Tennessee, and Incorporated Areas, Effective Date September 28, 2007, shows the site outside the 500-year floodplain (unshaded Zone X). The nearest section of detailed study for East Fork Poplar Creek is approximately 1.5 miles northeast of the site, with a 100-year base flood elevation of 783 feet at the downstream end of mapping. The closest Clinch River location to the site has a 100-year base flood elevation of 747 feet at the Poplar Creek outlet.

The nearest portion of the East Fork Poplar Creek to the TRISO-X site is 2.2 miles upstream of Poplar Creek. The 500-yr flood elevation at this location is El. 762.3 (ER Figure 3.4.3-2), which is more than 48 feet below the TX-1 and TX-2 process floors at El. 811. Further review of the 1991 TVA Study referenced in the Environmental Report indicates the 100,000-yr flood elevation for the area of the East Fork Poplar Creek nearest the TRISO-X site (between 1.66 and 3.32 miles upstream of Poplar Creek) is El. 780.4. Therefore, the TX-1 and TX-2 process floors at El. 811 are more than 30 feet above the 100,000-year flood elevation for the East Fork Poplar Creek.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-6 Four groundwater observation wells were installed on the site in fall of 2021 with total depths and screened intervals based on observed first water identified in the upper most bedrock during drilling. No water was identified in the shallow unconsolidated surficial sediments above the bedrock. Total well depths range from approximately 39 feet to 75 feet below ground surface.

The underlying bedrock in which the observation wells are completed is primarily comprised of dolomite and is the first type of bedrock encountered at all sites.

Depth to groundwater measurements taken at the four observation wells vary from approximately 10 to 57 feet below the top of the well casing. Groundwater elevation measurements and modeling indicate that groundwater generally flows in a southwest direction toward East Fork Poplar Creek. Based on a search of several database sources, there are no known household, public, or industrial users of groundwater downgradient of the site for the 3-mile distance that East Fork Poplar Creek travels to empty into the Clinch River. The closest well to the site is a residential well located upgradient, 1-mile north-northwest of the site, within the Poplar Creek Valley which is separated from the site by Blackoak Ridge.

Stormwater discharges from all onsite detention basins are permitted by the state of Tennessee under the NPDES Stormwater Multi Sector permitting program for discharges from industrial facilities. As part of the permit program, the state of Tennessee defines minimum general site maintenance and housekeeping practices and establishes water quality basin discharge outfall requirements for discharges leaving the site.

Stormwater collected during normal operations would contain pollutants typically associated with runoff collected from public streets and parking areas. Small amounts of oil and grease, metals, and other constituents associated with vehicular activity are expected to be carried in runoff from the roads and parking areas within the site. Water quality of stormwater runoff is maintained through the use of detention ponds. Stormwater generated is collected in peripheral ditches and the interior stormwater system before being discharged to the stormwater detention basin. The detention basin is divided into two separate sections, the forebay section and the main detention basin section. The forebay section collects the runoff from the entire permanent site areas and provides storage for a portion of the runoff for water quality treatment that allows sediment and site generated total suspended solids (TSS) to settle at the bottom of the forebay.

The main detention basin section receives stormwater overflow from the forebay section and provides additional storage for the remaining stormwater volume to allow for TSS to settle at the bottom of the detention basin section. Treated water effluent is discharged via the valved NW Outlet pipe into an existing drainage swale that traverses at least 400 feet through a vegetated path to an observed sinkhole feature in the adjacent parcel. The intent of the detention basin design is not to overwhelm the sinkhole area by limiting the post-developed volume to less than the pre-developed volume within the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of a rainfall event. As such, all constituents within stormwater runoff are expected to be at or below the allowable limits set by the state of Tennessee. Any stormwater runoff from electrical transformers, mechanical yards and above ground tank containments is collected separately and disposed of after adequate treatment.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-7 Groundwater hydraulic gradients are based on potentiometric level contours of water levels collected on September 16, 2021, and January 12, 2022, and are shown on Figures 1-9 and 1-10, respectively. These two months were selected for their seasonal influence (summer and winter) on potentiometric levels, as it is apparent that lower evapotranspiration levels during colder shorter days (i.e., decreases naturally as vegetation is dormant, and less need of infiltrating water) influences groundwater availability. The interpreted flow paths, perpendicular to contours, indicate groundwater flows from north of the site in a predominantly southeastern direction toward East Fork Poplar Creek and is consistent in summer and winter. The groundwater flow paths do not indicate flow toward any potential groundwater users.

1.1.1.4 Geology The TRISO-X site is located within the Valley and Ridge Province, a long, narrow belt trending northeast to southwest that is bordered on the west by the Appalachian Plateau and on the east by the Blue Ridge Province. The province is expansive and extends from Vermont to Alabama.

This physiographic province consists of a series of northeast/-southwest-trending synclines and anticlines composed of Early Paleozoic sedimentary rocks. Drainage patterns in the Valley and Ridge Province generally follow the northeast-southwest trend of topography. However, segments of major rivers cut across the regional topographic alignment following deeply entrenched, ancient stream courses. These include the Powell, Clinch, Holston, and French Broad rivers that join to form the Tennessee River after flowing many miles in northeast/southwest-trending valleys.

The Rome Formation and the Conasauga, Knox, and Chickamauga Groups and associated formations comprise the majority of the underlying bedrock of the Valley and Ridge Province.

The site is underlain by limestones-dolomites of the Knox Group and limestones with interbedded shale, argillaceous limestone, mudstone, and wackestone associated with the Chickamauga Group.

Site Topography The terrain within the Horizon Center Site (HCS) boundaries is typical of the Oak Ridge region and generally contains mild rolling hills with ridges and valleys. The existing site surface elevations vary from approximately Elevation 780 feet to Elevation 825 feet in most parts of the HCS, except at the north corner where the existing surface elevation rises to approximately 850 feet. More detailed topography descriptions are included in Section 3.3 of the Environmental Report.

The site development for the project will include extensive site grading with cut and fill.

Engineered fill will be used for placement and compaction. The final site grade will be relatively level across the site with most boundaries matching the existing surrounding topography. The only significant slope for the site is on the north side of the facility, separated from the primary facility structures and equipment by a perimeter access road. This slope will be designed with a grade of approximately 3:1 (Horizontal:Vertical) after excavation. The design will be verified by

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-8 a slope stability calculation and designed using standard geotechnical engineering practice. The toe of the north slope is expected to be approximately 75 feet from the edge of the eastern-most process building (PB).

Site Geotechnical Investigations Site-specific geotechnical investigations presented in the Environmental Report, Section 3.3.3.2, indicate the overall subsurface profile consists of clay soils underlain by weathered limestone and dolomite to more competent bedrock at greater depths. The clay overburden is classified as CH or CL per USCS (unified soil classification system) and is considered to have negligible potential of liquefaction. The in-situ medium stiff to very stiff or hard clays are not susceptible to strength degradation during seismic events.

Based on the drilling logs from the construction of groundwater monitoring wells (GW-1 to GW-6), the overburden soil thickness varies from 7 feet to 50 feet. The soil thickness of 50 feet was encountered at GW-1 with the surface elevation at 841.55 feet, which was located on the hill at the north corner of the property boundary. However, the groundwater monitoring wells are located away from the main facilities near the property boundaries. Detailed information about groundwater monitoring wells can be found in Section 3.4.1.2 of the Environmental Report.

Based on the soil boring logs within the footprint of the HCS, the overburden consists of residual clay soils encountered at depths ranging from 3.6 feet to 31.5 feet below the existing ground surface at boring locations. The soil overburden becomes deeper at locations closer to the north and northwest boundaries on the hill side.

Potential for Differential Settlement After site grading cut and fill to establish the final grade, the overburden soil thickness below the final grade is expected to vary generally from less than 5 feet to approximately 25 feet within the footprint of the two PBs. The majority of the PB area, a low-lying area in the middle of the site, will receive fill. Potential settlement in this area will be mitigated with the following measures.

The entire PBs are designed to rest on a large mat foundation to reduce the potential for differential settlement. Furthermore, a geotechnical ground improvement approach using an intermediate foundation system is designed to further minimize the potential for differential settlement from the underlying clay soils. This intermediate foundation type is called a rigid inclusion (RI) system, which primarily consists of cement grout columns being installed down to the top of bedrock across the entire PB area in a grid pattern. The RI elements are similar to a pile foundation, without steel reinforcement. Typically, between the foundation mat and the top of the RI elements there is a layer of compacted granular soil called the load transfer platform (LTP). The LTP, RI elements, and the in-situ soils act as a composite matrix system with overall improved engineering properties to mitigate differential settlements. The large mat foundation

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-9 supported by the RI matrix system will minimize the potential long-term differential settlement of the PB and ensure the safe operation of the proposed facility.

Subsurface Bearing Capacity The subsurface medium stiff to very stiff clay soils discovered by the site-specific geotechnical investigations exhibit adequate bearing capacity for the PB with standard factor of safety against general soil failure based on the preliminary analysis. The primary design concern was the potential for differential settlement produced by the underlying clay soils. As discussed above, the large mat foundation supported by the RI matrix system will minimize the potential for long-term differential settlement of the PB and ensure the safe operation of the proposed facility.

With the use of the RI matrix system, the overall foundation bearing capacity will be improved as well. Detailed information about geology and soils can be found in Section 3.3 of the Environmental Report.

Potential for Karst Features According to the United States Geological Survey (USGS), the region containing the site may contain carbonate rocks that can become karstified. These folded and faulted carbonate rocks are Paleozoic in age and are subject to dissolution that may produce a range of features that include solution, collapse, cover-collapse sinkholes and caves. Karst features previously reported on lands adjacent to the site have included springs and sinkholes of various sizes. While sinkholes are known to occur adjacent to the site, no sinkholes were reported to occur directly on the site.

Based on the topography of the site, several shallow draws and depressions exist on the site which may reveal karst features beneath the surface. Karst features are caused by dissolution of carbonate rocks and deep weathering along prevailing fractures and strike-oriented bedding, creating conduits and voids (open and/or clay-filled). Voids within the dolomite and limestone bedrock were encountered on the site during the geotechnical drilling program to support facility design. Bedrock was encountered during drilling at a minimum depth of 3.6 feet and a maximum depth of 50.0 feet.

In early 2022, a subsurface investigation was performed to support the facility design, which involved 22 geotechnical soil borings (B-1 to B-22) and a surface geophysical investigation. There were 6 borings located within the PB footprint with total boring depths ranging from 30 feet to 100 feet below ground surface (b.g.s.) and rock core total lengths ranging from 22 feet to 100 feet. Voids were encountered during rock coring in most borings within the PB footprint with the vertical dimensions from as thin as 0.2 feet to approximately 2.6 feet. The 2.6 feet opening was at 82 feet deep b.g.s. at one corner of the PB, while the majority of voids were filled with stiff clay and encountered within the upper 25 feet b.g.s.

The surface geophysical investigation performed shear wave seismic refraction tomography (SWSRT) and electrical resistivity tomography (ERT) to map the subsurface bedrock conditions, including possible major void (empty or soil-filled) anomalies associated with karst features. The

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-10 tomography survey lines were over 700 feet long each and spaced at 50 feet to cover the entire PB area. The geophysical findings indicated the same general subsurface profiles as discovered by soil borings, which contained shallow residual stiff overburden underlain by weathered bedrock with higher weathering at upper rock formation and very hard competent rock at greater depths. The geophysical report also identified some anomalies where the ERT results showed high resistivity at deep zones compared to the surrounding rock data, although the shear wave velocity at those deep zones did not show abnormal results.

Further soil boring investigations were performed in June 2022 to focus on the anomaly locations identified in the geophysical work and included 6 borings (B-23 to B28) in the PB footprint. Rock coring of 60 feet to 80 feet were performed to reach those anomaly zones as identified by geophysical investigation and 20 feet to 30 feet beyond (deeper) the anomaly locations. These additional rock coring samples did not find any significant voids at those anomalies.

An additional geotechnical boring subsurface exploration included the advancement of eight geotechnical test borings (B-29 to B-36) at predetermined locations representing the area where the TX-1 buildings (including the Process Building) would be located. Similar to the previous subsurface explorations, voids within the limestone bedrock were encountered within six of the eight borings. Voids ranged from as thin as 0.1 ft. (0.03 m) to as much as 4.7 ft. (1.4 m).

Occurrence of voids were limited to the upper 45 ft. (13.8 m) below ground surface. These voids were found within limestone and limestone interbedded with shale. Detailed information about geology and soils can be found in Section 3.3, and karst is discussed in 3.3.2, of the Environmental Report.

Subsurface Engineering Characteristics The soil layer over bedrock generally consists of medium stiff to very stiff CH and CL clay at depths ranging from 3.6 feet to 18 feet below the existing ground surface within the PB footprint. At a boring location to the south of the PB, the clay was encountered to a depth of 27 feet b.g.s. Based on the 12 geotechnical borings performed in the PB/AB area, the limestone and dolomite bedrock exhibit higher weathering at shallower depth (generally upper 10 feet to 20 feet) and became more competent at greater depths. The rock core recovery ranges from approximately 24% to 100% while Rock Quality Designation (RQD) ranges from 0 to 100%. The lower recovery and RQD were mostly within the upper rock layers. The unconfined compressive strength values of intact rock cores range from 4,500 psi to 19,500 psi, which indicates hard to very hard strength.

The cross sections of subsurface soil/rock profiles are provided in Figures 1-5 through 1-10.

Seismicity The East Tennessee Seismic Zone (ETSZ) is the second most active zone in the eastern United States in terms of small magnitude (M<5) seismicity, second in frequency to the New Madrid seismic zone. Activity in the ETSZ has remained high for several decades with only a few events having magnitudes as large as M 4.6. Generally, earthquakes in the ETSZ produce minor or no

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-11 damage: the largest observed earthquakes have produced only minor damage to buildings, typically chimney collapse, cracks in plaster, and broken windows, consistent with intensity VI on the Modified Mercalli Intensity (MMI) scale.

1.1.2 Facility Buildings and Structures A site plan showing the location and arrangement of buildings is included as Figure 1-4. Security fencing along or near the property boundaries defines the Owner Controlled Area. Five buildings are located on the TRISO-X property: the Security/Emergency Operations Center Building, the Administration Building, two Process Buildings, and the Graphite Matrix Powder (GMP) Building. Additional structures on-site include exhaust stacks, electrical equipment yards, mechanical equipment yards, cooling towers, roads, parking areas, loading docks, storage tanks, and a detention basin.

The Security/Emergency Operations Center Building is located near the main entrance to the property at Renovare Boulevard and serves as the main entry/exit security checkpoint for vehicles and people accessing the property. The Security/Emergency Operations Center Building also serves as the emergency operations center in the event of a site emergency. No radiological material is housed in this building.

The Administration Building is connected to the southwest corner of the Process Building and contains offices, meeting rooms, locker rooms, restrooms, and a break area for employees and authorized visitors. The Administration Building also contains the entry/exit point for workers accessing the radiologically-controlled Process Building. No radiological material is housed in this building.

The two Process Buildings, located at the center of the property, receive special nuclear material (SNM) and ship out final fuel forms (pebbles, compacts, etc.). The Process Buildings house SNM, chemicals, and equipment to support manufacture of coated particle fuel for the next generation of commercial nuclear reactors. The Process Buildings also receive GMP from the GMP Building.

All handling, processing, and storage of SNM occurs in the Process Buildings.

The GMP Building is located southwest of the Process Buildings and is used to prepare GMP from raw materials. GMP is transported from the GMP Building to the Process Buildings to be used in the manufacturing process. No radiological material is housed in this Building.

Additional layout descriptions for the buildings and structures on-site are available in the ISA Summary Section 2.0, and the Emergency Plan Section 1.2.

The building code of record for the buildings on the site is the 2018 Edition of the International Building Code. The design satisfies American Society of Civil Engineers (ASCE) 7-16, Minimum Design Loads and Associated Criteria for Buildings and Other Structures, structural requirements for a Risk Category IV facility. The type of construction is classified as non-combustible. All

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-12 handling, processing, and storage of licensed material occurs in the two process buildings. One process building is sized for one process line, and the other process building is sized for two process lines, each building including similar process steps as outlined in Section 1.1.3.

Seismic Load: The design of the structures and facilities complies with seismic loadings based on the 2018 Edition of the International Building Code and ASCE 7-16, as appropriate for the geographic location of the site.

The ASCE 7 design basis earthquake is set at 2/3 of the site-class adjusted Maximum Considered Earthquake (MCER) accelerations in accordance with Section 11.4.5 of ASCE 7-16:

SDS (Design, 5% damped, spectral response acceleration, short periods) = 2/3

  • SMS = 0.432 SD1 (Design, 5% damped, spectral response acceleration, 1-s periods) = 2/3
  • SM1 = 0.122 The Seismic Design Category (SDC) is determined in accordance with Section 11.6 of ASCE 7-16 as a function of the structures Risk Category and the magnitude of the design spectral response acceleration parameters stated above. The SDC for the TRISO-X FFF Process Building is D. The equivalent lateral force (ELF) seismic analysis procedure is used as permitted by Section 12.6 of ASCE 7-16. The ELF procedure detailed in Section 12.8 of ASCE 7-16 takes into consideration the dynamic properties of the structure along with the seismic Importance Factor (1.5 for Risk Category IV) structures to determine the seismic response coefficient (Cs) and ultimately the seismic forces on the structure.

Wind Load: The basic (general) wind speed of 116 MPH is based upon a 3,000-yr return period for Risk Category IV structures per ASCE 7-16 Figure 26.5-1D and Commentary Section C26.5.1.

For tornado wind loads, the process buildings are evaluated for the tornado load cases in ASCE 7-22 Chapter 32 for a tornado wind speed of 136 mph.

Snow Load: The ground snow load of 10 psf is dictated by ASCE 7-16 Figure 7.2-1 and used in conjunction with equations in Ch. 7 of ASCE 7-16 to determine the loads on the structure. Per ASCE 7-16 Commentary Section C7.2, the ground snow load maps were developed by the Corp of Engineers, Cold Region Research and Engineering Laboratory (CRREL) to estimate snow loads with a 2% annual probability of being exceeded (50-yr Mean Recurrence Interval or MRI). Further detail is provided in the aforementioned commentary section. Note also that the Snow Importance Factor for a Risk Category IV structure is 1.20 which increases the flat room snow load by 20% from what would be calculated for a common Risk Category II structure.

Rain Load: The design rain load for the TRISO-X Facility is 6.14 in/hr (15-min duration and 3.24 in/hr (60-min duration). These rainfall intensities have a corresponding annual probability of exceedance of once in 100 years. Chapter 8.3 of ASCE 7-16 requires that each portion of a roof shall be designed to sustain the load of all rainwater that will accumulate on it if the primary drainage system for that portion is blocked plus the uniform load cause by the water that rises above the inlet of the secondary drainage system at its design flow.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-13 NUREG/CR-7046 was used to estimate a design basis flood due to local intense precipitation (LIP) and local storm runoff. NUREG/CR-7046 defines LIP as a measure of the extreme precipitation at a given location. National Oceanic and Atmospheric Administration (NOAA) Hydrometeorological Report No. 56 (HMR 56) recommended probable maximum precipitation (PMP) values were used to determine LIP values. The design basis flood for the TRISO-X facility is an LIP event based on a 1-hour PMP of 17.61 inches and a 6-hour PMP value of 36.30 inches.

Ice Load: The Process Building does not meet the definition of an ice-sensitive structure as given in Section 10.2 of ASCE 7-16 which is why atmospheric icing loads and wind-on-ice loads are not explicitly evaluated as a load case.

Hydrological and/or Geological Load: There are no additional hydrological loads that apply to the structure design other than snow, ice, and rain. There are no flooding loads on the structure and the foundations are above the groundwater table.

1.1.3 General Process Description TRISO-X FFF manufacturing operations consist of receiving uranium oxide powder and liquid uranyl nitrate enriched to less than 20 weight percent U-235; converting uranyl nitrate into oxide; converting oxide into a uranyl nitrate solution, into gel spheres, and then into fuel kernels; and processing the fuel kernels through coating, overcoating, fuel form pressing, and carbonization.

Coated particles and/or final fuel forms are removed from the process at the appropriate point and loaded into licensed shipping containers for shipment to other licensed facilities. These operations are supported by shipping and receiving, laboratory, quality control, research and development, uranium and chemical recovery, and waste disposal processes. Detailed facility and process descriptions are provided in the TRISO-X Fuel Fabrication Facility Integrated Safety Analysis Summary.

A list of the major manufacturing steps is provided below in the order in which the material flows through the process building. The maximum quantity of material in the process is controlled by the possession limits for the site as listed in License Chapter 1, Section 1.2.4. Material Control and Accounting procedures used to track and inventory SNM are described in the TRISO-X Fuel Fabrication Facility Fundamental Nuclear Material Control Plan.

Receipt of Uranium Oxide Feedstock (TX-1 and TX-2) - Incoming U3O8 feedstock enriched to less than 20 weight percent 235U arrives by truck in approved containers licensed by the NRC. Shipping packages are unloaded from the delivery truck and moved to a secure storage location inside the process buildings. Receipt measurements for Material Control and Accounting are performed, and the feedstock is transferred into portable containers and stored until ready for use in the Dissolution process.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-14 Receipt of Liquid Uranyl Nitrate Feedstock (TX-1 only) - Incoming liquid uranyl nitrate feedstock enriched to less than 20 weight percent arrives by truck in approved containers licensed by the NRC or DOE. Shipping packages containing liquid uranyl nitrate remain on the delivery trailer while the feedstock solution is transferred through a hose to a storage tank located inside the TX-1 process building. Receipt measurements for Material Control and Accounting are performed. Liquid uranyl nitrate is transferred from a storage tank to the Dilute Uranyl Nitrate Evaporation (DUNE) process where it is converted to U3O8 powder using an evaporator and a calciner. U3O8 powder from the calciner output is transferred to portable containers. The U3O8 powder is then either sent to storage or directly to the Dissolution process.

Dissolution - U3O8 powder is manually transferred from a portable container into a hopper in a glovebox. The U3O8 powder is then metered into a nitric acid and water solution in a column where it is mixed until the required amount of U3O8 is dissolved resulting in a uranyl nitrate solution. The uranyl nitrate solution is then transferred to storage columns until it is ready to be used in the Gelation process.

Gelation - The uranyl nitrate solution is mixed with organic additives, and liquid droplets are formed that react with heated silicone oil to produce gel spheres. The gel spheres are aged in silicone oil, washed and rinsed to remove the silicone and additives, and dried. The resulting dried microspheres are combined by mass to form the input batches to the Kernel Conversion process.

Kernel Conversion - The dried microspheres are converted in a high temperature furnace to fuel kernels of uranium compounds based on the fuel design being fabricated. The uranium compounds are uranium dioxide (UO2) and sub-stoichiometric uranium dicarbide (UC2-x), which together are referred to as uranium oxycarbide (UCO). The fuel kernels undergo quality checks, and non-conforming products are rejected and sent to the Uranium Recovery process. The fuel kernels that pass the quality checks are combined by mass to form the input batches to the Coating process.

Coating - The fuel kernels are coated with several carbonous layers using a fluidized bed chemical vapor deposition system, resulting in coated particle fuel. When four carbonous layers are used, the resulting uranium-bearing microspheres are known as TRISO particles. The coated particles undergo quality checks and non-conforming products are rejected and sent to the Uranium Recovery process. The coated particles that pass the quality checks are combined by mass to form the input batches to the Overcoating process.

Overcoating - The coated particles are overcoated with a layer of graphite matrix powder, based on the fuel design being fabricated and the packing fraction required in the fuel element. The overcoated particles (OCPs) undergo quality checks and non-conforming products are rejected and sent to a recovery station to remove the overcoating layer before being reintroduced into the Overcoating process. The OCPs that pass the quality checks are batched and sent to the Fuel Form Preparation process.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-15 Fuel Form Preparation - OCPs are poured into molds or tooling and compressed or compacted into green fuel forms of the desired geometry, such as compacts or pebbles, based on the fuel design being fabricated. Some fuel designs require encapsulating OCPs in additional GMP and/or shaping. The green fuel forms undergo dimensional checks, and non-conforming products are rejected and sent to the Uranium Recovery process. The green fuel forms that pass the quality checks are batched and sent to the High Temperature Carbonization process.

High Temperature Carbonization - The green fuel forms are processed through a high temperature furnace to convert the green body into a strong carbonized fuel form capable of withstanding handling and reactor service conditions. Final fuel form pebbles are machined to the specified fuel diameter. The final fuel forms undergo quality checks and those that pass are loaded into interim storage containers until an order is ready for loading into shipping containers.

Non-conforming products are rejected and sent to the Uranium Recovery process.

Uranium Recovery - Uranium is recovered from damaged, degraded, or otherwise non-conforming product materials through a variety of batch operations. The batch operations size reduce, deconsolidate, oxidize, and/or convert the non-conforming product materials to U3O8 powder so that it can be used as feedstock for the Dissolution process.

Shipping and Transportation - All shipments of nuclear materials and wastes are conducted in conformance with NRC, U.S. Department of Transportation, and State of Tennessee requirements. Incoming U3O8 feedstock arrives by truck in approved containers licensed by the NRC. Incoming liquid uranyl nitrate feedstock arrives by truck in approved containers licensed by the NRC or DOE. Final fuel forms are shipped out to customers by truck in approved containers licensed by the NRC. Low level waste shipments are appropriately packaged and analyzed for uranium content prior to shipment to licensed low-level waste disposal sites.

1.1.4 Raw Materials, Products, By-Products and Wastes

1. The uranium feed material for the TRISO-X FFF is liquid uranyl nitrate (TX-1 only) and uranium oxide powder (TX-1 and TX-2).
2. The manufacturing, recovery, support, and waste packaging activities are supported by a number of non-radiological chemical materials stored in bulk quantities, as listed in the NRC-required Emergency Plan and ISA Summary.
3. Finished products containing licensed material include coated particles and final fuel forms in various shapes and configurations.
4. There are no byproducts as defined by 10 Code of Federal Regulations (CFR) 30.4 extracted or converted after extraction from the TRISO-X FFF for use in a commercial, medical, or research activity.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-16

5. Uranium is recovered from non-conforming product materials, process solutions, and scrap materials by processing it into a form that is suitable for use as feedstock in the manufacturing process.
6. Process solutions contaminated with uranium that cannot be recovered/recycled are identified as liquid wastes. Liquid wastes are collected and sampled to determine appropriate handling/treatment steps. Treatment typically involves adjustment of pH, filtering, ion exchange, and/or precipitation. Precipitates are de-watered, and the solids are packaged for off-site disposal. If needed, liquid wastes that have been handled/treated can be sampled and discharged through an inline monitor to shipping packages for off-site disposal. Used oils may also be sampled and containerized for shipment to a licensed disposal facility.
7. Airborne effluents are discharged to the atmosphere via a number of process stacks.

HEPA filtration and scrubber systems are used where needed to remove radioactive particulates and chemicals from airborne effluents to assure compliance with 10 CFR 20 and applicable State of Tennessee regulations prior to discharge to the atmosphere. See Chapters 4 and 9 for programmatic information for managing and monitoring radioactive airborne effluent discharges.

8. Wastewater from systems and equipment in non-radiological mechanical equipment areas of the facility and sanitary wastes from bathrooms and showers are discharged through piping which goes to the City of Oak Ridge publicly owned treatment works (POTW). The City of Oak Ridge process for permitting discharges to the POTW will define monitoring requirements to assess potential contaminants in sanitary waste streams. No uranium will be present in this wastewater stream.
9. Solid waste materials include, but are not limited to, damaged and/or obsolete equipment, used ventilation filters and personal protective equipment, processing and waste treatment residues, and miscellaneous combustible wastes. Materials could be radiologically contaminated, non-contaminated, hazardous, or mixed (hazardous and radioactive). Solid waste materials are processed, recycled, and/or containerized for shipment to a licensed disposal facility.

1.2 Institutional Information 1.2.1 Corporate Identity This application is filed by TRISO-X, LLC, a Delaware limited liability company, headquartered at 530 Gaither Road, 7th Floor, Rockville, Maryland. TRISO-X, LLC is a wholly-owned subsidiary of X Energy, LLC, a Maryland limited liability company. TRISO-X, LLC is a privately held company and is not owned or controlled by a foreign corporation or government. The principal place of business and location of the licensed facility is as follows:

TRISO-X Fuel Fabrication Facility 170 Renovare Boulevard Oak Ridge, Tennessee 37830

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-17 1.2.2 U.S. Nuclear Regulatory Commission License Information

1. Docket Number: 70-7027
2. License Number: TBD
3. Period of License: 40 years 1.2.3 Financial Qualifications A summary of financial qualifications that demonstrates the financial capability of TRISO-X, LLC to construct and operate the TRISO-X FFF has been submitted separately for NRC review. The financial arrangements to assure that decommissioning funds will be available are set forth in Chapter 10.

1.2.4 Type, Quantity, and Form of Licensed Material The following types, maximum quantities, and forms of special nuclear materials (SNM) are authorized under 10 CFR 70.

1. [_____]SRI kilograms of U-235 contained in uranium enriched to less than 20%, in any chemical/physical form. Contaminants may include transuranic materials and fission products (Sum of Alphas 1,410 Bq/gU, Sum of Betas 243 Bq/gU, Sum of Gammas 2,710 Bq/gU).
2. 350 grams of U-235 in any chemical/physical form and at any enrichment for use in measurement and detection instruments, check sources, and instrument response standards.
3. 350 grams of U-235 in any chemical/physical form and at any enrichment for use in research and development studies.
4. 25 millicuries of plutonium as counting and calibration standards and/or for use in research and development studies.
5. 1 microcurie of any SNM as sealed and unsealed radioactive sources for use in measurement and detection instruments, check sources, instrument response standards, and counting and calibration standards.

1.2.5 Authorized Uses and Activities This license authorizes the use of SNM for operations involving enriched uranium pursuant to 10 CFR Part 70 as listed in this section. This also includes the support activities related to the manufacture of SNM-containing products.

1. Manufacturing Operations
a. Fuel Manufacturing - Conversion of uranium oxides to uranyl nitrate solutions, conversion of uranyl nitrates to uranium oxides, and fabrication of coated particles and final fuel forms containing uranium.
b. Uranium Recovery - recycling/recovery of SNM from process scrap materials.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-18

2. Laboratory Operations
a. Chemical, instrumental, and physical analyses and testing on material consisting of and/or containing SNM.
b. Preparation of any required samples or standards.
3. Research and Development Operations - Process, product, and other research and development activities using natural, source, and SNM compounds and mixtures in benchtop, laboratory-scale, and/or full-scale prototype equipment environments related to:
a. Enriched uranium fuel designs.
b. Manufacturing and processing technology and equipment.
c. Recycling/recovery.
4. Waste Operations
a. Volume reduction, treatment, packaging, and storage of liquid and solid wastes contaminated with or containing non-recoverable uranium.
b. Treatment, packaging, and storage of hazardous or mixed waste.
c. Shipment of wastes to licensed facilities for disposal.
5. Support Operations
a. Receipt, handling, and storage of raw materials.
b. Storage of licensed material compounds and mixtures in areas with containers arranged specifically for maintenance of radiological and nuclear safety.
c. Storage of finished fuel products and the preparation of these products for transportation off-site.
d. Decontamination of equipment and materials.
e. Maintenance, repair, calibration, and/or testing of SNM processing equipment, instruments, auxiliary systems, contaminated equipment, and facilities.

1.2.6 Site Safeguards Physical security at the TRISO-X FFF is described in the NRC-approved TRISO-X Fuel Fabrication Facility Physical Security Plan, and nuclear material control and accountability (MC&A) is described in the NRC-approved TRISO-X Fuel Fabrication Facility Fundamental Nuclear Material Control Plan. Both plans are maintained current in accordance with applicable regulations as outlined in Chapters 12 and 13. These plans detail the measures employed at the facility to detect potential loss of, and mitigate the opportunity for theft of, SNM of Moderate Strategic Significance, in accordance with the applicable requirements of 10 CFR 73 and 10 CFR 74.

Safeguards Information is controlled as described in the TRISO-X Facility Safeguards Information Plan.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-19 1.2.7 Terminology / Definitions Definitions for terms specific to a particular safety function may be given in the corresponding chapter on that function. The following definitions apply to terms used in this license:

Term Definition U-235 Enrichments Low enriched uranium, which is also known as high assay low enriched uranium (HALEU), is defined as any compound of uranium in which the enrichment in the isotope of uranium-235 is less than 20 percent by weight.

Nuclear Safety Nuclear criticality safety Will, Shall A requirement.

Should A recommendation.

May Permission (optional), neither a requirement nor a recommendation.

Are An existing practice for which there is a requirement to continue.

Frequencies When audit, measurement, surveillance, and/or other frequencies are specified in license documents and approved procedures, the following time spans apply:

Monthly - an interval not to exceed 40 days Quarterly - an interval not to exceed 4 months Semi-Annually - an interval not to exceed 7 months Annually - an interval not to exceed 15 months Biennially - an interval not to exceed 30 months Triennially - an interval not to exceed 45 months For time spans not covered above, an extension of 0.25 times the interval will apply.

NUREG-1520 does not provide guidance on audit frequency. The basis for the extension is to allow for flexibility in resources and scheduling, as previously approved in ML22294A181 Westinghouse License SNM-1107, Section 1.1.6.19, which contains the same frequencies and extension.

Criticality Control or Criticality Safety Control The administrative and technical requirements established to minimize the probability of achieving inadvertent criticality in the environment analyzed.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-20 Term Definition Work Area Air Samplers Stationary air samplers used to measure the effectiveness of containment. If stationary air samplers are demonstrated to represent the air breathed by a worker, the results may be used to estimate worker dose. Where stationary air samplers have not been proven to be representative of the air a worker breathes, lapel air samplers may be used to estimate the workers dose.

Equivalent Experience For the purpose of meeting educational requirements described throughout the license, two (2) years applicable experience is considered to be equivalent to one (1) year of post-secondary education. For example, eight (8) years of applicable experience will satisfy the requirement for a B.S. degree (4 years of post-secondary education).

Owner Controlled Area A site area bounded by a fence designed to provide physical security, and which encompasses the Controlled Access Area. The area contains radioactive material processing, storage, and laboratory areas, as well as support functions.

Restricted Area A site area in which individuals may be exposed to radiation or radioactive material at levels or concentrations in excess of that allowed for the general public (see definition in 10 CFR 20.1003). This could include any location on the site where the TRISO-X FFF is located, depending upon activities conducted and the exposure potential as evaluated by the safety function.

Radiologically Controlled Area A site area where uncontained radioactive material is present, such that contamination levels are likely to be encountered in excess of acceptable levels for unrestricted use. This type of area, designated for contamination control purposes, requires various levels of protective clothing and other personnel protective actions. It could include any location within the Restricted Area, either on a permanent or temporary basis. This term is analogous to the 10 CFR 20.1003 defined term controlled areaan area, outside of a restricted area, but inside the site boundary, access to which can be limited by the licensee for any reason.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-21 Term Definition Uncontrolled Area A site area where radioactive materials may be handled in the form of sealed sources, in packages or closed containers, in small amounts (air samples, bioassay samples, etc.), or not at all. This type of area is designated for contamination control purposes and is not likely to have contamination at levels in excess of those acceptable for unrestricted use.

Conditions Adverse to Safety or Quality As used in Sections 2.2, 2.5.1, 11.6, 11.6.1, and 11.8, events that could have the potential to impact the safety or quality of licensed activities, including equipment failures, malfunctions, or deficiencies; procedure problems, errors, or omissions; improper installations; non-conformances with regulatory requirements or commitments; quality-related issues; or a significant condition, such that if uncorrected, could have a serious effect on safety.

1.3 Special Exemptions and Special Authorizations 1.3.1 Special Exemptions 1.3.1.1 Criticality Monitoring 10 CFR 70.24(a) requires a licensee authorized to possess SNM in stated amounts to maintain in each area in which such licensed SNM is handled, used or stored to employ a Criticality Accident Alarm System (CAAS) meeting the stated requirements.

Notwithstanding the requirements of 10 CFR 70.24(a), the licensee is granted an exemption from criticality monitoring requirements for SNM stored in authorized shipping containers complying with the requirements of the Code of Federal Regulations, Title 10, Part 71, and which are in isolated arrays or on a transport vehicle and which are no more reactive than that approved for transport.

The requirements in 10 CFR 71.55, General Requirements for Fissile Material Packages, and 10 CFR 71.59, Standards for Arrays of Fissile Material Packages, ensure that arrays will remain subcritical under normal conditions and under accident conditions. The exemption does not affect the level of protection for either the health and safety of workers and the public or for the environment; nor does it endanger life or property or the common defense and security.

Under the provisions of 10 CFR 70.17, Specific Exemptions, the Commission may, upon application, grant exemptions from the requirements of 10 CFR 70 when the exemption is

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-22 authorized by law, will not endanger life or property or the common defense and security and are otherwise in the interest of the public.

The exemption is authorized by law because the Atomic Energy Act of 1954, as amended, contains no provisions prohibiting a licensee from being exempted from CAAS monitoring in a given area in which there is negligible risk of criticality. Granting such an exemption will not endanger life, property, or the common defense and security.

Granting this exemption to 10 CFR 70.24(a) is in the public interest because having criticality accident alarms in an area in which there is a negligible risk of criticality may cause unnecessary evacuations and an emergency response based on a potential spurious alarm. Spurious alarms could also cause unnecessary risk to individuals during an evacuation and provide confusing information about the safety of the facility to the public.

1.3.1.2 Posting and Labeling 10 CFR 20.1904(a) requires a licensee to ensure that each container of licensed material bears a durable, clearly visible label bearing the radiation symbol and the words: CAUTION, RADIOACTIVE MATERIAL or DANGER, RADIOACTIVE MATERIAL. The label must also provide sufficient information (such as the radionuclide(s) present, an estimate of the quantity of radioactivity, the date for which the activity is estimated, radiation levels, kinds of materials, and mass enrichment) to permit individuals handling or using the containers, or working in the vicinity of the containers, to take precautions to avoid or minimize exposure.

Notwithstanding the requirements of 10 CFR 20.1904(a), the licensee is granted an exemption from affixing a label to each container of licensed material when entrances into each building in which radioactive materials are stored, used, or handled are posted with a sign stating "EVERY CONTAINER OR VESSEL WITHIN THIS AREA MAY CONTAIN RADIOACTIVE MATERIALS".

Granting this exemption request is otherwise in the public interest because it promotes regulatory efficiency. The exemption relieves the licensee from a requirement to label containers of licensed material in controlled areas to which the public has no access; therefore, the activities do not present a risk to public health and safety. Granting the exemption allows the licensee to focus the resources required to fulfill the labeling requirement on other activities.

The exemption is authorized by law because there is no statutory prohibition on the proposed posting of a single sign indicating that every container in the posted area has the potential for internal contamination. To reduce unnecessary regulatory burden, the NRC issued a final rule in 2007 that, in part, modified 10 CFR 20.1905, Exemptions to Labeling Requirements, thereby exempting certain containers holding licensed material from the labeling requirements of 10 CFR 20.1904 if certain conditions are met. Although the 2007 rulemaking only applied to facilities licensed under 10 CFR 50 and 10 CFR 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, the rationale underlying the rule supports the exemption request. Exempting TRISO-X

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-23 from this requirement reduces licensee administrative and information collection burdens but serve the same health and safety functions as the current labeling requirements. Therefore, the exemption does not affect the level of protection for either the health and safety of workers and the public or for the environment; nor does it endanger life or property or the common defense and security.

1.3.1.3 ICRP-68 DAC and ALI Values Derived air concentration (DAC) and the annual limit on intake (ALI) values based on the dose coefficients published in the International Commission on Radiation Protection Publication 68 (ICRP-68) may be used in lieu of the DAC and ALI values in Appendix B of 10 CFR 20 in accordance with approved procedures. See Chapter 4 for additional details.

The ICRP-68 guidance was promulgated after the 10 CFR 20, Appendix B criteria were established, and provides an updated and revised internal dosimetry model. Use of the ICRP-68 models provide more accurate dose estimates than the models used in 10 CFR 20 and allows TRISO-X to implement an appropriate level of internal exposure protection. In a Staff Requirements Memorandum dated April 21, 1999 (SECY-99-077), the Commission approved the staff granting exemptions based on the precedent set by the decision to authorize the use of models in ICRP Publication 68.

This exemption is in accordance with the As Low As is Reasonably Achievable (ALARA) principle, international standards on radiation protection, and does not conflict with established NRC dose limits. No new accident precursors are created by this exemption to allow modification to the values used to assess internal dose. There is no significant increase in the risk to workers or members of the public as a result of this exemption. The activities that are authorized by this exemption are in compliance with law and will not endanger life or property or the common defense and security.

1.3.1.4 ICRP-60 Organ Dose Weighting Factors Tissue weighting factors listed in the International Commission on Radiation Protection Publication 60 (ICRP-60) may be used in lieu of the organ dose weighting factors in 10 CFR 20.1003 for effective dose assessments listed in ICRP-68 methodologies, in accordance with approved procedures.

The ICRP-60 guidance was promulgated in the same year that 10 CFR 20 organ dose weighting factors were established. Use of the ICRP-60 models provide more accurate dose estimates than the models used in 10 CFR 20 and allows TRISO-X to implement an appropriate level of internal exposure protection. In a Staff Requirements Memorandum dated April 21, 1999 (SECY-99-077),

the Commission approved the staff granting exemptions based on the precedent set by the decision to authorize the use of models in ICRP Publication 68.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-24 The underlying purpose of 10 CFR Part 20 is to ensure that occupational workers and members of the public are protected from radiation; that their doses, as a result of licensed activities, are within prescribed limits; and that their doses are ALARA.

This exemption is in accordance with the ALARA principle, international standards on radiation protection, and does not conflict with established NRC dose limits. No new accident precursors are created by this exemption to allow modification to the values used to assess internal dose.

There is no significant increase in the risk to workers or members of the public as a result of this exemption. The activities that are authorized by this exemption are in compliance with law and will not endanger life or property or the common defense and security.

1.3.1.5 Certain Unplanned Contamination Events Notwithstanding the requirements of 10 CFR 70.50(b)(1), the licensee is granted an exemption from the requirement to report unplanned contamination events when the following conditions are met:

1. The event occurs in a restricted area in a building which is maintained inaccessible to the public by multiple access controls.
2. The area was controlled for contamination before the event occurred, the release of radioactive material is under control, and no contamination has spread outside the area.
3. Radiation safety personnel trained in contamination control are readily available.
4. Equipment and facilities that may be needed for contamination control are readily available.
5. The otherwise reportable unplanned contamination event is documented in the licensees Corrective Action Program.

Chapter 4 describes the radiation protection program measures that keep worker exposures ALARA through: (a) approved radiation protection procedures and radiation work permits; (b) the use of ventilation systems, containment systems, and respirators to control exposure to airborne radioactive material; (c) the use of protective clothing to prevent the spread of surface contamination; (d) the use of surveys and monitoring programs to document contamination levels and exposures to workers; and (e) identification of items relied on for safety and management measures to maintain those items available and reliable.

In addition, (f) access to the site is restricted to individuals that have completed site-specific nuclear safety training requirements or individuals that are formally escorted; (g) during normal operations, trained and qualified radiation protection staffing is provided and readily available to support and respond to radiological conditions, and the staff is trained in contamination control procedures and techniques required for responding to a contamination event when needed; (h) appropriate radiation surveys are performed by qualified personnel during or after an unplanned contamination event as necessary to assess radiological conditions and provide the appropriate response, survey results are compared to specified action guides, appropriate actions are taken when contamination levels in excess of action levels are found and the affected area is

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-25 decontaminated in a safe and timely manner, and survey records for contamination events are documented pursuant to 10 CFR 20.2103 and are available for review.

Based on the limited scope of the exemption, and the access and contamination controls, training, radiation surveys and other ALARA measures described in the application, granting the exemption as stated above does not endanger life or property. The exemption does not alter reporting requirements for unplanned contamination events through other NRC requirements such as 10 CFR 20.2202, Notification of incidents, and 10 CFR 20.2203, Reports of exposures, radiation levels and concentrations of radioactive material exceeding the constraints or limits. In addition, the exemption does not involve information or activities that could impact the common defense and security.

Granting this exemption request is otherwise in the public interest because it promotes regulatory efficiency. The exemption relieves the licensee from a reporting requirement for unplanned contamination events that do not present a risk to public health and safety given the site-specific conditions and programs described above. Specifically, the exemption relieves the licensee from generating reports of contamination events in controlled areas where the release of radioactive material is under control and no contamination has spread outside the controlled area. Granting the exemption allows the licensee to focus the resources required to fulfill the reporting requirement on other activities. In addition, it relieves the NRC staff from receiving and processing reports which do not present a risk to public health and safety.

Therefore, the exemption does not affect the level of protection for either the health and safety of workers and the public or for the environment; nor does it endanger life or property or the common defense and security. Granting of this exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, the Commissions regulations, or other laws. Therefore, the exemption is authorized by law.

1.3.1.6 Process Buildings 10 CFR 70.61(e) requires each engineered or administrative control or control system necessary to comply with paragraphs (b), (c), or (d) of this section shall be designated as an item relied on for safety.

Notwithstanding the requirements of 10 CFR 70.61(e), the licensee is granted an exemption from the process buildings being formally designated as items relied on for safety because reasonable assurance of adequate protection is provided by meeting 10 CFR 70.64. The TRISO-X process buildings do not perform a containment or confinement safety function in the context of 10 CFR 70.61; however, they do perform a structural stability function to withstand the effects of credible natural phenomena hazards (NPH) so that the building does not collapse. TRISO-X designed the process buildings in accordance with the 2018 edition of the International Building Code (IBC) as Risk Category IV structures. The structures are designed for the load cases in American Society of Civil Engineers (ASCE) 7-16 Minimum Design Loads and Associated Criteria

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-26 for Buildings and Other Structures. For tornado wind loads, the process buildings are designed for the tornado load cases in ASCE 7-22 Chapter 32 for a tornado wind speed of 136 mph.

Compliance with IBC 2018, ASCE 7-16, and ASCE 7-22 (tornado only) is used to demonstrate the process buildings will perform their intended function of structural stability to meet the requirements of 10 CFR 70.64; however, the TRISO-X process buildings are not identified as items relied on for safety (IROFS) per 10 CFR 70.61(e) in the Integrated Safety Analysis Summary. The TRISO-X process buildings are maintained under the Configuration Management Program as required by 10 CFR 70.72(a) which provides reasonable assurance that the original building design will be maintained going forward and the building will continue to be available and reliable to perform its structural stability function.

Granting this exemption from the process buildings being formally designated as IROFS does not violate the Atomic Energy Act of 1954, as amended, other laws, or the Commissions regulations because reasonable assurance of adequate protection is provided by meeting 10 CFR 70.64.

Therefore, the exemption is authorized by law.

Granting this exemption from the process buildings being formally designated as IROFS does not affect the reasonable assurance of adequate protection provided by complying with 10 CFR 70.64 through use of building codes for either the health and safety of workers and the public or for the environment and will not endanger life or property or the common defense and security. The TRISO-X Integrated Safety Analysis Summary demonstrates the 10 CFR 70.61 performance requirements are met without designating the process buildings as IROFS. The process buildings are not credited for containment or confinement of a uranium or chemical release accident scenario, and the consequences to the public from a radiological release, chemical release, and a criticality event are low. The structural stability of the process buildings is initially demonstrated by compliance with 10 CFR 70.64 by using the International Building Code and other related building codes for the design of new facilities and processes and is continually demonstrated throughout the life of the facility by management of changes under the TRISO-X configuration management program as required by 10 CFR 70.72. Therefore, the exemption will not endanger life or property or the common defense and security.

Granting this exemption from the process buildings being formally designated as IROFS promotes regulatory efficiency by reducing construction oversight and reducing operations oversight over the life of the facility, which is an added cost that does not provide a comparable benefit of enhanced safety or reliability versus the reasonable assurance of adequate protection provided by complying with 10 CFR 70.64 through use of building codes. This allows both TRISO-X and NRC to maintain and focus resources on the appropriate systems, structures, and components that are designated as IROFS to meet the 10 CFR 70.61 performance requirements. This approach supports efficient regulatory oversight and use of TRISO-X resources while maintaining reasonable assurance of adequate protection of public health and safety. Therefore, the exemption is in the public interest.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-27 1.3.2 Special Authorizations 1.3.2.1 Changes to the License Application Changes may be made to the License Application and/or to supporting documents referenced in the license without prior NRC approval provided that the following conditions are met:

1. The change does not decrease the level of effectiveness of the design basis as described in the License Application.
2. The change does not result in a departure from the methods of evaluation described in the License Application used in establishing the design basis.
3. The change does not result in a degradation of safety.
4. The change does not affect compliance with applicable regulatory requirements.
5. The change does not conflict with an existing license condition.
6. Within 30 days after the end of the calendar year in which the change is implemented, the licensee shall submit the revised chapters of the License Application to the Director, NMSS, using an appropriate method listed in 10 CFR 70.5(a), and a copy to the appropriate NRC Regional Office.

This authorization is consistent with the process for making changes under 10 CFR 70.72, Facility Changes and Change Process, and is further supported by Section C5, Other Changes, in NRC Regulatory Guide 3.74, Guidance for Fuel Cycle Facility Change Processes, January 2012.

1.3.2.2 Release for Unrestricted Use Limits developed by the NRC as specified in Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct, Source, or Special Nuclear Material, U.S. Nuclear Regulatory Commission, April 1993, may be used for decontamination and survey of surfaces or premises and equipment prior to abandonment or release for unrestricted use.

These guidelines are included as a regulatory acceptance criterion in NUREG-1520, Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility, as an acceptable method of demonstrating compliance with the radiation survey and monitoring requirements in 10 CFR Part 20. See Chapter 4 for additional details.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-28 Figure 1-1: Site Location

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-29 Figure 1-2: Key Features Near the Site

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-30 Figure 1-3: Regional Highways and Interstates Near the Site

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-31 Figure 1-4: Site Plan

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-32 Figure 1-5: Plan View of Geologic Cross Sections

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-33 Figure 1-6: Geologic Cross-Section 1

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-34 Figure 1-7: Geologic Cross-Section 2

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-35 Figure 1-8: Geologic Cross-Section 3

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-36 Figure 1-9: Geologic Cross-Section 4

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-37 Figure 1-10: Geologic Cross-Section 5

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-38 Figure 1-11: Groundwater Contours - September 2021

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-39 Figure 1-12: Groundwater Contours - January 2022

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-40 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 4-Nov-22 N/A All changes for this revision are based on RSI responses in TX0-LTR-0006.

Section 1.1.1 Added geotechnical discussion of site regarding slope stability, soil liquefaction, differential settlement, bearing capacity, karst features, and site cross sections. (RSI 7.1, 7.2, 7.3, 7.4, 7.5, 7.6)

Section 1.1.2 Added design basis values for seismic, wind, precipitation, hydrological, and geological NPH. (RSI 6.1)

Section 1.3 Separated special exemptions and special authorizations. Re-numbered subsections. (RSI Observation)

Section 1.3.1.1 Added detail for criticality monitoring exemption. (RSI 1-A, RSI Observation)

Figures 1-3 thru 1-8 Added new figures for site geological cross sections. (RSI 7.6) 3 Dec-24 ALL Added document number TXF-REG-NRC-0001 to header.

Section 1.1.1.1, Figure 1-2, Figure 1-3 Revisions based on RAI responses, TX0-LTR-0022 Added reference to new Figure 1-2 to show key features near the site due to License Chapter 1 RAI-1.

Added reference to Environmental Report figures that contain more information about population near the site due to License Chapter 1 RAI-5.

Updated nearest school name, direction, and distance due to License Chapter 1 RAI-5.

Added description of and reference to new Figure 1-3 to show regional highways and interstates near the site due to License Chapter 1 RAI-6.

Sections 1.1.1.3, 1.1.2 Updated to reflect more than one process building is planned for the site.

Section 1.1.1.3 Revisions based on RAI responses Updated description of nearest users of groundwater downgradient of the site due to TX0-LTR-0022, License Chapter 1 RAI-7.

Added description of the stormwater system on the site due to TX0-REG-LTR-0042, Hydrology RAI-4.

Added description of and reference to new Figures 1-9 and 1-10 that show seasonal groundwater potentiometric level contours on the site. (Hydrology RAI-6)

Section 1.1.1.4 Updated Potential for Karst Features due to TX0-LTR-0028, Hydrology RAI-1. Added reference to additional borings performed for TX-1 location.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-41 Section 1.1.2 Expanded the descriptions of the five buildings planned for the site due to TX0-LTR-0022, License Chapter 1 RAI-1.

Added commitment to ASCE 7-16 Risk Category IV due to TX0-REG-LTR-0045, Enclosure 1 Structural RAI-2, and updated design load values.

Section 1.1.3 Added brief descriptions for the major manufacturing steps due to TX0-LTR-0022, License Chapter 1 RAI-3. Also added new process step to receive/store/convert uranyl nitrate to uranium oxide to account for alternate HALEU feed material.

Section 1.1.4 Updated Items 5, 6, and 7 due to TX0-LTR-0022, License Chapter 1 RAI-8 and RAI-9.

Section 1.2.1 Updated legal corporate address for TRISO-X, LLC due to corporate office relocation. Updated facility address recently assigned by the City of Oak Ridge.

Section 1.2.4 Deleted references to 10 CFR 30 and 40 and deleted Items 5 and 6 due to TX0-LTR-0024, License Chapter 1 RAI-10 and RAI-11.

Updated U-235 value for Item 1 based on quantity required to operate TX-1 and TX-2.

Updated contaminant values for Item 1 based on evaluation of characterization data for the alternate HALEU feed material in the form of uranyl nitrate.

Section 1.2.7 Work Area Air Samplers - reworded to improve readability.

Conditions Adverse to Safety - updated section references.

Section 1.3.1.2 Addressed why granting the exemption request is otherwise in the public interest due to TX0-LTR-0022, License Chapter 1 RAI-14A.

Section 1.3.1.5 Addressed why granting of the exemption is authorized by law.

Figure 1-4 Renumbered Figure 1-2 due to insertion of new Figures 1-2 and 1-3.

Updated to current version of site plan.

Figures 1-5 to 1-10 Renumbered Figures 1-3 to 1-8 due to insertion of new Figures 1-2 and 1-3.

Updated figures to show boring locations superimposed on the footprint of the process building due to TX0-LTR-0028, Geotechnical RAI-1.

Figure 1-11, Figure 1-12 Added due to TX0-LTR-0028, Hydrology RAI-6.

Revision Summary Added revision summary to end of chapter.

4 Dec-25 Section 1.1.1.2 Added most severe documented historical events in accordance with 10 CFR 70.64(a)(2) based on TX0-REG-LTR-0080 RAI-1 response.

Section 1.1.1.3 Revised design basis flood detail based on TX0-REG-LTR-0080 RAI-3 response.

Section 1.1.2 Revised tornado wind load evaluation based on TX0-REG-LTR-0091 RAI-7 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0001 SNM-XXXX CHAPTER 1 Revision 4 December 2025 Page 1-42 Section 1.1.3 Revised general process descriptions based on TX0-REG-LTR-0071 RAI-1 response and Observation 1.

Removed OCP washing and replaced with OCP recovery based on TXF-DR-ECR-0036-015.

Section 1.1.4 Revised feed material based on TX0-REG-LTR-0071 RAI-1 response.

Section 1.2.5, Item 1a Added conversion of uranyl nitrates to uranium oxides based on TX0-REG-LTR-0071 RAI-1 response.

Section 1.2.7 Revised definition of Frequencies based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-14 response.

Revised definition of Equivalent Experience based on TX0-REG-LTR-0071 Set 13 Chapter 1 Observation 2 response.

Added or Quality to Conditions Adverse to Safety based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-20 response.

Section 1.3.1.6 New section for exemption request for the process buildings based on TX0-REG-LTR-0080 RAI-6 response.

Revised tornado wind load evaluation based on TX0-REG-LTR-0091 RAI-7 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-1 ORGANIZATION AND ADMINISTRATION Table of Contents SECTION TITLE STARTS ON PAGE 2.1 General Safety Policy and Responsibilities 2-2 2.2 Site Organization 2-2 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.4.1 2.3.4.2 2.3.4.3 2.3.4.4 2.3.4.5 2.3.4.6 2.3.4.7 2.3.4.8 2.3.4.9 2.3.5 Organizational Responsibilities, Authority, and Qualifications Plant Manager Manufacturing Engineering Regulatory Affairs Nuclear Criticality Safety Function Radiation Protection Function Environmental Protection Function Industrial, Chemical, and Fire Safety Functions Integrated Safety Analysis Function Licensing Function Material Control and Accountability Function Security Function Emergency Preparedness Function Quality Assurance 2-3 2.4 Safety Review Committee 2-9 2.5 2.5.1 2.5.2 2.5.3 Administration Reporting of Potentially Unsafe Conditions or Activities Management Measures Off-Site Emergency Response Resources 2-10 2.6 Transition from Design to Construction to Operations 2-11

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-2 ORGANIZATION AND ADMINISTRATION 2.1 General Safety Policy and Responsibilities It is TRISO-Xs policy that radiation exposures to employees and the general public be kept ALARA.

TRISO-Xs policy further ensures that environmental protection measures are in place to control and monitor gaseous and liquid effluents and appropriately manage radioactive solid waste to ensure facility operations meet applicable regulations. Responsibility for safety in the various manufacturing lines, processes, and services is delegated to the lowest practical level of supervision. Safety is the responsibility of each supervisor within his/her own area. Through training and periodic retraining, each individual, regardless of position, is made aware that safety in his/her work area is ultimately his/her responsibility.

2.2 Site Organization The TRISO-X organization provides the management, administrative, and technical capabilities for ensuring that design, construction, startup, modifications, and operations utilizing licensed materials are conducted in a manner that is protective of its workers, the public, and the surrounding environment, and remain in compliance with applicable Federal, State, and local regulations, licenses, and permits. This responsibility is implemented through the disciplines of manufacturing, engineering, regulatory affairs, and quality assurance, as described in the sections below, all of which have safety-related responsibilities. Figure 2-1 shows the current TRISO-X functional organization, including the independence of manufacturing, regulatory affairs, and quality assurance.

The management positions for each discipline together have the delegated responsibility for plant safety and for compliance with conditions of SNM licenses and with federal, state, and local regulations and laws governing operation of a nuclear facility in order to maintain a safe workplace for all employees. Each discipline management team is responsible for ensuring that all activities in their area are performed in a safe and effective manner; managing and directing operations within their discipline; ensuring that all operations under its guidance comply with safety and license conditions, requirements for quality-related safety activities, and safety-related configuration management requirements; being knowledgeable of the safety procedures and programs as they relate to their area of responsibility; developing, approving, and implementing procedures that incorporate safety and quality controls and limits commensurate with the particular operation involved; and ensuring that conditions adverse to safety or quality are reported and investigated promptly, and that corrective actions are tracked to completion and, as applicable, monitored for effectiveness.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-3 2.3 Organizational Responsibilities, Authority, and Qualifications This section describes the responsibilities, education, and experience of key positions required by this license application.

Key personnel are those individuals who are responsible for safety and for safe operation of the site and include the plant manager and the discipline managers described in this section.

Company policy requires written delegation of authority when senior managers are unavailable to perform their duties. The emergency plan delineates responsible management personnel and reporting relationships for handling site emergency situations.

The positions described in this section are intended to describe the license-related responsibilities and do not reflect actual job titles. The responsibilities of the positions described may be fulfilled by one or more different organizational positions as long as the minimum position qualifications specified in this chapter are met for functional area(s) he/she is responsible to oversee. Similarly, functional areas shown in Figure 2-1 and described in Sections 2.3.2, 2.3.3, 2.3.4, and 2.3.5 of this chapter may be grouped within their disciplines as needed to support the TRISO-X organization as long as the individual(s) responsible for the function(s) have a sufficient background to provide the capability for making sound safety and/or regulatory decisions. A combination of education and experience may be substituted for minimum qualifications described in this chapter if management determines that other factors provide sufficient demonstration of the ability to fulfill the duties of a position. When substituting experience for education, refer to the definition of Equivalent Experience in Section 1.2.7. When substituting type of work experience, two years of relevant non-nuclear experience is equivalent to one year of nuclear experience.

2.3.1 Plant Manager The plant manager, or the discipline manager authorized to be his/her alternate, has the overall responsibility for the safety, security, quality, and operational aspects of all licensed activities conducted at the TRISO-X Fuel Fabrication Facility. Daily responsibility for licensed activities may be delegated in writing to one or more of the discipline manager positions specified in Sections 2.3.2 and 2.3.4.

The minimum qualifications for the plant manager are a BS/BA or advanced degree (masters or doctorate) in science, engineering, or a technical field; at least five years of management experience in the nuclear industry and/or a nuclear-related field; and a general knowledge concerning the regulatory aspects of policies and procedures at the TRISO-X Fuel Fabrication Facility.

2.3.2 Manufacturing The Manufacturing discipline is responsible for oversight of manufacturing-related activities involving the handling and processing of SNM, including developing operating procedures and

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-4 maintaining facilities and equipment in a safe operating condition. This discipline includes activities associated with enriched uranium processing, transportation and waste management operations, and related equipment installation, start-up, and maintenance. This discipline manages the manufacturing technician work force and has line management responsibility for implementation of the safety programs and systems for conducting an active ALARA Program.

Functional areas include fuel manufacturing, maintenance, and transportation & waste management.

The minimum qualifications for a Manufacturing discipline manager are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least five years of management experience in the nuclear industry, a nuclear-related field, or relevant non-nuclear manufacturing assignments.

The minimum qualifications for individual(s) responsible for oversight of manufacturing function(s) are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least three years of experience in the nuclear industry, a nuclear-related field, or other relevant non-nuclear manufacturing assignments.

2.3.3 Engineering The Engineering discipline performs and/or provides oversight of activities involving design, construction, and/or installation of new and modified facilities and equipment; supplies maintenance and process engineering support; conducts activities associated with product research and development; assures that all equipment and facilities have appropriate safety controls and have been evaluated within the spirit and intent of ALARA; establishes configuration management (CM) as defined in Chapter 11 to ensure consistency among design and regulatory requirements, physical configuration, and facility configuration information; and maintains this consistency throughout the life of the facilities and activities until the point that CM is no longer needed. Functional areas include configuration management, process engineering, plant/facilities engineering, and research & development.

The minimum qualifications for an Engineering discipline manager are a BS or advanced degree (masters or doctorate) in engineering and at least five years of management experience in engineering-related activities, two years of which have been in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear engineering assignments.

The minimum qualifications for individual(s) responsible for oversight of engineering function(s) are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least three years of experience in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear engineering assignments.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-5 2.3.4 Regulatory Affairs The Regulatory Affairs discipline provides programs, procedures, and reviews to assure worker health and safety; security; environmental protection; and compliance with licenses and permits, including those related to transportation and disposal of licensed material. These activities are conducted with the ALARA principle in mind. Functional areas include nuclear criticality safety; radiation protection; environmental protection; industrial, chemical, and fire safety; integrated safety analysis; licensing; material control and accounting; security; and emergency preparedness. Emergency preparedness and response programs are supported by each functional area as needed. The integrated safety analysis (ISA) process is supported by each functional area providing ISA Team members as needed.

The Regulatory Affairs discipline monitors operations to ensure they are conducted in compliance with federal, state, and local regulations, and is authorized to suspend operations, approve re-start of operations, and/or require additional safety precautions when such measures are necessary in the interest of plant safety, security, or protection of the environment. The Regulatory Affairs discipline is administratively independent of the Manufacturing discipline, but both disciplines may report to a common management position.

The Regulatory Affairs discipline is responsible for oversight of the safety review committee as described in Section 2.4. The Chairperson of the safety review committee is considered to be a member of the committee and he/she may represent one of the disciplines/functions on the committee if approved by the plant manager, or designated alternate.

The minimum qualifications for a Regulatory Affairs discipline manager are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least five years of management experience in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear regulatory assignments. He/she must have appropriate understanding of the functional program(s) being managed.

2.3.4.1 Nuclear Criticality Safety Function The nuclear criticality safety (NCS) function has responsibility for the development and implementation of a comprehensive nuclear criticality safety program, as defined in Chapter 5.

Key responsibilities include the performance of NCS evaluations of applicable SNM operations and proposed changes to those operations; establishing NCS limits and controls based on those evaluations; assuring the proper incorporation of NCS engineered controls into design; assuring the proper incorporation of NCS limits and controls into applicable procedures and work instructions; and monitoring plant compliance with the NCS requirements through audits and assessments. The NCS function is administratively independent of Production and has the authority to shutdown potentially unsafe operations.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-6 The minimum qualifications for the individual responsible for oversight of the nuclear criticality safety function are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least three years of experience in nuclear criticality safety.

The minimum qualifications for nuclear criticality safety engineers are a BS/BA or advanced degree (masters or doctorate) in science or engineering and successful completion of a formal internal training and qualification program that is defined in approved procedures.

2.3.4.2 Radiation Protection Function The radiation protection function has responsibility for establishing and maintaining the radiation safety program necessary to ensure the protection of employees at the TRISO-X Fuel Fabrication Facility and the community, as defined in Chapter 4. Key responsibilities include management of the ALARA, dosimetry, and radiation monitoring and surveillance programs; analysis and approval of operations involving radiological safety and proposed changes to those operations; establishing radiation protection criteria, procedures, and training programs to control contamination and exposure to individuals and the environment; and monitoring plant compliance with the radiological protection criteria through inspections and audits. Radiation monitoring includes measurement of airborne radionuclide concentration, contamination level, and external radiation levels; evaluation of the operational integrity and reliability of radiation detection instruments; and maintenance of records related to the radiation monitoring program.

These tasks are accomplished through the use of health and safety technicians, health and safety technician supervisor(s), health physicists, and individual(s) responsible for oversight of the radiation protection function. The radiation protection function is administratively independent of production and has the authority to shutdown potentially unsafe operations.

The individual(s) responsible for oversight of the radiation protection function administer activities associated with radiological safety and has direct access to the plant manager (or equivalent) in vital matters of radiological safety. This includes monitoring and control of areas of airborne radioactivity, surface contamination, containment, ventilation, internal and external dosimetry, and bioassay services.

The minimum qualifications for the individual(s) responsible for oversight of the radiation protection function are a BS/BA or advanced degree (masters or doctorate) in science or engineering, and at least three years of experience in radiation safety and have an understanding of the application and direction of radiation protection programs.

The minimum qualifications for a health physicist are a BS/BA or advanced degree (masters or doctorate) in science or engineering, and at least one year of experience in health physics at a nuclear facility.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-7 2.3.4.3 Environmental Protection Function The environmental protection function has responsibility for establishing and maintaining the environmental protection program necessary to ensure the protection of the public and the environment, as defined in Chapter 9. Key responsibilities include identification of environmental requirements of federal, state, and local regulations governing TRISO-X operations; assurance of proper federal and state permits, licenses, and registrations for radiological and non-radiological discharges from the facility and waste handling and disposal activities; analysis and approval of operations involving potential environmental releases and proposed changes to those operations; establishing environmental protection criteria, procedures, and training programs to monitor gaseous and liquid effluents and waste handling and disposal; and monitoring plant compliance with the environmental protection criteria through inspections and audits. The environmental function is administratively independent of production and has the authority to shutdown potentially unsafe operations.

The minimum qualifications for the individual(s) responsible for oversight of the environmental protection function are a BS/BA or advanced degree (masters or doctorate) in science or engineering, and at least three years of experience in applied health physics and/or environmental protection.

The minimum qualifications for an environmental protection specialist are a BS/BA or advanced degree (masters or doctorate) in science or engineering, and at least one year of applied health physics or environmental protection experience.

2.3.4.4 Industrial, Chemical, and Fire Safety Functions The industrial and chemical safety functions have responsibility for industrial hygiene or chemical safety, as defined in Chapter 6; industrial safety; and respiratory protection. Key responsibilities include analysis and approval of operations involving industrial safety and proposed changes to those operations; establishing industrial safety criteria, procedures, and training programs to protect the workers from industrial hazards; and monitoring plant compliance with the industrial safety/hygiene program through inspections and audits.

The fire safety function has responsibility for the fire protection program, as defined in Chapter

7. Key responsibilities include analysis and approval of operations involving fire safety and proposed changes to those operations; establishing fire safety criteria, procedures, and training programs to protect the workers from fire hazards; and monitoring plant compliance with the fire protection program through inspections and audits. The industrial, chemical, and fire safety functions are administratively independent of Production and have the authority to shutdown potentially unsafe operations.

The minimum qualifications for the individual(s) responsible for oversight of the industrial, chemical, and fire safety function(s) are a BS/BA or advanced degree (masters or doctorate),

depending on functional assignment(s), in industrial hygiene, industrial safety, fire protection, or

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-8 other appropriate field, and at least three years of experience related to functional assignment(s).

The minimum requirements for safety specialist positions are a BS/BA or advanced degree (masters or doctorate) with specialized training, depending on functional assignment(s), in environmental health, fire protection, industrial safety/hygiene, chemical safety, or other closely related field, and at least one year of experience related to functional assignment(s).

2.3.4.5 Integrated Safety Analysis Function The integrated safety analysis function has the overall responsibility for the ISA program, as defined in Chapter 3. Key responsibilities include the performance of chemical, radiological, and fire evaluations of applicable SNM operations and proposed changes to those operations; establishing IROFS based on those evaluations; assuring the proper incorporation of IROFS into applicable procedures and work instructions; coordinating updates to the ISA; and monitoring plant compliance with ISA requirements through inspections and audits. The ISA function also has responsibility for managing the Safety Related Equipment program for functionally testing IROFS on a periodic basis, as defined in Chapter 11.

The minimum qualifications for the individual responsible for oversight of the ISA function are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least three years of experience in licensing, regulatory compliance, safety, and/or safety analysis in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear regulatory assignments.

2.3.4.6 Licensing Function The licensing function has overall responsibility for acquiring and maintaining safety-related licenses as required to operate the TRISO-X Fuel Fabrication Facility, as well as the broad responsibility for interface with regulatory agencies.

The minimum qualifications for the individual responsible for oversight of the licensing function are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least three years of experience in licensing, regulatory compliance, safety, and/or safety analysis in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear regulatory assignments.

2.4.3.7 Material Control and Accountability Function The material control and accountability (MC&A) function maintains programs to assure that SNM is received, processed, stored, and transferred in accordance with federal regulations, and implements these functions through the areas of SNM safeguards, SNM accountability, shipping, and receiving.

The minimum qualifications for key MC&A personnel are defined in the Fundamental Nuclear Material Control Plan.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-9 2.3.4.8 Security Function The security function is responsible for implementing the security program as defined in the Physical Security Plan and the Safeguards Information Plan.

The minimum qualifications for key Security personnel are defined in the Physical Security Plan.

2.3.4.9 Emergency Preparedness Function The emergency preparedness function is responsible for implementing the emergency management program as defined in Chapter 8 and the Site Emergency Plan.

The minimum qualifications for key Emergency Preparedness personnel are defined in the Site Emergency Plan.

2.3.5 Quality Assurance The Quality Assurance discipline assesses systematic programs for compliance with documented quality assurance procedures. Applicable programs include indoctrination and training of personnel performing quality-related safety activities; assuring the extent of quality assurance or confidence necessary for quality-related safety structures, systems, and components are specified and followed; and performing audits, surveillances, and assessments of quality-related safety activities. Based on, but not limited to, applicable requirements and guidance in ISO 9001:2015, the quality assurance program is implemented for all phases of the facility including design, construction, operations, maintenance, and decommissioning. The Quality Assurance discipline is administratively independent of operations and has no other duties or responsibilities unrelated to quality assurance that would interfere with carrying out the duties of this discipline. The Quality Assurance discipline retains sufficient authority necessary to cease operations and control further processing in the event of conditions adverse to quality or safety, as noted in Section 2.5.1.

The minimum qualifications for the Quality Assurance discipline manager are a BS/BA or advanced degree (masters or doctorate) in science or engineering and at least five years of experience in quality assurance-related activities in the nuclear industry, a nuclear-related field, and/or relevant non-nuclear quality assurance assignments.

2.4 Safety Review Committee The safety review committee membership includes discipline managers, or individuals responsible for oversight of regulatory affairs functions that meet the qualifications of a discipline manager, of the following disciplines:

Manufacturing; Engineering; Safety & Regulatory; and Safeguards.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-10 The committee is responsible to the plant manager, or the discipline manager authorized to be his/her alternate, who retains overall authority for the approval or disapproval of committee membership and actions.

The authority and responsibilities of the full safety review committee include the following:

Reviewing proposed license changes affecting safety, physical security, emergency preparedness, and/or material control and accountability before the associated license amendment applications are submitted to the NRC.

Reviewing the ALARA program for at least the following:

Trends in air activity, Cumulative exposure, Engineering design and personnel work practices.

Working with the Regulatory Affairs discipline to implement the ALARA program.

Reviewing results of safety inspections, audits, and investigations which the license requires be conducted.

Reviewing all violations of regulations or license conditions having safety significance.

The committee will meet at the following frequencies:

to discuss topics such as proposed license changes - as needed; to discuss ALARA considerations - at least semiannually; to review license-required safety inspections, audits, investigations, and violations of regulations or license conditions - at least quarterly.

Its proceedings, findings, and recommendations will be documented in writing and made available to the plant manager and discipline management. Such reports will be retained for at least five years.

Committee review of matters other than the bulleted items above may be conducted by either individual review or collectively at a meeting; however, individual members of the committee have the authority to request a meeting of the entire committee on any given matter.

2.5 Administration 2.5.1 Reporting of Potentially Unsafe Conditions or Activities Procedures are available for any person at the TRISO-X Fuel Fabrication Facility to report potentially unsafe conditions or activities to the Regulatory Affairs discipline. Prompt reporting is expected so that conditions adverse to safety or quality can be corrected as soon as practicable.

Personnel have the authority to stop work if unsafe conditions or behaviors are observed, or if any aspect of a procedure is unclear or incorrect as written as noted in Section 11.4. The incident investigations and corrective action program is discussed further in Section 11.6.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-11 2.5.2 Management Measures Management measures that ensure the reliability and availability of IROFS are established as described in Chapter 11.

2.5.3 Off-Site Emergency Response Resources Written agreements with off-site emergency response organizations are described in Chapter 8.

2.6 Transition from Design to Construction to Operations The TRISO-X organization as described in Sections 2.2 and 2.3 represents the personnel responsible for safe operations, and the organization is also responsible for providing direct supervision of planning, organizing, and overseeing the construction, installation, initial testing and commissioning of the facility and equipment, including modifications in the future, using written plans and procedures. Construction oversight plans and procedures include description of oversight actions to be performed by TRISO-X personnel for IROFS.

Contractors are required to submit quality programs to TRISO-X for review and acceptance prior to contract award. A quality and technical evaluation is performed based on predetermined criteria specific to the scope of services being provided. For initial facility construction, an architect/engineering (A/E) firm has been contracted to specify facility structures and systems, as well as to ensure the design meets applicable codes and standards. During the construction phase, construction activities and preparation of construction documents are completed using appropriately experienced contractors. TRISO-X oversight of the A/E and construction contracts may involve one or more disciplines/functions depending on the scope of the design or construction activity. TRISO-X, the A/E contractor, and the construction contractor hold regular meetings to ensure project safety, quality, and schedule are appropriately maintained.

Construction oversight is provided by the TRISO-X Engineering, Regulatory Affairs, and QA disciplines. As shown in Figure 2-1, these disciplines report to the plant manager. TRISO-X maintains ultimate responsibility for the safe design, construction, and operation of the fuel fabrication facility.

Construction phase oversight of IROFS is provided by TRISO-X personnel within the Engineering, Regulatory Affairs, and Quality Assurance disciplines that meet the minimum requirements of a BS/BA and/or advanced degree, and at least one year of relevant experience applicable to the technical discipline, scope, and complexity of the construction oversight assignment. When a construction management function is used, the same minimum qualifications apply.

Management of the TRISO-X personnel involved in construction oversight activities is provided by individuals that meet the minimum qualifications in Section 2.3.3, 2.3.4, and 2.3.5.

Oversight activities typically include, but are not limited to, witnessing of construction activities, verifying material inputs, or confirming completion in accordance with stated requirements.

Procedures developed to address the quality assurance elements specified in Section 11.8 apply

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-12 and are appropriately passed down and verified through implementation of the documented oversight plan. If a code, standard, or specification governing a particular element of construction identifies specialty training or experience is required to conduct certain construction oversight activities, appropriate resources will be identified and assigned. Issues, problems or non-conformances identified during construction and testing of IROFS, or other issues that could have an impact on quality, safety, security, and protection of the environment, are referred to the incident investigations and corrective action program as discussed further in Section 11.6.

As the construction of systems is completed, they undergo functional and acceptance testing, as appropriate, in accordance with approved procedures. Following successful completion of testing and commissioning, detailed plans describe the transition from commissioning / start-up phase to operations. An initial assessment of the configuration management program will be conducted prior to start of operations in accordance with the requirements in Section 11.5 for the purpose of evaluating the programs effectiveness and to correct deficiencies. Operational readiness reviews led by the TRISO-X organization are used to confirm the equipment in each process area is functionally tested and ready to operate, items relied on for safety are in place, license-required programs and commitments are implemented, operating procedures are approved, and the assigned staff is trained and ready to safely commence operations when authorized to do so.

During the transition from construction to the commissioning / start-up phase, physical systems and corresponding design information and records will be systematically turned over from the construction contractor(s) to the TRISO-X organization. Following turnover, the manufacturing organization will be responsible for system maintenance and configuration control. The design basis is maintained following the configuration management system described in Chapter 11, Management Measures.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-13 Figure 2-1: Functional Organization Chart Disciplines Functions

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-14 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0002 to header.

Section 2.2 Deleted functional in the second sentence of the first paragraph when describing the organizational disciplines due to TX0-LTR-0022, License Chapter 2 RAI-1 and additional feedback from NRC on 11/15/2024.

Section 2.3 Paragraph 1: Deleted functional when describing the key positions due to TX0-LTR-0022, License Chapter 2 RAI-1 and additional feedback from NRC on 11/15/2024.

Paragraph 3:

Clarified wording due to TX0-LTR-0022, License Chapter 2 RAI-2.

Equivalent experience changes due to TX0-LTR-0022, License Chapter 2 RAI-6.

Type of work experience changes due to TX0-LTR-0022, License Chapter 2 RAI-7. Per additional feedback from NRC on 11/15/2024, added relevant.

Sections 2.3.2, 2.3.3, the 6 subsections of 2.3.4, and 2.4 Due to TX0-LTR-0022, License Chapter 2 RAI-1 and additional feedback from NRC on 11/15/2024, added oversight of to clarify that the qualifications apply to the individual responsible for oversight of the function, and not to all members in the group.

Sections 2.3.1, 2.3.2, 2.3.3, 2.3.4 and related subsections, and 2.3.5 Clarified education requirements to be a BS/BA or advanced degree (masters or doctorate) due to TX0-LTR-0022, License Chapter 2 RAI-6 and RAI-7.

Section 2.3.4 Paragraphs 1 and 2: Changes due to TX0-LTR-0022, License Chapter 2 RAI-4.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-15 Revision Date Section/Page Description of Changes Paragraph 3: Clarifications due to TX0-LTR-0022, License Chapter 2 RAI-5.

Section 2.3.4.3 Changed analyst to specialist to align with Section 2.3.4.4 due to TX0-LTR-0022, License Chapter 2 RAI-1.

Section 2.4 Paragraph 2: Deleted to remove potential conflicts and confusion with the qualifications throughout the rest of Chapter 2 due to TX0-LTR-0022, License Chapter 2 RAI-5.

Paragraph 3: Simplified to cover both membership and actions due to TX0-LTR-0022, License Chapter 2 RAI-5.

Section 2.5.1 Added statement that personnel have the authority to stop work, and improved alignment with Section 11.6, due to TX0-LTR-0022, License Chapter 2 RAI-3.

Section 2.6 Updated construction phase oversight activities for IROFS and experience requirements based on TX0-LTR-0022, License Chapter 2 RAI-8, and TX0-REG-LTR-0041, QA/Mgt Measures RAI 1-1, which was a complete replacement of TX0-LTR-0020, RAI 1-1.

Added new last sentence Issues or problems identified during construction of IROFS are referred to the incident investigations and corrective action program as discussed further in Section 11.6 due to TX0-LTR-0022, Chapter 2 RAI-8 as further discussed with NRC on 11/15/2024.

Figure 2-1 Added dashed lines to distinguish between Disciplines and Functions due to TX0-LTR-0022, License Chapter 2 RAI-1 and additional feedback from NRC on 11/15/2024.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 Section 2.2 Added or quality to conditions adverse to safety based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-20 response.

Section 2.3 Added management determines that based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response.

Section 2.3.2 Revisions based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response and Observation 1.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0002 SNM-XXXX CHAPTER 2 Revision 3 December 2025 Page 2-16 Revision Date Section/Page Description of Changes Section 2.3.3 Revisions based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response and Observation 1 response.

Section 2.3.4 Revisions based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response.

Section 2.3.4.5 Revisions based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response.

Section 2.3.4.6 Revisions based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response.

Section 2.3.5 Revision to first paragraph based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-2 response.

Revision to second paragraph based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-1 response.

Section 2.5.1 Added or quality to conditions adverse to safety based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-20 response.

Section 2.6 Second paragraph revised based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-1 and RAI-4 responses.

Third paragraph revised based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-2 response.

Fourth paragraph revised based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-3 and RAI-20 responses, and TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-3 response.

Fifth paragraph revised based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-12 response.

Sixth paragraph revised based on TX0-REG-LTR-0071 Set 13 RAIs Chapter 2 RAI-4 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-1 INTEGRATED SAFETY ANALYSIS Table of Contents SECTION TITLE STARTS ON PAGE 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 Integrated Safety Analysis (ISA) Program and Commitments Process Safety Information ISA Methods ISA Consequence Determination ISA IROFS Selection and Likelihood Determinations ISA Risk Index Determination ISA Team Qualifications ISA Change Management Additional ISA Program Commitments 3-2 3.2 ISA Summary and ISA Documentation 3-9 3.3 Management Measures 3-10 3.4 Recordkeeping 3-10 3.5 Requirements for New Facilities or New Processes at Existing Facilities 3-10

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-2 INTEGRATED SAFETY ANALYSIS 3.1 Integrated Safety Analysis (ISA) Program and Commitments TRISO-X maintains an ISA for the areas of the facility that involve or could impact the safe handling of SNM in accordance with 10 CFR 70 Subpart H and 10 CFR 70.65(a). The ISA Program establishes and maintains the safety program required by 10 CFR 70.62(a)(1) and consists of the following elements:

1) ISA Program commitments in this chapter,
2) ISA Summary documents, and
3) Supporting ISA information maintained at the facility.

3.1.1 Process Safety Information Process safety information is compiled and maintained in sufficient detail to support the creation and updating of the ISA required by 10 CFR 70.62(b). The compilation of written process safety information includes information on the hazards, materials, technology, and equipment associated with each process. Process safety information can vary depending on the complexity of the operation, but it may include items such as piping and instrumentation diagrams (P&IDs),

flow diagrams, process descriptions, and other aids that allow identification and understanding of the hazards associated with each process.

3.1.2 ISA Methods The ISA conducted and maintained as required by 10 CFR 70.62(c) is a systematic analysis of TRISO-X FFF processes that identifies facility and external hazards and their potential for initiating credible accident scenarios; the consequences and likelihood of the credible accident scenarios; and the items relied on for safety (IROFS) needed to meet the performance criteria specified in 10 CFR 70.61. IROFS will be established and maintained such that they will be available and reliable as needed.

Credible accident scenarios are identified through PHAs using methodologies listed in NUREG-1513, Integrated Safety Analysis Guidance Document, and the method is selected based on the complexity of the process to be analyzed and the severity of the hazards. Hazards reviewed include potential for inadvertent nuclear criticality; radiological exposures; and chemical, fire, and facility hazards that could increase radiological risk. Accident scenarios consider credible deviations from the normal operation of the process and failure of the IROFS for the process being reviewed, including consideration of human actions and errors that could lead to accidents of concern. Facility events external to the process being evaluated are also reviewed.

3.1.3 ISA Consequence Determination For each credible accident scenario, the unmitigated consequences are evaluated using qualitative and/or quantitative methods, such as those described in NUREG/CR-6410, Nuclear

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-3 Fuel Cycle Facility Accident Analysis Handbook. Alternative methods and other industry accepted techniques may also be used to perform consequence calculations, provided the methods are appropriate to the process, the physical setting, and the specific condition being evaluated. Accident scenarios may be grouped if they will result in a similar consequence, such as an indoor spill of uranyl nitrate. Based on the evaluation results as compared to the 10 CFR 70.61 consequence thresholds, each credible accident scenario is assigned a consequence category of Low, Intermediate, or High. Credible accident scenarios with the potential of resulting in a criticality are assumed to be High consequence events. The threshold criteria used to determine if unmitigated accident sequences have the potential to exceed the intermediate or high radiological or chemical consequence levels of 10 CFR 70.61(b) and (c) as summarized in Table 3-1 below.

Table 3-1 10 CFR 70.61 Radiological and Chemical Consequence Exposure Levels Consequence Level Radiological Chemical (Note 1)

Worker Public/Environment Worker Public/Environment High TEDE 100 rem TEDE 25 rem CHEM3 400 mg soluble U CHEM2 30 mg soluble U Intermediate 100 rem >

TEDE 25 rem 25 rem >

TEDE 5 rem 5000 x 10 CFR 20, Table 2, App. B limits averaged over 24-hour period CHEM2

< CHEM3 150 mg and

< 400 mg soluble U CHEM1

< CHEM2 Low

< Intermediate Levels

< Intermediate Levels

< Intermediate Levels

< Intermediate Levels CHEM = AEGL, ERPG, or TEEL Note 1: For chemical consequences, the Acute Exposure Guideline Levels (AEGLs) are used if available. If no AEGLs are available, Emergency Response Planning Guidelines (ERPGs) are used. If no ERPGs are available, Temporary Emergency Exposure Levels (TEELs) are used. If there are no AEGLs, ERPGs, or TEELs available, the ISA Summary identifies the methodology used to determine if the chemical poses an acute hazard. The soluble uranium intake limits are based on 10 CFR 70.61, ISG-14, NUREG-1391, and DOE-STD-1136-2017.

A risk assessment is performed for those credible accident scenarios with Intermediate or High consequences. Qualitative or quantitative risk assessment methods are used to determine the likelihood and risk of each credible accident scenario.

3.1.4 ISA IROFS Selection and Likelihood Determinations

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-4 IROFS are identified to prevent or mitigate each credible accident scenario such that the 10 CFR 70.61 performance criteria are met by Intermediate consequence events being unlikely and High consequence events being highly unlikely as defined in the ISA Summary. IROFS, in preferential order, may be engineered controls (passive or active), enhanced administrative controls (active features that prompt a person to take an action), or administrative controls (actions of people).

The Initiating or Enabling Event Frequency Index is a numerical value assigned to each accident sequence based on a qualitative or quantitative assessment. Methods of likelihood evaluation and definitions of the likelihood terms unlikely and highly unlikely may mix qualitative and quantitative information. Therefore, the frequency index is defined both qualitatively and quantitatively in Table 3-2. The occurrence rate and qualitative description found on the same row apply to the same frequency index in Table 3-2. The Occurrence Rate column provides a quantitative definition, and is intended to be used when quantitative information is available, such as industry acceptable values, analytical data, or vendor failure data. The Qualitative Description column provides a qualitative definition, and is intended to be used when qualitative information is available, such as engineering judgement or past experience. One or both sets of information may be used to determine the frequency index. The index may be one value higher or lower than listed in Table 3-2 with sufficient justification as documented in the NCSE or Risk Assessment document.

Table 3-2 Initiating and Enabling Event Frequency (IE/EE)

Frequency Index Occurrence Rate1 Qualitative Description

-6 10-6/yr Not credible

-4 10-4/yr Physically possible, but not expected to occur, equivalent to no failures in 30 years for hundreds of similar IROFS in industry.

-3 10-3/yr Not expected to occur during the plant lifetime, equivalent to no failures in 30 years for tens of similar IROFS in industry.

-2 10-2/yr Not expected, but might occur in plant lifetime, equivalent to no failure of this type in this facility in 30 years.

-1 10-1/yr A few failures may occur during plant lifetime.

0 1/yr Failures occur every 1 to 3 years.

1 10/yr Several occurrences per year.

1Based on order of magnitude approximation. 10-1/yr or less is -1, 10-2/yr or less is -2, etc.

P-type events are characterized by a probability of failure upon demand (PFOD) and typically include IROFS that are not continuously challenged but that must perform a safety function on demand (subsequent to a process deviation or failure). F-type events are characterized by a

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-5 frequency of occurrence and typically include IROFS that are continuously challenged, rather than those that are required to perform a safety function only when certain conditions are present.

Engineered and administrative controls that are needed to meet the performance requirements of 10 CFR 70.61 are designated as IROFS. Each p-type IROFS is assigned an Effectiveness of Protection Index (EOPI) as specified in Table 3-3. The index is a numerical value assigned to each IROFS based on a qualitative or quantitative assessment representing the credit given to IROFS in accident sequences, considering:

Characteristics of the IROFS used to prevent or mitigate the accident of concern (safety margin, type of control, proper design, independence, reliability, availability, and other management measures)

Evaluation of IROFS failures to ensure that common mode or common cause failures do not exist for accident sequences that involve more than one IROFS.

Industry acceptable values, engineering judgement, analytical data, and past experience The index may be one value higher or lower than listed in Table 3-3 with sufficient justification as documented in the NCSE or Risk Assessment document.

Table 3-3 IROFS Effectiveness of Protection Index (EOPI)

Effectiveness of Protection Index Type of IROFS

-4 Protected by an inspected Passive Engineered Control that meets the additional basis in ISA Summary, Section 5.10.4.2, with management measures applied to ensure availability and reliability.

OR Protected by a Safety Integrity Level (SIL) 4 active engineered control with management measures applied to ensure availability and reliability. SIL 4 rating demonstrated for all components within the IROFS boundary per the methods in IEC 61511-1:2016, which addresses lifecycle phases from initial concept, design, implementation, operation, and maintenance through decommissioning. Supported by a probability of failure upon demand or failure frequency calculation per ISA Summary, Section 5.10.4.1.

-3 Protected by a functionally tested Active Engineered Control with management measures applied to ensure availability and reliability.

Supported by a probability of failure upon demand or failure frequency calculation per ISA Summary, Section 5.10.4.1.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-6 OR Protected by an inspected Passive Engineered Control with management measures applied to ensure availability and reliability.

-2 Protected by a trained operator performing a routine task with an approved procedure; an enhanced administrative control; or an administrative control with margin of safety, independence, and management measures applied to ensure availability and reliability.

-1 Protected by a trained operator performing a non-routine task with approved written instructions.

0 No protection If the initiating event involves a p-type IROFS failure, the Effectiveness of Protection Index per Table 3-3 is modified to take demand rate into account per Table 3-3a.

Table 3-3a Demand Rate Modify Table 3-3 Index Hundreds of times per year (daily)

Increase base index by 2 Tens of times per year (monthly)

Increase base index by 1 Once per year Use base index Once every 10 years Decrease base index by 1 The modified EOPI is then assigned to the IROFS failure rather than the Initiating Event Frequency Index from Table 3-2. The EOPI is modified per Table 3-3a to a maximum frequency index of 0.

The duration of the IROFS failure is also considered based on the Duration Index provided in Table 3-4. The Duration Index is a numerical value assigned based on a qualitative assessment of how quickly the IROFS failure would be discovered considering engineering judgement, design information, past experience, and the associated management measures. The Duration Index is identified as Dur in the risk assessment.

Table 3-4 Duration Index (Dur)

Duration Index Average Failure Duration 1

More than 3 years 0

1 year

-1 1 month

-2 A few days

-3 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-7

-4 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

-5 5 minutes In order to credit a Duration Index of less than -1, one of the following conditions must be satisfied so actions can be taken to address a failed IROFS:

IROFS failure would be easily detected based on its location and type of failure (e.g.,

within frequent travel path).

IROFS failure would be easily detected based on the activity that causes its failure (e.g.,

maintenance activity that causes a release of material from a vessel would be immediately recognized by the personnel performing the work).

IROFS failure is identified by periodic tests or required surveillances corresponding to the selected duration (e.g., shift inspection, functional testing, etc.).

The Likelihood Index is determined by summing the Initiating/Enabling Event Frequency Index numbers, the Effectiveness of Protection Index for each IROFS, and when applicable, the Duration Index assigned to the accident sequence. If an accident sequence uses a Duration Index, the sequence needs to be reversed when the failure of one of the other IROFS can lead to a more positive index (i.e., results in a higher Likelihood Index).

For each accident sequence, the Total Likelihood Index is calculated as:

Likelihood Index T = IE/EE + EOPI for each IROFS + Dur (where applicable)

The Likelihood Category is determined using the Likelihood Index as specified in Table 3-5.

Table 3-5 Total Risk Likelihood Category Likelihood Index (T)

(=sum of index numbers)

Likelihood Category T -4 1

T = -3 2

T > -3 3

3.1.5 ISA Risk Index Determination The Risk Index is determined by multiplying the Likelihood Category (3.1.4) by the Consequence Category (3.1.3). The Risk Index is then compared to the Risk Matrix in Table 3-6 to determine if the Risk Index is acceptable or unacceptable.

Table 3-6 Risk Matrix with Risk Index Values Likelihood of Occurrence

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-8 Severity of Consequences Likelihood Cat. 1 Highly Unlikely Likelihood Cat. 2 Unlikely Likelihood Cat. 3 Not Unlikely Consequence Cat. 3 High Acceptable Risk 3

Unacceptable Risk 6

Unacceptable Risk 9

Consequence Cat. 2 Intermediate Acceptable Risk 2

Acceptable Risk 4

Unacceptable Risk 6

Consequence Cat. 1 Low Below Severity Threshold 3.1.6 ISA Team Qualifications PHAs are conducted by an ISA Team with membership commensurate with the process being reviewed. The team typically consists of a team leader; individuals knowledgeable of the process being analyzed; and individuals representing the safety discipline, including nuclear criticality safety, radiation protection, chemical safety, and fire safety; consistent with 10 CFR 70.62(c)(2).

Team members may represent more than one functional area being evaluated. Disciplines that are not affected by the proposed process or change being evaluated do not require representation on the team.

The team leader is designated as the one member of the team who is knowledgeable in the methodologies used to conduct PHAs and ensures that the team members understand the methodology to be used.

3.1.7 ISA Change Management Changes to the facility or its processes that impact the ISA are evaluated using a configuration management program that meets the requirements of 10 CFR 70.72, as described in Chapter 11, so that the ISA and its supporting documentation remain accurate and up-to-date.

Proposed changes to the facility or its processes are evaluated in accordance with the ISA Methods and ISA Team Qualifications described in this chapter. If a proposed change results in a new credible accident scenario being identified or increases the consequences and/or likelihood of a previously analyzed accident scenario, the existing IROFS and associated management measures are evaluated promptly for adequacy and new IROFS are identified or changes are made, if required. IROFS with unacceptable performance deficiencies, as identified through the corrective action program or during updates to the ISA, are addressed.

The ISA Summary is updated at least annually by January 30th, incorporating changes made in the previous calendar year that affected the ISA Summary. The updated documents or pages are submitted to the NRC per 10 CFR 70.72(d)(3).

3.1.8 Additional ISA Program Commitments

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-9

1. TRISO-X commits to no sole IROFS; therefore, a future change that identifies the need for sole IROFS would result in a departure from the methods of evaluation described in the License Application that establish the design basis and thus requires approval from NRC prior to implementation of this type of change.
2. The definitions of highly unlikely and unlikely in Section 9.0 of the ISA Summary are used to determine the reporting requirements when evaluating a process upset against Appendix A to Part 70 - Reportable Safety Events.
3. Non-criticality accident sequences (chemical, radiological, fire) will be demonstrated to meet one additional order of magnitude beyond the definitions of highly unlikely and unlikely in Section 9.0 of the ISA Summary.
4. Accident sequences that are prevented or mitigated by only administrative controls are addressed in Section 3.5.
5. Human factors principles and practices are applied to enhanced administrative and administrative IROFS to ensure their reliability and availability in accordance with 10 CFR 70.61(e), as described in the ISA Summary.

3.2 ISA Summary and ISA Documentation The ISA Summary contains the following elements as required by 10 CFR 70.65(b):

General description of the site; General description of the facility; Description of facility processes, hazards, and types of accident sequences; Demonstration of compliance with 10 CFR 70.61 performance requirements; Description of the ISA team qualifications and ISA methods; List of IROFS; Description of chemical consequence standards; List of sole IROFS (if any); and Definitions of the terms credible, unlikely, and highly unlikely.

The ISA Documentation includes supporting information such as PHAs, Risk Assessments, Nuclear Criticality Safety Evaluations, Radiological / Chemical Accident Consequence Evaluations, and Fire Hazard Analyses. It also includes any completed 10 CFR 70.72 change management documentation that may not have yet been included in the annual update of the ISA Summary.

3.3 Management Measures Management measures required by 10 CFR 70.62(d) to ensure the reliability and availability of each IROFS are established as described in Chapter 11.

3.4 Recordkeeping

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-10 TRISO-X documentation developed in accordance with Section 3.2 and as required by 10 CFR 70.62(a)(2) are maintained as records. TRISO-X also maintains records of failures of IROFS or management measures required by 10 CFR 70.62(a)(3). The TRISO-X records management program is described in Chapter 11.

3.5 Requirements for New Facilities or New Processes at Existing Facilities As described in Section 11.1.2, design requirements are required to be developed, reviewed, approved, and documented for new facilities and processes/systems before input of SNM. The baseline design criteria identified in 10 CFR 70.64(a) are addressed for IROFS. As required by 10 CFR 70.64(b), the TRISO-X Fuel Fabrication Facility is designed using a defense-in-depth approach for protection against process-related accidents. To the extent practicable, the facility design considers preference for the selection of engineered controls over administrative controls to increase overall system reliability, and features that enhance safety by reducing challenges to IROFS are incorporated. Where facility and system designs rely only on administrative controls, the ISA includes written justification that describes why alternatives to use engineered controls are not practical. The facility design addresses the baseline design criteria of 10 CFR 70.64(a) for new facilities and the control of process hazards.

The ISA Summary provides highly unlikely definitions for credible natural phenomena hazard (NPH) initiating events such as earthquakes, tornadoes, and high winds that could cause adverse damage/consequences. Collapse or loss of the process buildings is considered highly unlikely since the design satisfies American Society of Civil Engineers (ASCE) 7-16, Minimum Design Loads and Associated Criteria for Buildings and Other Structures, structural requirements for a Risk Category IV facility. For tornado wind loads, the process buildings are designed for the tornado load cases in ASCE 7-22 Chapter 32 for a tornado wind speed of 136 mph. This satisfies the performance requirements of 10 CFR 70.61 and the requirement of 10 CFR 70.64(a)(2) for adequate protection against natural phenomena with consideration of the most severe documented historical events for the site.

The design basis earthquake, high wind, tornado, and flooding impacts to process equipment and IROFS within the facility are evaluated by the individual safety evaluations up to the design basis NPH event. If the failure of process equipment to remain in place (i.e., collapse or toppling over) or lose containment could lead to an intermediate or high consequence, sufficient IROFS are established to meet the performance requirements. Generic IROFS designated as Critical Non-Structural Components (CNSCs) may be used, which invokes section C13.1.3 of ASCE 7-16 to ensure the component remains in place by using an Importance Factor of 1.5 to resist the design basis NPH events. This satisfies the performance requirements of 10 CFR 70.61 and the requirement of 10 CFR 70.64(a)(2) for adequate protection against natural phenomena with consideration of the most severe documented historical events for the site.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-11 If a planned new facility and/or new process meets the 10 CFR 70.72 criteria requiring a license amendment, the baseline design criteria of 10 CFR 70.64(a) will be applied to the control of process hazards. A defense-in-depth approach will be applied to higher risk accident sequences as required by 10 CFR 70.64(b).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-12 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0003 to header.

Section 3.1.4, Table 3-2 Updated to reflect qualitative frequency index values and quantitative occurrence rates due to TX0-REG-LTR-0040, Enclosure 1 ISA RAI-7, and Enclosure 4, ISA Summary Section 5.10.1 and Table 5-5.

Added definitions of p-type / f-type events due to TX0-REG-LTR-0040, Enclosure 1 ISA RAI-6, and Enclosure 4, ISA Summary Section 5.10.1.2.

Section 3.1.4, Table 3-3 Added reference to p-type IROFS and quantitative assessments due to TX0-REG-LTR-0040, Enclosure 1 ISA RAI-6 and ISA RAI-8, and, ISA Summary Section 5.10.4.

Added details for the Type of IROFS represented by Effectiveness of Protection Index values of -4 and -3 for passive and active engineered controls due to TX0-REG-LTR-0040, Enclosure 1 ISA RAI-3 and ISA RAI-8, and Enclosure 4, ISA Summary Table 5-6.

Section 3.1.4, Table 3-3a Added new Table 3-3a to modify Table 3-3 if an initiating event involves a p-type IROFS failure due to TX0-REG-LTR-0040, Enclosure 1 ISA RAI-8, and Enclosure 4, ISA Summary Section 5.10.4.3 and Table 5-6a.

Section 3.1.8 Added Additional ISA Program Commitments as agreed to in meetings with NRC on 12/3-12/4/2024 and 12/16/2024 to resolve ISA RAI-5.

Section 3.5 Added where facility and system designs rely only on administrative controls, the ISA includes written justification that describes why alternatives to use engineered controls are not practical due to meetings with NRC on 12/3-12/4/2024 and 12/16/2024 to resolve ISA RAI-5 to align with explanation in NUREG-1520, page 3-21, Item d, paragraph 2.

Natural phenomena event changes due to (1) TX0-REG-LTR-0040, ISA RAI-9 and ISA RAI-10, and Enclosure 4, ISA Summary Section 5.10.1.1; and (2) TX0-REG-LTR-0045, Enclosure 1 Structural RAI-2.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 Section 3.1.8 Revised ISA program commitments 2 and 3 based on TX0-REG-LTR-0079 RAI-1 response.

Added ISA program commitment 5 based on TX0-REG-LTR-0060 RAI-1 response.

Section 3.2 Added risk assessments to examples of ISA documentation based on discussion with NRC during horizontal/vertical slice review meeting on 5/21/2025.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0003 SNM-XXXX CHAPTER 3 Revision 3 December 2025 Page 3-13 Revision Date Section/Page Description of Changes Section 3.5 Revised tornado wind load evaluation based on TX0-REG-LTR-0091 RAI-7 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-1 RADIATION SAFETY Table of Contents SECTION TITLE STARTS ON PAGE 4.1 Radiation Protection Program 4-2 4.2 ALARA Program 4-3 4.3 Organization and Personnel Qualifications 4-4 4.4 Procedures and Radiation Work Permits 4-4 4.5 Radiation Safety Training 4-5 4.6 4.6.1 4.6.2 4.6.3 4.6.4 Ventilation and Respiratory Protection Building / Area Ventilation Localized Ventilation Laboratory Ventilation Respiratory Protection 4-6 4.7 4.7.1 4.7.2 4.7.2.1 4.7.2.2 4.7.2.3 4.7.3 4.7.3.1 4.7.3.2 4.7.3.3 4.7.3.4 4.7.3.5 4.7.4 Radiation Survey and Monitoring Programs Radiation Surveys Dosimetry Program External Dosimetry Internal Dosimetry Air Sampling and Monitoring Program Contamination Control Access Control Surveying of Surfaces Protective Clothing Release for Unrestricted Use Leak Testing of Sealed Sources Environmental Monitoring 4-8 4.8 4.8.1 4.8.2 4.8.3 Additional Program Commitments Records Event Reporting Annual Dose Monitoring Report 4-15 4.9 Criticality Monitoring and Detection 4-15

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-2 RADIATION SAFETY 4.1 Radiation Protection Program TRISO-X has established, maintains, and implements a Radiation Protection Program (RPP) in accordance with 10 CFR 20.1101 that is commensurate with the scope and extent of licensed activities and ensures compliance with applicable sections of 10 CFR 20. The purpose of the RPP is to maintain occupational and public doses below regulatory limits and as low as reasonably achievable (ALARA). Engineered controls (e.g., confinement, ventilation, equipment layout) provide primary radiation protection functions. Additional protection for workers is provided through an effective RPP that focuses on maintaining exposures to ionizing radiation ALARA. The guiding principles and requirements outlined in the RPP are reflected in programs and implementing procedures to ensure that:

Radiation exposure to occupational workers and the public is maintained ALARA, Radiation protection staff are trained and qualified to carry out radiation protection procedures, Work is guided by and supplemented with detailed and effective radiation protection procedures and radiation work permits (RWPs),

Personnel are trained in radiation protection principles, how to use tools and techniques to minimize exposure to radiation, and qualified to properly use Personal Protective Equipment (PPE),

Facility ventilation and containment systems are designed to control airborne concentrations of radioactive material, A radiological survey and monitoring program is in place to document levels of radiation and contamination, and document occupational exposures to radiation, IROFS that limit high and intermediate consequences are identified, are consistent with regulatory performance criteria, have appropriate management measure in place to ensure they are available and reliable, and, Programs and procedures are in place that address records maintenance, corrective actions, and reporting requirements, as described in Chapter 11.

TRISO-X management commitment to keep exposures ALARA is documented in a formal policy statement that holds all levels of management and individual workers responsible for adhering to the companys ALARA policy. To ensure that this commitment is implemented without influence from production demands, the organizational structure reflects radiation protection staff reporting relationships that are independent from the facilitys operations as discussed in Chapter 2. Radiation protection staff have clearly defined responsibilities, and possess the authority, and training, tools and equipment to carry out those responsibilities. As required by

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-3 10 CFR 20.1101(c), the RPP is reviewed on an annual basis and considers changes in the facility, technologies, and processes that could enhance the effectiveness of ALARA implementation.

4.2 ALARA Program ALARA implementation is supported at the highest levels of management through written policy.

These policies provide trained and qualified radiation protection staff with the authority to prevent practices that are not aligned with the ALARA philosophy. Management promotes safety in general, and radiation safety especially, by supporting a culture of interdependence, learning, employee ownership and input that is essential for improving safety and keeping exposures ALARA. Management is committed to providing facilities, operating and maintenance procedures, and equipment that ensures that exposures to radiation are ALARA. Additionally, ALARA principles are integrated into approved policies and procedures and are an integral component in the generation and use of Radiation Work Permits (RWPs).

The ALARA program is one of the several ways RP personnel interact with facility personnel. RP personnel are also involved in the preparation of RWPs. To prepare an RWP, RP personnel must interact with facility personnel to fully understand the activity and facility conditions to assess associated radiological hazards. RP personnel also interact with facility personnel with participating in safety audits.

TRISO-Xs safety review committee, as described in Chapter 2, serves as the ALARA Committee.

ALARA topics are reviewed and discussed at least annually to monitor employee dose and environmental release trends, identify areas for improvement, to set ALARA goals, implement required changes and review ALARA performance.

The Radiation Safety Officer (RSO) is responsible for overall radiation safety and ensuring that exposures are ALARA. Areas of responsibility include:

Involvement in planning routine and non-routine work activities.

Ensuring that work is guided by RWPs that effectively describe work requirements, precautions, and ALARA engineering controls.

Ensuring that radiation protection instrumentation, equipment, and supplies are available, in good working order, and are properly used and maintained according to approved procedures based on manufacturers specifications.

Auditing facility ALARA implementation (as part of the RPP annual review) to include:

o Exposure record review o Radiological inspections (survey results) o Interviews with staff concerning application and implementation of ALARA Evaluating operating and maintenance procedures, equipment and facilities for modifications that could reduce occupational and public exposures.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-4 Tracking facility exposures and trends and proposing corrective actions.

Assuring the proper implementation of radiological work controls.

Evaluating the effectiveness of plans and procedures in maintaining occupational and public doses ALARA.

Radiation protection staff are responsible for overseeing the implementation of ALARA practices on an everyday basis. They are an essential resource for evaluating TRISO-X FFF processes for modifications and improvements for ALARA purposes.

4.3 Organization and Personnel Qualifications Staff that are responsible for the management and implementation of the radiation protection program possess the education and training commensurate with their responsibilities.

Responsibilities, and the authority necessary to implement those responsibilities, are delineated in policies and procedures. The management system and administrative procedures, including radiation protection staff education, experience, and training requirements are detailed in Chapter 2.

4.4 Procedures and Radiation Work Permits Approved RPP implementing procedures incorporate radiation protection requirements found in 10 CFR 19, 20, 70, and 71, and other applicable regulations. The RPP is implemented through approved radiation safety procedures and inclusion of radiation protection requirements in operating procedures, equipment maintenance procedures, and RWPs to alert workers to special hazards or controls necessary for their protection. Radiation protection and ALARA principles are integrated into all facility process and maintenance procedures. The RSO reviews and approves all radiation protection procedures. As described in Chapter 11, the facility Document Control Process ensures that procedures are promptly modified when there are changes in technology or practices and guides procedure authorization and distribution. Training specifically addresses procedural changes. The following is a general (not comprehensive), list of tasks or topics associated with radiation safety for which procedures are established.

Measuring and reporting occupational dose Measuring and reporting dose to the Public Radiation Surveys and Monitoring Posting and Labeling Access Control Air Sampling/Monitoring Care and Use of PPE Receiving and Opening Packages Storage and Control of Licensed Material Waste Management and Disposal

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-5 Issuance and Termination of RWPs Investigation levels and action guides for external and internal exposure The RWP system is documented in radiation protection procedures and are issued for specific tasks and for a specified period-of-time. The RSO (or designee) must review and approve RWPs.

The RWP describes the tasks, work area known or potential radiological conditions, access, monitoring, and PPE requirements, and any special conditions or precautions. RWPs are posted at the work site, and personnel assigned to work under the RWP review the requirements prior to entry into the area.

4.5 Radiation Safety Training TRISO-X management provides an effective radiation safety training program that meets regulatory requirements, that ensures that the working environment is safe, and ensures that employees and visitors understand the risks associated with exposure to radioactive materials.

Training programs are designed and implemented to comply with the requirements of 10 CFR Parts 19 and 20. Chapter 11, Management Measures, addresses the training that ensures that administrative control IROFS are available and reliable.

Regulatory guidance used to develop the Radiation Protection Training Program includes:

ANSI/HPS N13.36-2001 Ionizing Radiation Safety Training for Workers NCRP Report No. 134 Operational Radiation Safety Training ASTM E1168-95 (R2008) Radiological Protection Training for Nuclear Facility Workers Regulatory Guide 8.10, Rev. 2, August 2016, Operating Philosophy for Maintaining Occupational and Public Radiation Exposures As Low As Is Reasonably Achievable Regulatory Guide 8.13, Rev. 3, June 1999, Instructions Concerning Prenatal Radiation Exposure Radiation Safety Training is applied commensurate with radiation protection responsibilities.

Levels of training are based on regulatory requirements, the potential for radiation exposure, and the complexity of the task. Training and qualification of workers; including site orientation, general employee, radiation worker, radiation safety technician, and specialty training is provided commensurate with the hazard and planned activities. The level of training reflects prior training, personnel that are responsible for supervising others, and personnel that are directly or continuously supervised. To facilitate feedback that could assist in keeping exposures ALARA, training for Health Physics personnel responsible for performing surveys includes specific training on process related operations and tasks. Refresher training is provided every three years and addresses changes in policies, procedures, requirements, and the facility ISA.

A formal review and evaluation of the radiation protection training program for accuracy, effectiveness, and adequacy of the curriculum and instructors is performed at least every three years.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-6 Training is provided to all personnel and visitors entering restricted areas that is commensurate with the potential radiological health risks associated with that individuals responsibilities.

Training incorporates, where appropriate, the provisions in 10 CFR 19.12, and also includes, but is not limited to, training on the following topics.

Radiation hazards and health risks, Radiation Safety principles, policies, and procedures, Safe storage, transfer, and handling of radioactive materials, Maintaining Radiation Dose ALARA, Access, egress controls, and escort procedures, Contamination control procedures, and PPE, ALARA and exposure limits, Internal and external exposure control and monitoring, Radiation exposure reports to individuals, Monitoring instruments, Emergency response, and Reporting responsibilities.

Further information on the training program is found in Chapter 11.

4.6 Ventilation and Respiratory Protection The TRISO-X FFF designs incorporate ALARA principles for confinement and ventilation systems to limit airborne contamination levels. Engineered controls and features minimize potential inhalation of radioactive and other hazardous materials under all normal operating conditions; therefore, for normal operations, respiratory protection is not required. Equipment is maintained and tested to ensure systems operate when required and are within their design specifications, as described in Chapter 11. If engineering controls are not practical or feasible (certain maintenance operations for example) and the potential exists for levels of radioactive material to exceed those that define an airborne radioactivity area, monitoring is increased and intakes are limited by either control of access, limiting exposure times, or the use of respiratory protection.

4.6.1 Building / Area Ventilation Barriers in the form of containment, ventilation, and filtration are designed to reduce discharges of radioactive material to ALARA levels. Appropriately sized ventilation is provided in areas of the facility where the potential exists for airborne concentrations of radionuclides to exceed the Derived Air Concentration (DAC) values during normal operations based on the dose coefficient values in ICRP Publication 68. The design of the confinement ventilation system ensures the desired airflow during normal operations. Air that is recirculated is filtered through at least one stage of HEPA filtration.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-7 The confinement and ventilation systems include the following critical design characteristics and functional measurements.

(1) Air flows are in the direction from areas with lower levels of potential contamination to areas with a higher potential for contamination.

(2) Areas where fume hoods and glove boxes are located are maintained at a negative pressure with respect to atmosphere during normal operation conditions.

(3) Ventilation ducts are designed to minimize accumulations of radioactive material.

(4) Fans are provided with variable frequency drives to allow maintenance of the flowrate as filter loading increases, and redundant capacity to service the full design load.

Measurements are made to ensure that noise from the fans does not interfere with the ability to hear audible alarms.

(5) Process area air filtration includes a pre-filter bank and a HEPA filter bank in series. HEPA filters have 99.97% efficiency to filter out 0.3-micron particles from the air stream and fire resistance rating of UL 586. Filters are placed to facilitate maintenance and repair, and where possible, bag-in/out type filter housings are used to lessen personnel exposures.

4.6.2 Localized Ventilation Where necessary, enclosures (i.e., hoods, gloveboxes, downdraft tables) or other localized ventilation designs are used to prevent the spread of airborne contamination within the facility and further limit the potential for intake by inhalation. In process areas, the design criteria for inward air flow through the open face of a containment enclosure used to handle radioactive material which has a propensity to suspend in air is at least 125 (+/-25) linear feet per minute (LFM). For operations, the inward air flow is maintained at least 100 (+/- 20) LFM.

For openings used to transfer containerized material or equipment, or for open face enclosures where excessive air flow interferes with sensitive analytical equipment or manufacturing process steps, the proper average face velocity and minimum rate of flow is established in approved procedures. Process enclosure air (from hoods, gloveboxes, etc.) is exhausted through the primary HEPA filter units to the atmosphere through monitored facility vent stacks.

The velocity of airflow at the entrance of all hoods and other enclosures and capture points are evaluated on a scheduled basis. Devices are provided to measure the differential pressure within a containment enclosure with respect to the outside atmosphere, except in containment enclosures where the nature of an operation makes this requirement impractical for processing purposes. Corrective action will be taken as soon as possible if the airflow is found to be deficient.

Processes will cease operation in an enclosure if the average face velocity falls below 100 LFM, or if operability of enclosures is impaired.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-8 4.6.3 Laboratory Ventilation In laboratory areas, the design criteria for inward air flow through the open face of a containment enclosure used to handle radioactive material which has a propensity to suspend in air is in accordance with ANSI/AIHA Z9.5-2012 recommendations. The proper average face velocity and minimum rate of flow is established in approved procedures.

Any ventilated containment with an open door or port through which uncontainerized radioactive material is routinely handled is subject to these requirements; however, the intermittent opening of a door, glove port, etc. for the sole purpose of adding or removing containerized material or equipment does not constitute handling radioactive material with a propensity to suspend in air. In addition, any ventilated containment with an opening to the room which is high efficiency particulate air (HEPA) filtered for exhaust or over-pressurization protection is excluded from inward air flow requirements.

4.6.4 Respiratory Protection When it is impractical to apply process or other engineering controls to limit concentrations of uranium in the air below those defined in 10 CFR 20.1201(e), other precautionary procedures, such as increased surveillance, limitation of exposure times, or provision of respiratory protective equipment are used to keep the intake of uranium by any individual within regulatory limits.

The respiratory protection program is developed according to the requirements detailed in 10CFR20 Subpart H - Respiratory Protection and Controls to Restrict Internal Exposure in Restricted Areas. Appropriate protection factors consistent with 10 CFR 20 Appendix A are applied when calculating intake or the Committed Effective Dose Equivalent (CEDE).

Approved procedures guide the selection, fitting, issuance, maintenance, testing, training of personnel, monitoring, and recordkeeping for individual respiratory protection equipment and for specifying when such equipment is to be used. These procedures are revised to reflect changes in processes, the facility, or equipment that are significant enough to impact respirator use. Records are maintained as described in Chapter 11.

The Respiratory Protection Program requires that individuals must be medically qualified, trained (to include proper donning and doffing), and quantitatively fit tested to a specific respirator prior to initial use and on an annual basis. Procedures and training, as described in Chapter 11, include requirements for cleaning, inspection, and replacement of respirator parts.

4.7 Radiation Survey and Monitoring Programs The facility RPP procedures detail a comprehensive survey program that implements operational surveys for radiological control. Operational surveys characterize workplace conditions, verify the effectiveness of engineering and administrative controls, evaluate changes in radiological conditions, identify areas requiring radiological posting, and assess radiological conditions during the performance of work. Training for Health Physics personnel responsible for performing

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-9 surveys ensures that RP personnel are sufficiently familiar with process activities so that precautions can be taken to minimize exposures.

Regulatory requirements related to monitoring are contained in 10 CFR 20 Subpart C, Occupational Dose Limits; Subpart D, Radiation Dose Limits for Individual Members of the Public; and Subpart F, Surveys and Monitoring. Facility programs, policies and procedures guide the types of surveys, monitoring (including the air sampling and dosimetry programs), and evaluations for compliance with these subparts.

Types of surveys include external dose rate surveys, surface contamination surveys, air concentration surveys, surveys of personnel, PPE, equipment, waste, packages, and on containment/ventilation systems. Minimum survey and monitoring frequencies are shown in Table 4-1 which was developed from Appendix B Reg Guide 8.24. Health Physics staff ensure that signs, labels, signals, other access controls, required notices to employees, copies of licenses, and other items are properly posted, legible, and operative, as required by 10 CFR Part 19, Notices, Instructions, and Reports to Workers: Inspection and Investigations, and 10 CFR Part 20 or specific license conditions.

Radiation survey and monitoring procedures address the procedure objectives, sampling processes, data analysis, equipment and instrumentation, measurement frequency, records, and reporting requirements, and required actions when measurements exceed regulatory or administrative or action levels. Survey documentation is retained in accordance with 10 CFR 20.2103. Survey and monitoring records are reported as mandated in 10 CFR Part 19 and 10 CFR Part 20 using the processes described in implementing procedures.

An adequate number of Radiological Protection instruments are maintained and used to perform radiological surveys and provide the necessary analytical results. Radiation Protection instrumentation includes: installed instrumentation such as a Criticality Accident Alarm System, Continuous Air Monitors, and Area Radiation Monitors; laboratory instrumentation such as Gas Flow Proportional Monitors for smear and air sample counting; stationary contamination monitors such as Hand and Foot Monitors, and Personal Contamination Monitors; and an array of portable instrumentation for radiation and contamination monitoring (alpha scintillators, beta-gamma plastic scintillators, Geiger-Muller type instruments, ionization chambers, and neutron counter). Available instruments are designed and manufactured to detect the radiation types of concern for the facility and that exhibit the level of sensitivity necessary to detect radiation at or below applicable action levels.

All radiation protection instrumentation is subject to a routine maintenance and calibration program to ensure that properly calibrated and operable instruments are available for use by health physics staff. Instrumentation is calibrated annually or following maintenance to NIST traceable standards and according to manufacturers recommendation. All instrumentation is source checked prior to each day of use. The quality control requirements for operability checks are detailed in implementing procedures.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-10 4.7.1 Radiation Surveys The Health Physics Staff perform preoperational, routine, and special surveys of facility areas. All areas in which radioactive materials are stored or processed are identified prior to operations.

Surveys are performed to identify areas in which personnel monitoring would be required according to the requirements of 10 CFR 20.1502(a)(1). The frequency and scope of routine surveys where radioactive materials are stored or processed, and where workers have access, are based on radiological content and potential dose rates.

4.7.2 Dosimetry Program The dosimetry program incorporates measurements of external exposure, internal exposure, and air sampling data to complete the dose record for each monitored employee. The dose record is compared to the dose limits specified in Subpart C of 10 CFR 20. If engineering controls are not adequate to limit exposures to below regulatory levels, additional procedures such as limiting exposure time to licensed material or use of respiratory protection are implemented.

The External Dosimetry Program establishes the criteria for participating in the program, identifies target radiation types, establishes monitoring methods, assessments and recording criteria, specifies the dosimetry required, use, processing and evaluation, and documents administrative investigation and action levels.

The Internal Dosimetry Program is designed in compliance with 10 CFR 20.1201 Occupational Dose Limits for Adults, 10 CFR 20.1204 Determination of Internal Exposure, and the participation levels detailed in 10 CFR 1502(b) for adults, minors, and pregnant women. The program establishes the criteria for participating in the program, identifies the types of sampling, frequency of measurement and required detection levels, details the methods for measuring, assessing and recording intakes, details the evaluation and interpretation of the analytical results, and documents the facility investigation and action levels.

The monitoring requirements in 10 CFR Part 20 are summarized in Table 4-2. In accordance with the requirements of 10 CFR Part 20.1202, the TEDE is calculated by adding the Deep Dose Equivalent (DDE) to the CEDE for each person who requires both internal and external dose monitoring. The TEDE will not exceed the 10 CFR Part 20 dose limits. Investigation levels and action guides for external and internal exposure are established in RPP procedures. Work activity restrictions are imposed when an individuals exposure exceeds 80 percent of the applicable 10 CFR 20.1201 limit.

4.7.2.1 External Dosimetry Monitoring for exposure to external radiation is established according to the requirements in 10 CFR 20.1502(a) if external occupational dose is likely to exceed 10% of the dose limit appropriate for the individual (adult, minor, or declared pregnant woman). External radiation monitoring is also provided according to 10 CFR 20.1502(a)(3) for any individual entering a high or very high radiation area (areas requiring HRA and VHRA posting are not anticipated at the TRISO-X FFF).

Beta-gamma sensitive thermoluminescent type dosimeters (TLDs) capable of measuring deep

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-11 dose to the whole body, shallow dose to the skin or extremities, and dose to the lens of the eye are individually assigned for routine external exposure monitoring based on work area surveys, occupancy time, or other exposure information such as area monitor results. Personnel dosimeters, with sensitivities and exchange frequencies that are appropriate for the source term, are provided and processed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited dosimetry vendor or supplier. Other types of dose measuring devices may be used including electronic dosimeters, direct-reading dosimeters, extremity dosimeters, neutron dosimeters and/or measurements made with portable radiation surveys instruments.

4.7.2.2 Internal Dosimetry The TRISO-X internal dosimetry program establishes and manages a bioassay program to monitor and evaluate intakes from uranium, distributions of uranium within the body following intake, and the resulting radiation doses or possible chemical effects. The bioassay measurements are used to confirm the adequacy of radiological controls and to determine compliance with the occupational dose limits.

Facility personnel likely to receive greater than 10% of the applicable Annual Limit on Intake (ALI) values are monitored for intakes of radioactive material. Intakes are assigned to individuals based on air sampling (described in Section 4.7.2.3), urinalysis and/or in vivo lung counting.

Intakes are converted to committed dose equivalent (CDE) and committed effective dose equivalent (CEDE) for the purposes of limiting and recording occupational doses The appropriate routine bioassay frequency is based on (1) the potential exposure of the individual, (2) the retention and excretion characteristics of the radionuclide, (3) the sensitivity of the measurement technique, and (4) the acceptable uncertainty in the estimate of intake and committed dose equivalent. Bioassay measurements used for demonstrating compliance with the occupational dose limits are conducted often enough to identify and quantify potential exposures and resultant intakes that, during any year, are likely to collectively exceed 0.1 times the ALI. Table 4-3 lists the minimum bioassay frequencies for bioassay program participants.

Further evaluation, such as examination of airborne measurements or additional bioassay measurements, to obtain the best estimate of actual intake is performed if results exceed 0.02 times the annual limit on intake (ALI), or 40 derived air concentration (DAC) hours.

Urine sample concentrations are analyzed by either Kinetic Phosphorescence Analyzer (KPA) or Inductively Coupled Plasma Mass Spectrometry (ICPMS). Action levels are established in RPP procedures to prevent an individual from exceeding the occupational exposure limits specified in 10 CFR 20 and to protect against toxicological damage to the kidney. Control actions include temporarily restricting the individual from working in an area containing airborne radioactivity, and actions are taken as necessary to assure against recurrence. Nasal, saliva, urine and/or fecal samples, or in vivo chest counts may be collected from individuals when action limits are exceeded. Approved procedures define when referral to the corrective action program, as described in Chapter 11, is required.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-12 Bioassay results are interpreted using industry standard methods and consensus models and may make use of incident-specific data and/or an exposed individuals personal characteristics.

4.7.2.3 Air Sampling and Monitoring Program Air sampling is performed in all areas of the facility where dispersible forms of licensed materials are handled, stored, or processed and where concentrations of airborne radioactive materials could exceed 10% of a DAC. Air sampling is performed to evaluate airborne hazards whenever respiratory protective equipment is used to limit inhalation intakes, to evaluate containment and for posting airborne areas, to identify if an intake occurred and estimate the magnitude, and to provide an early warning of elevated air concentration.

As described in Chapter 1, the DAC is based on ICRP 66 and 68 which assumes an Activity Median Aerodynamic Diameter (AMAD) of 5 micrometers. If appropriate, TRISO-X may elect to adjust ALI and DAC values based on measured particle size data for particles that are larger than 5 AMAD.

Air sampling is performed using fixed-location samplers for basic evaluation of the exposure of workers, personal (lapel) samplers for supportive measurements and special studies, and air monitors for early warning of unexpected releases. Continuous air monitoring (CAMs) is performed where there is a reasonable potential for unintended releases to cause an intake exceeding 40 DAC-hours in a week or less. Placement of air sampling and monitoring equipment is based the purpose of the measurement (estimating worker intakes, verifying confinement of materials is effective, providing warning, detecting leaks, or determining if an airborne radioactivity area exist) and on airflow studies to determine the airflow patterns in the workplace and optimal placement of monitors. Alarm set points for CAMs meet radiation protection objectives, are defensible and documented, and are set as low as practical for the work being conducted without causing excessive false alarms.

Fixed air sampling results, lapel or other special air sampling results may be used to determine worker intake and to calculate CEDE in areas for which internal dose assessment is required.

Where air sampling is used to comply with 10 CFR 20.1502(b) for measuring intake, evaluations demonstrate that the sampling is representative of the air breathed by the worker or correction factors applied where appropriate.

Air sampling frequency is performed in accordance with Table 4-1, Minimum Survey Frequency.

At a minimum, areas posted as Airborne Radioactivity Areas have air samples changed at least once per day when production is ongoing in those areas. Other contaminated areas where licensed materials are handled, but are not Airborne Radioactivity Areas, and where the airborne levels could average greater than 10% DAC, have air samples changed weekly when work with licensed materials is ongoing. Air sampling and monitoring equipment such as continuous air monitors, portable high volume and/or lapel air samplers may be utilized where a fixed air sampling network is not practical.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-13 Quality Assurance/Quality Control measures include periodic calibrations, and daily source and background checks. Airflow meters are calibrated according to manufacturer guidelines at least annually, and whenever repair or modification warrant.

Action levels for air sample results are established and documented in the RPP implementing procedures. Action levels are established associated with investigation, work suspension, and work restriction levels and their associated corrective actions. A measurement indicating an intake equal to or greater than 10 milligrams of Type F uranium in a week will result in a work restriction based on chemical toxicity limits.

4.7.3 Contamination Control Contamination is controlled at the TRISO-X FFF by containment enclosures and ventilation and supplemented by area classification and access control associated with radiological postings, routine surveillance, protective clothing for personnel, and training.

4.7.3.1 Access Control All areas that store, handle or process radioactive materials are classified as a Radiologically Controlled Area (RCA). Change facilities are provided for personal clothing, showering, and donning PPE. Areas within the RCAs are further controlled for access and egress as buffer areas, or for levels of radiation, contamination, or airborne contamination in accordance with the posting requirements in 10 CFR 20. Radiological postings inform workers of radiological conditions and requirements for entry/exit. Step-off pads and monitoring instruments are provided at PPE doffing locations.

4.7.3.2 Surveying of Surfaces A routine contamination control program is established to evaluate and control surface contamination and to prevent unnecessary external or internal exposure of personnel to radiation. Surveys are performed on personnel leaving areas in which contamination could be present, materials and equipment designated for release from controlled areas, and on in-coming and out-going shipments containing radioactive material.

Routine surface contamination control surveys are performed for process and manufacturing areas, warehousing, and support facilities where licensed materials are stored, handled, or processed. Uncontrolled areas inside the facility are also surveyed periodically to ensure that radioactive materials are adequately confined in the RCAs. Minimum survey frequencies are presented in Table 4-1. Areas in which the potential for surface contamination is high, or the probability for human intake from resuspension is high, are surveyed more frequently.

Standardized methods for collecting and analyzing smear samples are established and employed to aid in comparison and establish trends for facility and equipment and material surveys. A diagram of each routinely surveyed area is used for recording survey results. Methods and instruments used for counting samples of removable surface contamination can detect alpha radiation from uranium at and below the levels specified in Appendix A, Acceptable Surface

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-14 Contamination Levels, to Regulatory Guide 8.24. Regulatory Guide 8.24 Appendix A is incorporated as Attachment 1.

The RPP requires that administrative action guidelines be established to assure that contamination levels and employee exposures are kept ALARA and within regulatory limits.

Action guidelines are established to ensure appropriate corrective actions are taken for contamination control. Approved procedures detail the action guidelines, required actions to promptly address the contamination to a satisfactory resolution (cleaned or contained and labeled), and when referral to the corrective action program, as described in Chapter 11, is required.

4.7.3.3 Protective Clothing PPE is required to minimize opportunities for personnel and their clothing to become contaminated. Protective clothing requirements are commensurate with anticipated work conditions. Monitors are available in areas where workers doff PPE to perform a survey (especially head, hands, and other exposed portions of the body) after they remove PPE and before they leave the RCA. Clothing surveyed and found to have less than 200 disintegrations per minute (dpm) per 100 cm2 of uranium contamination is acceptable outside restricted areas.

Reasonable efforts are made to reduce skin contamination to background levels.

Decontamination attempts under the direction of the radiation safety staff or medical consultant are repeated until (1) such attempts cease to achieve significant reductions, or (2) such attempts threaten to damage the skin, at which point the individual will be released from the RCA.

Subsequent measurements will be made on the area to evaluate contamination levels over time.

Exceptions may be made for emergencies and emergency drills.

4.7.3.4 Release for Unrestricted Use Equipment, materials, and facilities that are evaluated for both fixed and removable contamination using guidance in Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct, Source or Special Nuclear Material as described in Chapter 1, and that do not exceed the levels represented in Appendix A, Acceptable Surface Contamination Levels, to Regulatory Guide 8.24, may be released from restricted areas for unrestricted use (see Attachment 1).

Equipment and materials may be transferred between restricted areas through an un-restricted area if the exterior surfaces of the item or its container have smearable contamination levels less than Attachment 1 levels. When contaminated items are transferred through un-restricted areas, the route will minimize transfer time and the possibility of accidental release.

4.7.3.5 Leak Testing of Sealed Sources Non-exempt sealed sources used for calibration and quality control procedures are leak tested in accordance with Appendix C, Leak Test Requirements, of Regulatory Guide 8.24. Regulatory Guide 8.24 Appendix C is incorporated as Attachment 2.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-15 4.7.4 Environmental Monitoring Effluent and environmental radiation monitoring are addressed in Chapter 9 of this application.

4.8 Additional Program Commitments The following sections provide commitments to achieve compliance with the regulations in 10 CFR 20, Subpart L, 10 CFR 20, Subpart M, Reports and 10 CFR 70.74.

4.8.1 Records In accordance with 10 CFR 20, Subpart L, Records, TRISO-X maintains records of the RPP, including but not limited to, occupational exposure of personnel to radiation, releases of radioactive materials to the environment, radiation survey results, and results of corrective action program referrals, radiation work permits and planned special exposures. Records associated with ALARA findings, employee training, personnel radiation exposures, and environmental activities are generated and retained in such a manner as to comply with the relevant requirements of 10 CFR 20 as part of the records management program described in Chapter 11.

4.8.2 Event Reporting Approved procedures require reporting to the NRC, within the time specified in 10 CFR 20, Subpart M, Reports, and 10 CFR 70.74, any event resulting in an occupational exposure to radiation exceeding the dose limits in 10 CFR 20. Approved procedures contain instructions for when and how to report events to the NRC.

4.8.3 Annual Dose Monitoring Report An annual report of the results of individual monitoring, as required by 10 CFR 20.2206(b), is submitted to the NRC.

4.9 Criticality Monitoring and Detection The TRISO-X FFF criticality accident alarm system (CAAS) is designed, and a documented evaluation is maintained, to demonstrate that the system meets the requirements of 10 CFR 70.24, as well as ANSI/ANS-8.3-1997 (R2017), Criticality Accident Alarm System, with exceptions as noted in Regulatory Guide 3.71, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores, Revision 3 (2018). Monitoring is performed using radiation detectors (e.g., gamma, neutron) that are proportional to dose levels and not subject to the effects of saturation.

The criticality detection system consists of three essential parts: the readout module, alarm relay module, and the detectors. The detector collects light, or a charge caused by incident radiation.

This light or charge is then conditioned and transmitted via multiconductor cable and displayed on the readout module.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-16 A calibration check is performed for all units in service based on detector manufacturers recommendations or if system monitoring indicates anomalous detector response, however not to exceed 5 years. Detectors are also response tested in accordance with internal procedures to ensure continued operability. Periodically, the alarm is sounded for familiarity, training, or drills.

Alarm audibility (e.g., siren, lights) is tested in accordance with approved procedures.

To meet regulatory requirements in 10 CFR 70.24 and to assure a limited number of false alarms, the system is set up with at least two detectors at each designated monitoring location. Alarm actuation is caused by at least two detectors at a location exceeding their alarm trip point, or by a single detector failure coupled with the second detector in alarm, which results in a plant-wide evacuation and worker accountability. The same logic would apply to a system with three detectors, with two of three alarming. Detector or other electronic component failure will result in a warning signal. This signal will initiate contingency measures which may include evacuation of personnel, suspension of operations, deployment of auxiliary monitoring equipment, and/or immediate system repair. The system is also provided with a backup power supply.

The placement of the radiation detectors and determination of alarm setpoint(s) are discussed in Chapter 5, Section 5.4.1.1. Alarm set points may vary due to ambient radiation levels and measurement uncertainty. The set point minimizes alarm from sources other than criticality.

When the alarm setpoint has been reached or exceeded, the system will produce an alarm throughout the facility which will continue regardless of the radiation level until manually reset.

The alarm control and relay cabinets have limited access. Manual initiation of the alarm system is provided for testing. A warning signal is generated at the central control unit in the event of a detection system malfunction. Provisions are incorporated into the alarm system to allow appropriate testing and remote readouts are present at the central/secondary alarm stations that will alert personnel in the event of component failure.

The system is demonstrated to respond to a minimum criticality accident of concern. The minimum accident of concern produces an absorbed dose of 20 rad in soft tissue, unshielded, at 2 meters within one minute. Detector placement is chosen based on the detector setpoint that would effectively detect the minimum accident of concern

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-17 Table 4-1: Minimum Survey Frequencies FACILITY AREAS EXTERNAL RADIATION SURVEYS AIR SAMPLING REMOVABLE SURFACE CONTAMINATION SURVEYS Uranium receiving, warehousing, and shipping Monthly Continuous air sampling; samples changed weekly and following any indication of release leading to airborne concentrations of uranium Monthly and following any indication of release Manufacturing processing areas, scrap recovery, waste handling, maintenance, and change rooms Monthly Continuous air sampling; samples changed each shift, following any change in equipment or process control, and following detection of any event that may have released uranium Weekly and following any indication of release Laboratories Monthly Continuous air sampling; samples changed each shift Weekly Final fuel form packaging and storage Monthly Continuous sampling; samples changed weekly Monthly Lunchrooms, cafeterias, snack bars, and vending machine areas Quarterly None Monthly

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-18 Table 4-2: Summary of 10 CFR 20.1502 Monitoring Requirements The use of individual monitoring devices for external dose is required:

For adults who are likely to receive an annual dose in excess of any of the following (each evaluated separately):

0.5 rem (0.005 Sv) deep-dose equivalent.

1.5 rems (0.015 Sv) eye dose equivalent.

5 rems (0.05 Sv) shallow-dose equivalent to the skin.

5 rems (0.05 Sv) shallow-dose equivalent to any extremity.

For minors who are likely to receive an annual dose in excess of any of the following (each evaluated separately):

0.05 rem (0.5 mSv) deep-dose equivalent.

0.15 rem (1.5 mSv) eye dose equivalent.

0.5 rem (0.005 Sv) shallow-dose equivalent to the skin.

0.5 rem (0.005 Sv) shallow-dose equivalent to any extremity.

For declared pregnant women who are likely to receive an annual dose from occupational exposure in excess of 0.05 rem deep-dose equivalent, although the dose limit applies to the entire gestation period.

Individuals entering a high or a very high radiation area.

Internal exposure monitoring (not necessarily individual monitoring devices) is required:

For adults likely to receive in 1 year an intake in excess of 10% of the applicable ALIs for ingestion and inhalation.

For minors and declared pregnant women likely to receive in 1 year a committed effective dose equivalent in excess of 0.05 rem (0.5 mSv).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-19 Table 4-3: Routine Minimum Bioassay Frequencies from ANSI/HPS N13.22-2013 Bioassay Programs for Uranium, Table 8 Minimum Frequencies of Bioassay 10 CFR 20 Solubility Class Situation Urine In-vivo D

Radiological Monthly Not normally used W

Radiological Quarterly Annually Special Y Radiological Quarterly Annually Y

Radiological Not normally used Annually D and W Chemical Toxicity Monthly Annually for Class W Fecal bioassay sampling is performed as needed for all Classes to address special situations such as incident / accident investigations.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-20

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-21

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0004 SNM-XXXX CHAPTER 4 Revision 3 December 2025 Page 4-22 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0004 to header.

4.6.1 Removed and later from discussion of ICRP 68 based on changes from TX0-REG-LTR-0029, Chapter 4 RAI-10.

4.7.2 Added statement Work activity restrictions are imposed when an individuals exposure exceeds 80 percent of the applicable 10 CFR 20.1201 limit. Based on changes from TX0-REG-LTR-0029, Chapter 4 RAI-9.

4.7.2.1 Added statement that personnel dosimeters have sensitivities and exchange frequencies appropriate for the source term. Based on changes from TX0-REG-LTR-0029, Chapter 4 RAI-9.

Table 4-3 Simplified note below table to state sampling is performed as needed for all classes to align with bioassay technical basis.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 Section 4.5 Revised third paragraph to remove graded approach based on TX0-REG-LTR-0089 RAI-5 response.

Section 4.9 Revised discussion of CAAS alarm setpoints based on TX0-REG-LTR-0077 RAI-20 response.

Revised discussion of minimum criticality accident of concern based on TX0-REG-LTR-0077 RAI-19b.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-1 NUCLEAR CRITICALITY SAFETY Table of Contents SECTION TITLE STARTS ON PAGE 5.1 Nuclear Criticality Safety Program and Philosophy 5-2 5.2 5.2.1 5.2.2 5.2.3 Organization and Administration of the NCS Program NCS Program Objectives NCS Program Commitments ANSI/ANS-8 Series Standards Implementation and Exceptions 5-3 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 5.3.9 5.3.10 Management Measures Applied to the NCS Program General Management Measures Employee Training Training and Qualifications of NCS Staff Auditing, Assessing, and Upgrading the NCS Program Procedures NCS Reviews of New or Modified Equipment Posting of Nuclear Criticality Safety Limits ISA Process and ISA Summary Corrective Action Program Records Management 5-6 5.4 5.4.1 5.4.1.1 5.4.2 5.4.3 Emergency Notification, Planning, and Response Criticality Accident Alarm System (CAAS)

CAAS Methodology Portable CAAS Emergency Management 5-9 5.5 5.5.1 5.5.2 5.5.3 Methodologies and Technical Practices Means of Control Methods of Control Computer Codes and Associated Safety Limits 5-11 5.6 Sources of Criticality Data and Analytical Techniques 5-21 5.7 Requirements for New Facilities or New Processes at Existing Facilities 5-22

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-2 NUCLEAR CRITICALITY SAFETY 5.1 Nuclear Criticality Safety Program and Philosophy TRISO-X provides an effective nuclear criticality safety (NCS) program, including methodologies and technical practices, to support safe operation of the TRISO-X FFF. Controls and barriers that are designated as Items Relied on for Safety (IROFS) to prevent an inadvertent nuclear criticality are documented in NCS Evaluations (NCSEs) or in supporting Risk Assessment Evaluations for the respective NCSE and the Integrated Safety Analysis (ISA) Summary as appropriate.

TRISO-X provides for the appropriate management of the NCS program. The responsibilities and authorities of individuals that develop and implement the NCS program are also provided in Chapter 2. In addition, facility management measures are provided that support implementation and maintenance of the NCS program.

Subcriticality is maintained for all normal and credible abnormal conditions as required by 10 CFR 70.61(d). The Double Contingency Principle of ANSI/ANS-8.1-2014 (R2018), Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, formulates the preferred basis for the design and operation of special nuclear material (SNM) processes within the TRISO-X FFF.

To support this overarching requirement, process designs incorporate sufficient factors of safety and controls provide sufficient redundancy and diversity to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible. The focus should be on understanding each credible change in process conditions and implementing the best overall control strategy to maintain subcriticality such that no single credible event or failure will result in a criticality accident. The NCSE will also document the basis that a change in a process condition is unlikely. When considering NCS accident sequences, guidance from Appendix A, ANSI/ANS-8.1-2014 (R2018), is used to support the evaluation of typical changes in process conditions.

All credible events in which criticality is possible will be documented to be highly unlikely as required by 10 CFR 70.61(b) per the ISA risk assessment methods described in Chapter 3. While the double contingency principle is not used to demonstrate compliance with 10 CFR 70.61(b),

the criticality safety controls, the basis for the independence of controls, and the demonstration of subcriticality from the analysis may be used as input to the ISA risk assessment.

TRISO-X FFF relies on passive, active, enhanced administrative, and administrative controls to maintain subcriticality. Where practicable, reliance is placed on passive equipment designs to maintain subcriticality rather than on administrative controls.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-3 5.2 Organization and Administration of the NCS Program TRISO-X provides an NCS program with sufficient resources to implement and maintain an effective program. The TRISO-X NCS program meets the regulatory requirements of 10 CFR 70 to ensure adequate protection against the consequences of accidental criticality events. The primary means of doing this is prevention by ensuring that processes remain subcritical under normal and credible abnormal conditions.

5.2.1 NCS Program Objectives The TRISO-X NCS program includes the following objectives:

1. Perform and document NCS evaluations for new or changed processes and establish safety limits, controls, and procedures as necessary to ensure that processes will remain subcritical under normal and credible abnormal conditions.
2. Establish, as practicable, double-contingency protection and defense-in-depth measures; ensuring sufficient margins of safety and subcriticality to provide additional assurance that the likelihood of criticality will be acceptably low.
3. Establish and maintain a Criticality Accident Alarm System (CAAS) and emergency-response procedures to protect health and safety in the event criticality occurs.
4. Provide technical support to emergency response personnel in responding to and recovering from abnormal conditions and emergencies up to and including a criticality accident.
5. Verify the adequacy of NCS controls through audits and assessments of operations including verification of equipment configuration(s).
6. Ensure adequacy of NCS evaluations through peer reviews, assessments, and validation and verification of calculational methods.
7. Train and otherwise support operations in procedure development and implementation to ensure the safe handling of special nuclear material.
8. Support regulatory compliance regarding event reporting (10 CFR 70.50 and Appendix A to 10 CFR 70), comply with the facility change process (10 CFR 70.72), and participate in the performance and documentation of the facilitys ISA (10 CFR 70.61 through 70.66) insofar as they pertain to criticality safety.

5.2.2 NCS Program Commitments The TRISO-X NCS program shall meet the requirements of 10 CFR 70. The objectives of the program include:

1. An NCS program structure that is consistent with current industry practice as defined in ANSI/ANS-8.1-2014 (R2018) and ANSI/ANS-8.19-2014 (R2019), Administrative Practices for Nuclear Criticality Safety, including establishing the roles and responsibilities of key program personnel. Information regarding TRISO-X organization and administration is described in Chapter 2. Chapter 2 also includes the organizational positions, functional responsibilities, qualifications, and authorities of NCS management and staff who develop, organize, implement, and administer the NCS program.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-4

2. Establish and maintain NCS safety limits, controls, procedures, and any NCS operating limits established for IROFS in fissile material processes and maintain management measures to ensure their continued reliability and availability to perform their intended safety function when required.
3. Support operations personnel through development of training, preparation of NCS postings, and other appropriate operator aids for key administrative controls (e.g.,

painted lines on the floor and warning lights), and review of procedures and operations to ensure they are unambiguous, easily understood, and readily achievable.

4. Evaluate modifications to the facility or safety program to ascertain their impact on criticality safety.
5. Require personnel to report defective NCS conditions to operations supervision and the NCS function. Management policies reinforce operators stop-work authority and encourage the reporting of defective conditions.
6. Render processes safe or suspend operations upon loss of double contingency protection until such protection can be restored and assess the adequacy of the affected controls.
7. Controls are established on system parameters to preclude changes in process conditions.

Controls needed to meet the performance requirement of 10 CFR 70.61(b) per the ISA risk assessment methods described in Chapter 3 are designated as IROFS in accordance with 10 CFR 70.61(e).

8. The condition resulting from the failure of a leg of double contingency has been shown to be subcritical with an acceptable margin (e.g., keff is less than USL, parameters are within subcritical limits specified in the license or endorsed standards).
9. Controls are sufficiently reliable to ensure that each change in process conditions necessary for criticality is unlikely. Management measures are established to ensure that they are available and reliable to perform their safety function.

5.2.3 ANSI/ANS-8 Series Standards Implementation and Exceptions The table below provides the ANSI/ANS-8 series standards, with exceptions as applicable, that are implemented through the TRISO-X NCS program:

ANSI/ ANS-8 Standard Exceptions 8.1-2014 (R2018), Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors Exception as noted in RG 3.71, Rev. 3, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores 8.3-1997 (R2017), Criticality Accident Alarm System Exception as noted in RG 3.71, Rev. 3, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-5 ANSI/ ANS-8 Standard Exceptions 8.5-1996 (R2017), Use of Borosilicate-Glass Raschig Rings as a Neutron Absorber in Solutions of Fissile Material None 8.7-1998 (R2017), Nuclear Criticality Safety in the Storage of Fissile Materials None 8.14-2004 (R2016), Use Of Soluble Neutron Absorbers In Nuclear Facilities Outside Reactors None 8.19-2014 (R2019), Administrative Practices for Nuclear Criticality Safety Sections 7.4, 7.5, and 8.2, the description of before the start of operation is interpretated to mean prior to first or the initial start of an operation.

8.20-1991 (R2020), Nuclear Criticality Safety Training None 8.21-1995 (R2011), Use Of Fixed Neutron Absorbers In Nuclear Facilities Outside Reactors None 8.22-1997 (R2016), Nuclear Criticality Safety Based on Limiting and Controlling Moderators None 8.23-2019, Nuclear Criticality Accident Emergency Planning and Response Exception as noted in RG 3.71, Rev. 3, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores 8.24-2017, Validation of Neutron Transport Methods for Nuclear Criticality Safety Calculations Exception as noted in RG 3.71, Rev. 3, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores for Section 6.1.3

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-6 ANSI/ ANS-8 Standard Exceptions 8.26-2007 (R2016), Criticality Safety Engineer Training and Qualification Program Section 7.4, Hands-on experiments, is defined as a shall and is excepted since applicable courses may not be available; however, acceptance is based on candidates experience with enriched uranium operations, including the development of nuclear criticality safety evaluations and calculations, as well as providing field support (including implementation and inspection activities) under a documented NCSP.

5.3 Management Measures Applied to the NCS Program 5.3.1 General Management Measures Information regarding management measures programs is described in Chapter 11. These programs include the management measures identified in 10 CFR 70.62 used to implement and maintain the NCS program.

5.3.2 Employee Training TRISO-X complies with the requirements of ANSI/ANS-8.19-2014 (R2019), and Section 7 of ANSI/ANS-8.20-1991 (R2020), Nuclear Criticality Safety Training, as they relate to NCS training.

Training is provided to all personnel to recognize the Criticality Accident Alarm System (CAAS) signal and to evacuate promptly to a safe area. In addition, TRISO-X employees receive instruction training regarding the NCS Policy. Refer to Chapter 11 for additional discussion about training personnel regarding procedural compliance, stop-work authority, response to alarms, and reporting of defective conditions.

5.3.3 Training and Qualifications of NCS Staff A formal training and qualification program is implemented and maintained for NCS staff consistent with guidelines presented in ANSI/ANS-8.26-2007 (R2016), Criticality Safety Engineer Training and Qualification Program, excluding Section 7.4. Elements of the program include on-the-job training, off-site NCS-related training courses, and mentoring by senior NCS engineers.

5.3.4 Auditing, Assessing, and Upgrading the NCS Program TRISO-X complies with the requirements of ANSI/ANS-8.19-2014 (R2019) and ANSI/ANS-8.1-2014 (R2018) as it relates to NCS review of operations and NCS program audits. Review of site operations involving SNM are performed on a scheduled basis as defined in written approved procedures to confirm that activities are being conducted in accordance with nuclear criticality

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-7 safety requirements including limits and controls. Further detail on audits and assessments is provided in Chapter 11.

Operation Reviews NCS operation reviews are conducted for SNM processing and storage areas / facilities that are evaluated under the scope of an NCSE. The purpose of the review is to ensure that process conditions have not changed to such a degree that an NCS evaluation is affected, and to ensure that appropriate procedures are being followed. NCS operation reviews are performed such that all processes and areas are reviewed within a given calendar year, except when a process or area has been identified to have a low criticality safety risk. This identification of low risk and justification for a review frequency that is less than a given calendar year, is documented in the operation review and/or approved procedures.

NCS Program Audits NCS program audits are performed in accordance with Section 11.5.1 on a triennial basis with a focus on evaluating the effectiveness of the NCS program. NCS program elements are reviewed to ensure that the NCS program continues to meet relevant ANSI/ANS-8 series standard requirements, meet license commitments, and identify areas for improvement. Audits may be performed under a formal QA program, as directed by that function, or under the scope of the nuclear criticality safety program.

NCS Compliance Audits As part of the audits and assessments program described in Chapter 11, NCS compliance audits are conducted on a scheduled basis as defined in approved procedures. These audits are performed such that SNM processing and storage areas / facilities evaluated under the scope of an NCSE are reviewed at least triennially. The purpose of an NCS compliance audit is to determine that: (a) operations are conducted in compliance with license conditions, operating procedures, and posted limits; (b) administrative controls and postings are consistent with NCSEs; (c) equipment and operations comply with NCSEs; and (d) corrective actions relative to findings of NCS inspections are adequate. The audit period for an area is based on its respective NCSE implementation date, and subsequent revisions will extend the audit period into its next cycle.

Independent Assessments An independent assessment of the nuclear criticality safety program is conducted in accordance with Section 11.5.2 on at least a triennial frequency. The independent assessment of the NCS program involves review by an external organization or external NCS professionals. The assessment evaluates the effectiveness of the NCS program by review of a representative sampling of NCS program elements used to implement standard requirements, license commitments, and industry best practices. The triennial independent assessment frequency is chosen such that sufficient time has elapsed to allow corrective actions to be fully implemented and tested prior to subsequent independent assessments. The triennial frequency is further

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-8 supported by TRISO-X review of related ANSI/ANS-8 series standards associated with the NCS Program on a triennial frequency.

Findings and observations from NCS reviews, audits, and assessments are entered into the corrective action program and tracked until closure as described Chapter 11.

5.3.5 Procedures TRISO-X commits to the requirements of ANSI/ANS-8.19-2014 (R2019) as it relates to operating procedures. As described in Chapter 11, procedures are provided for activities involving SNM, and the procedures incorporate safety limits and controls as appropriate. These procedures are reviewed and approved by the NCS function. During the review and approval process, the NCS staff may recommend or require modifications to the procedures to reduce the likelihood of occurrence of an inadvertent nuclear criticality.

5.3.6 NCS Reviews of New or Modified Equipment Each proposed addition of new equipment or change to existing equipment used in the processing or storage of SNM, and any procedure changes resulting therefrom, is reviewed and approved by the NCS function as part of the ISA and Configuration Management processes described in Chapters 3 and 11. During the review and approval process, the NCS staff may recommend or require modifications to the design and/or to the procedures to reduce the likelihood of occurrence of an inadvertent nuclear criticality. NCS calculations and evaluations are incorporated into the configuration management program.

5.3.7 Posting of Nuclear Criticality Safety Limits NCS requirements issued by the NCS function for each process system are made available to work areas in the form of written or electronic operating procedures. Clear, visible signs or notices may be posted at workstations or floor areas may be marked, as appropriate, to supplement the procedures by emphasizing specific limits and controls.

Posted nuclear criticality safety requirements and limits are defined by the nuclear criticality safety function and include, as appropriate:

1. Limits on material types and forms;
2. Allowable quantities by mass or number of items/containers;
3. Allowable enrichments;
4. Limits on reflecting materials;
5. Required spacing between units;
6. Control limits, when applicable, on quantities such as moderation, concentration/density, and the presence of additives.

5.3.8 ISA Process and ISA Summary Refer to Chapter 3 for a discussion of the ISA process, including process hazard analyses and ISA Summary revisions.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-9 5.3.9 Corrective Action Program A corrective action program is implemented to document and manage NCS-related problems, observations, findings, investigations, corrective actions, and any unacceptable NCS-related performance deficiencies. Refer to Chapter 11 for a discussion of the corrective action program.

5.3.10 Records Management Records of the NCS program are retained in accordance with the regulatory retention program.

These records include NCS calculations and evaluations and documentation of corrective actions taken. Refer to Chapter 11 for a discussion of the records management program.

5.4 Emergency Notification, Planning, and Response 5.4.1 Criticality Accident Alarm System (CAAS)

A criticality accident alarm system (CAAS) is designed and installed to provide prompt detection and annunciation of an inadvertent nuclear criticality. The system utilizes an audible (e.g., siren) and/or visual signal (e.g., building entry and high-noise areas) to alert personnel in the area to evacuate and deter personnel from entering after an evacuation. The system is designed, and a documented evaluation is maintained, to demonstrate that the CAAS meets the requirements of 10 CFR 70.24, as well as ANSI/ANS-8.3-1997 (R2017), Criticality Accident Alarm System, with exceptions as noted in Regulatory Guide 3.71, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores, Revision 3.

The system is designed to remain operational during credible adverse events, and the system will alarm during credible failure modes. In the event of loss of normal power, emergency power is automatically supplied to the CAAS. Refer to Chapter 4 for a description of the CAAS.

If the CAAS is out of service, coverage is lost for an SNM operation, or system components are being tested or repaired, compensatory measures are established to ensure the safety of personnel, as documented in a written approved procedure. The method of ensuring personnel safety is process dependent. Compensatory measures may include the following: suspended or limited movement of SNM in the affected area, limited personnel access, use of temporary detection equipment for personnel that must access the area during a CAAS outage, monitoring of the criticality alarm panel, and/or allowing a batch-in-process to run to completion prior to shutting down equipment. Compensatory measures appropriate to protect personnel safety will remain effective until CAAS operation is restored. Compensatory measures and required evacuation procedures are approved and documented.

Employees and visitors are trained in responding to the CAAS annunciation. An ongoing aspect of this training is a quarterly annunciation on all shifts in which SNM operations are being conducted.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-10 In accordance with 10 CFR 70.24, CAAS coverage is required for all activities in which the inventory of fissile materials in individual unrelated areas exceeds 700 g 235U or more than 350 g 235U if moderators/reflectors more effective than water are present with the exception of the exemption provided in Chapter 1. CAAS coverage requirements for an SNM operation are documented during the process for NCS evaluation.

In addition, areas that involve less than 350 g 235U, natural uranium, or that meet the exemption in Chapter 1 do not require an NCSE and do not require CAAS coverage.

5.4.1.1 CAAS Methodology The CAAS system uses gamma radiation detectors with placement based on the minimum accident of concern (MAOC). The MAOC is a bare uranium-bearing (20 wt.% 235U) spherical mass that produces a dose of 20 Rad, neutron and gamma, absorbed in soft tissue at 2 meters, from an unshielded source, for a period of 1 minute. Detector placement is established to provide coverage of all floor space between neighboring CAAS detection clusters assuming an alarm setpoint of 20 mRad/hour at the CAAS detector, within the established special nuclear material operations areas.

Any of the methodologies presented in the following references may be used for determining the placement of CAAS detectors:

Swapped Source: A Forward Calculation Technique to Help Establish the Worst-Case Accident Location for CAAS Detectors in Fixed Locations, C. E. Gross et al, 2018 Generalized CAAS Probe Positioning Methodology for a variety of Fissile Material Processes ", Adrien Gallozzi-Ulmann, ICNC 2023 proceedings Criticality Accident Alarm System Modeling for the Uranium Processing Facility, M.

Buttrey, ICNC 2023 ORNL/TM-2013/211, Guide to Performing Computational Analysis of Criticality Accident Alarm Systems, Thomas M. Miller et al 5.4.2 Portable CAAS In the event an SNM operation requiring CAAS coverage is performed beyond the detection range of the established CAAS or CAAS coverage for an SNM operation is determined to not be available, a portable unit may be used to provide coverage. The portable unit has equivalent detection capabilities as the permanently installed units, however alarm annunciation is limited to the immediate area. Compensatory measures (e.g., use of facility public address system, and/or radio communication) are established to ensure prompt evacuation of personnel as documented in an approved procedure.

5.4.3 Emergency Management Refer to Chapter 8 for a discussion of the emergency management program and emergency plan.

Refer to Chapter 4 for a discussion of accident dosimetry. Guidance from ANSI/ANS-8.23-2019,

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-11 Nuclear Criticality Accident Emergency Planning and Response, is also used for nuclear criticality accident emergency planning and response.

5.5 Methodologies and Technical Practices 5.5.1 Means of Control The relative effectiveness and reliability of controls are considered during the nuclear criticality safety analysis process. Engineered controls or design features are preferred over administrative controls. Passive engineered controls or design features are preferred over all other system controls and are utilized when practicable and appropriate. Active engineered controls are the next preferred method of control. Administrative controls are the least preferred method of control; however, when administrative controls are deemed necessary, enhanced administrative controls are preferred over administrative controls.

1. Passive engineered controls (most preferred) use fixed design features or devices to maintain safe process conditions. No human intervention or action is required.

Assurance is maintained through initial verification prior to operation. Periodic inspections are performed on those systems where credible changes in equipment dimensions may occur as determined by nuclear criticality safety evaluations. Assurance is also maintained through the configuration management program.

2. Active engineered controls use add-on, active hardware (e.g., electrical, mechanical), or moving parts to maintain safe process conditions. No human intervention or action is required during operation. Assurance is maintained through initial and periodic inspection, functional testing, and/or calibration. Active engineered controls detect an undesirable change in process conditions and automatically secure the system to a safe condition.
3. Enhanced administrative controls rely on human judgment, training, and personal responsibility for implementation and are augmented by warning devices (visual or audible) which require human action according to procedure. A visual or audible alarm alerts the operator to an undesirable change in process conditions, which requires human action or intervention in accordance with approved procedures to maintain or return the process to a safe condition. Alarm integrity and reliability is ensured by initial and periodic inspection or functional testing.
4. Administrative controls (least preferred) rely on human judgment, training, and personal responsibility for implementation when the control function is needed. The control is a procedural human action that is required to maintain safe process conditions. Assurance is maintained through periodic verification, audit, or training.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-12 5.5.2 Methods of Control The following recognized control methods are also referred to as parameters, which may be controlled for nuclear criticality safety purposes (i.e., controlled parameters). When evaluating an SNM-bearing system for criticality safety, the procedure for preparation of an NCSE requires that each of the controlled parameters will be assumed to be at their optimum credible condition (i.e., most reactive credible condition) unless controls, including passive design requirements, are specified, and implemented to limit the parameters to certain values. When computer codes are used to determine the safety of a system, the values meet the keff limits of this chapter. Criticality safety may also be based on data or methods provided in industry accepted handbooks, reference documents, and/or experimental data. Maximum subcritical values may be used as provided in handbooks or standards (e.g., maximum subcritical values provided in ANSI/ANS-8.1).

1. Geometry - Geometry control is achieved by increasing neutron leakage by limiting the dimensions of defined geometrical shapes. Equipment relying upon favorable geometry for control include adequate factors of safety to ensure reliability under credible accident conditions. Before beginning an operation, all dimensions relied upon for geometry control are verified. The facility configuration management program is used to maintain these dimensions. Periodic inspections are performed on those systems where credible changes in equipment dimensions may occur as determined by nuclear criticality safety evaluations.
2. Spacing (or Unit Interaction) - Spacing (or Unit Interaction) control is a method of limiting the introduction of neutrons leaked from one SNM unit into a neighboring SNM unit by controlling the separation distance between units. Where spacing control is required, a passive engineered device (e.g., a spacer, fixed bumper, or permanent floor mounting) is the preferred method of control and is used where practicable. The structural integrity of any spacers/racks should be sufficient for normal and credible abnormal conditions. If not practicable, administrative controls may be utilized and should include such items as procedural instructions, postings, and visual indicators, as appropriate.
a. Equipment, facilities, and individually subcritical units are effectively non-interacting or neutronically isolated when their surfaces are separated by any of the following:
i. A 12-inch-thick layer of water, or ii. A thickness equivalent to a 12-inch thick layer of water, or iii. 12 feet of air, or iv. Sub-arrays separated by not less than the smallest dimension of the facing surfaces of the sub-arrays, or
v. The greatest distance across an orthographic projection of the largest of the fissile accumulations on a plane perpendicular to the line joining their centers, or vi. 12 inches of solid concrete (block or poured).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-13

b. The design conditions for interaction between multiple units or between arrays that experience neutron interaction will be based on values that can be demonstrated safe by one of the following methods:
i. Solid Angle Method ii. Surface Density Method iii. Areal Density - When criticality safety is contingent only upon maintenance of a limited areal density of fissile material, controls will be implemented to ensure that the limit is not exceeded. The controls will limit the areal density to a safe value, which is defined to be no more than 45 percent of the minimum critical areal density.

iv. Monte-Carlo Calculations (Each application of Monte-Carlo calculations must comply with the requirements of this chapter).

v. American National Standard, ANSI/ANS-8.7-1998 (R2017), Nuclear Criticality Safety in the Storage of Fissile Materials vi. NRC and/or DOT packaging or transportation regulations (e.g., staging of packages in accordance with the Criticality Safety Index)
3. Volume - Volume control is a method of limiting the volume of SNM to an acceptable value. Equipment relied upon for volume control includes adequate factors of safety to ensure that a safe volume is maintained under credible accident conditions. Prior to the equipment being released for use, the volume of the equipment is verified. The facility configuration management program is used to maintain the volume. Periodic inspections are performed on those systems where credible changes in equipment volume may occur as determined by nuclear criticality safety evaluations. When the solution volume is measured (i.e., quantity of solution), appropriate instrumentation is used.
4. Neutron Absorber (Fixed/Soluble) - Neutron absorber control is a method of reducing the number of neutrons in a fissile material system available to cause a fission event, by introducing a parasitic neutron absorber (i.e., neutron poison) into the system. This method of control includes use of fixed or soluble neutron absorbers. When evaluating absorber effectiveness, neutron spectra are considered (e.g., cadmium is an effective absorber for thermal neutrons, but ineffective for fast neutrons).

Fixed neutron absorber control is a method of increasing neutron absorption in material by placing a solid absorber (i.e., poison) in the system that may include the use of "poison fixtures" as well as taking credit for the neutron absorption properties of structural materials. For fixed neutron absorbers, the thickness of the absorber is measured and documented prior to first use. The composition of the absorber will be verified unless the chemical properties of the materials consist of standard structural materials (e.g.,

stainless steel, carbon steel, etc.). Controls, as necessary, are exercised to maintain the continued presence and the intended distribution and contribution of the absorber.

If fixed neutron absorbers are used, the requirements of ANSI/ANS-8.21-1995 (R2011),

Use Of Fixed Neutron Absorbers In Nuclear Facilities Outside Reactors, are applied. If

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-14 borosilicate glass Raschig rings are used, the requirements of ANSI/ANS-8.5-1996 (R2017),

Use Of Borosilicate-Glass Raschig Rings as a Neutron Absorber In Solutions Of Fissile Material, are applied. If soluble neutron absorbers are used, the requirements of ANSI/ANS-8.14-2004 (R2016), Use Of Soluble Neutron Absorbers In Nuclear Facilities Outside Reactors, are applied. Fixed neutron absorber, including a moderator, use is prevalent in fissile material shipping containers and further subject to the requirements as specified in the package NRC certificate of compliance for use in the TRISO-X FFF.

5. Piece Count - Piece count is a method of limiting fissile material mass and/or geometry by limiting the number of containers and/or components with known amounts of SNM and/or fixed geometries at a given location.
6. Mass - Mass control is a method of limiting the amount of SNM at a given location to an acceptable value. Mass control may be used on its own or in combination with other control methods. When a given mass of material has been determined, a percentage factor is used to determine the mass percentage of SNM in that material. When fixed geometric devices are used to limit the mass of SNM, a conservative process density is used. When overbatching of SNM is credible, the largest mass resulting from a single failure is shown to be subcritical. Overbatching beyond double batching should be considered unless it requires multiple independent failures or is precluded by equipment capacity, availability of material, or other considerations. When the mass is measured, appropriate instrumentation is used (e.g., scales, non-destructive assay equipment).
7. Moderation - Moderation control is a method of limiting or excluding either interstitial (i.e., within the SNM) or interspersed (i.e., between SNM units) moderating materials or both. TRISO-X complies with the requirements of ANSI/ANS-8.22-1997 (R2016), Nuclear Criticality Safety Based On Limiting And Controlling Moderators, as it relates to limiting and controlling moderators. Nuclear criticality safety based on control of moderation requires that sources of moderation be identified and controlled. When designing physical structures for moderation control, the design should preclude the ingress of moderation. When developing firefighting procedures for use in a moderation-controlled area, restrictions should be placed on the use of moderator material. After evaluating all credible sources of moderation for the potential for intrusion into a moderation-controlled area/workstation, the ingress of moderation is precluded or controlled. When moderation is measured, the measurement is obtained by using instrumentation, calculation, or by visual inspection as appropriate. In addition, when the NCS organization requires samples to be taken and analyzed by the laboratory (e.g., wt. % H2O) to determine compliance with moderation limits, dual independent sampling methods will be employed. Shipper information may also be used as a basis for moderation content.
8. Concentration - Concentration control is a method of measuring and controlling the concentration of SNM in hydrogenous liquids to an acceptable value. When

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-15 concentration control is utilized in an unfavorable geometry system, the concentration is determined by appropriate sampling and analysis techniques (e.g., dual independent sampling) and by instrumentation which has been properly maintained and calibrated (e.g., in-line monitor) prior to transfer to the unfavorable geometry system. The analysis will consider the solubility limits of the SNM composition and possible concentrating mechanisms (e.g., precipitation, evaporation, freezing, settling, chemical phase change) and controls are established, as necessary, to prevent or provide margin for such mechanisms. When a tank containing concentration-controlled solution is used, the tank is maintained closed to prevent unauthorized introduction of precipitating agents which could change the concentration.

9. Material Composition - Material composition (e.g., material type, density, heterogeneity, etc.) control is based on consideration of the physical, chemical, and/or nuclear properties of a material such that the 235U density and neutron scattering/absorption of other materials within the compound are identified and understood (e.g., metal versus oxide versus nitrate, etc.). Manufacturing variability and measurement uncertainty are considered when using material specification as a method of control. Possible misidentification is considered for feed materials when using the feed material specification as control. Heterogeneous effects are only relevant for low-enriched (less than 6.0 wt. %) uranium processes, where all other parameters being equal, heterogeneous systems are more reactive than homogeneous systems, however this trend is not prevalent at 20 wt. % and the homogeneous modeled system is bounding for enrichments greater than 20 wt. %. With regard to density, when the density is measured, the measurement is obtained by the use of appropriate instrumentation.
10. Enrichment - Enrichment control utilizes the inherent differences in critical attributes (critical dimensions, mass, etc.) of uranium at different enrichments of 235U. The most limiting enrichment is applied to all SNM or enrichment segregation is provided with physical barriers and other administrative requirements to prevent inadvertent migration of higher enriched material to designated lower enriched processing containers or areas.

When the enrichment needs to be measured, the measurement is obtained by using appropriate instrumentation (e.g., lab analysis, non-destructive assay equipment).

11. Reflection - Reflection control is a method of control which limits neutron return to an SNM-bearing system. Refer to the following reflection requirements:
a. General Reflection Requirements Conservative reflection conditions are established when evaluating the criticality safety of individual units or arrays. If reflection conditions are uncontrolled, the maximum credible amount of water reflection (as established below) is considered when calculating system reactivity. Under certain conditions, however, materials such as concrete, carbon, and polyethylene may be more effective reflectors than water. The thickness and location of these types of

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-16 reflectors are considered if any are present in thickness or quantity that exceeds the equivalent water reflection modeled. If it is credible for reflection conditions to exceed those used in the analysis of system reactivity, then reflection controls are implemented to maintain conditions to within the bounds of the analysis.

Where positive barriers are used to maintain reflection control, the barriers are maintained through the configuration management and maintenance programs.

In all cases, the impact of standard reflection conditions (e.g., the maximum credible amount of water reflection presented by adjacent water bodies) should be evaluated to determine if the presence of standard reflector conditions reduces system reactivity by decreasing interaction.

b. Single Portable Units A single unit (e.g., container) is shown to be subcritical when reflected by at least 30 cm of close-fitting water unless:
i. reflector(s) more effective than water are within 30 cm of the unit, or ii. where 30 cm of close-fitting water reflection is not credible, or iii. reflection controls are implemented to maintain conditions to within the bounds of the analysis.

When reflectors more effective than water are within 30 cm of a single unit, the thickness and location of these reflectors are considered in the modeled configuration. When a reflector is offset from a single unit, subcriticality will be demonstrated for the thickness and material of the reflector at no more than the offset distance. Subcriticality for single unit reflection may be demonstrated with calculations or by reference to documented subcritical values (e.g., maximum subcritical values provided in ANSI/ANS-8.1).

c. Multiple Portable Containers Unless controls are implemented to limit reflection, evaluation of multiple portable units (e.g., multiple containers) must be shown to be subcritical with at least a 15 cm thick, 183 cm tall, and 38 cm wide close-fitting water cuboid, representing a nearby operator, on one side of the containers, and at least 1.27 cm of tangential water reflection on the remaining vertical sides of the containers, representing operator hand contact. These reflectors are modeled as slabs or a box that is tangential to the group of containers, or as a tangential annulus around the group of containers.
d. Enclosures/Gloveboxes Subcriticality of enclosures is demonstrated with the accessible outer front, back, and sides of the enclosures reflected by at least 2.5 cm of close-fitting water. In addition, a minimum of at least two water cuboids (each cuboid consisting of a 15 cm thick, 183 cm tall, and 38 cm wide or equivalent block) representing nearby

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-17 operators should be placed near components(s) in the system such that system reactivity is expected to be maximized. The thickness and location of reflectors that may be more effective than water (e.g., concrete, carbon, and polyethylene) should be evaluated in the model if they are located within 60 cm from the front, back, sides, and top of the enclosure or within 90 cm from the bottom of the enclosure.

Overall enclosure reactivity is calculated with portable containers (e.g.,

containers) located in positions expected to maximize system reactivity, considering any fixed spacing controls that may be present in the enclosure. At a minimum, at least one unit in the glovebox should be evaluated with vertical reflection provided by hands (1.27 cm thick water) in the glovebox (e.g., portable containers, equipment).

e. Arrays of Items Arrays (one or more units spaced in one or more dimensions) of interacting items (e.g., columns, storage racks) are demonstrated to be subcritical using a minimum of at least two water cuboids (each cuboid consisting of a 15 cm thick, 183 cm tall, and 38 cm wide or an equivalent water body, sized to maximize reflection, that is at least 15 cm thick) representing nearby operators, should be placed near components(s) in the system such that system reactivity is expected to be maximized. The thickness and location of reflectors that may be more effective than water (e.g., concrete, carbon, and polyethylene) are also considered. The density of water interspersed between units within the array is varied from 0.0 to 0.01 grams per cubic centimeter, to bound conditions that may exist during fire sprinkler activation or up to full density water if full flooding is credible. Local reflection from thin water films on fissile items that might accumulate during sprinkler activation shall be conservatively represented by placing a 0.35-cm thick full density water layer on vertical surfaces and a 0.7-cm thick full density water layer on horizontal surfaces.

5.5.3 Computer Codes and Associated Safety Limits Computer Codes Computer codes may be used to calculate system reactivity (i.e., keff). Procedures for computer code validation for the TRISO-X FFF incorporate applicable requirements from ANSI/ANS-8.24-2017, Validation of Neutron Transport Methods for Nuclear Criticality Safety Calculations, as it relates to the validation process for computer codes, with exceptions and qualifications as noted in NRC Regulatory Guide 3.71, October 2018.

Nuclear criticality safety calculations are performed using approved and validated computer codes such as SCALE, MCNP, XSDRN, etc. The requirements for the verification and validation of

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-18 computer codes are defined in approved procedures and incorporate the conservatisms as discussed herein. The validation report for a computer code is documented in a written approved report. The required content for a validation report is further discussed.

Validation establishes the suitability of the computer code system (hardware and software) for use in criticality safety evaluations by establishing the calculation margin, a margin of subcriticality, and the Upper Subcritical Limit (USL). The calculation margin is established by simulating benchmark experiments to estimate the systematic difference between the calculated multiplication factor (keff), and the measured keff of the benchmark experiments. The systematic difference is the code bias. Bias and bias uncertainty of the computer code system are included in the calculational margin. The calculational margin incorporates appropriate statistical methods that account for the behavior of bias and bias uncertainty (e.g., by considering trends in bias) throughout the range of parameters included in the collection of benchmark experiments. The area of applicability of the validation is a subset of the range of parameters included in the benchmark experiments. The calculational margin is based on widely accepted statistical methods such as the 95 percent confidence limit, the 95/95 lower tolerance limit, or a rank-and-percentile non-parametric method, applied to various subsets of the chosen benchmarks. The statistical method and subset of benchmarks that produce the largest calculation margin, as documented in the validation report, is used in determining the bounding USL.

Computer codes are validated to ensure that they calculate within acceptable ranges and that the assumptions are appropriate. The applicability of computer code validation is documented in nuclear criticality safety calculations and/or evaluations for the system being evaluated. The computer code validation reports are incorporated into the configuration management program.

Validation reports are prepared, reviewed, and approved by qualified individuals for each combination of computational method (e.g., code), cross-section library, computer platform, and analytical area of applicability, as appropriate. In all cases, each validation report, or the calculation documenting an analysis using a specific computational method, shall include the following:

a. The methodology, which is sufficiently detailed and clearly stated to permit an independent review, including: the method used to select benchmark experiments, determination of the bias and bias uncertainty, and determination of the upper subcritical limit (USL) using various benchmark groupings.
b. Consideration for all processes, and associated materials, listed in Chapter 1, Section 1.1.3.
c. Description of the methods used to extend the area(s) of applicability beyond the range of values covered by the benchmark experiments. In instances where the AoA needs to be extended for a calculation or set of calculations, additional margin is applied to the USL. The additional margin is calculated using sensitivity/uncertainty (S/U) methods

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-19 similar to those described and referenced in NUREG/CR-7308 Sensitivity/Uncertainty Methods for Nuclear Criticality Safety Validation. The justification for acceptance criteria used in the S/U method and the resulting additional margin are documented in the applicable calculation report or NCSE.

d. Benchmarks are included from the International Handbook of Evaluated Criticality Safety Benchmark Experiments (IHECSBE) and ORNL/CSD/TM-238, Validation of KENO V.a Comparison with Critical Experiments.
e. The Minimum Margin of Subcriticality (MMS) is selected based on consideration of the amount of conservatism in calculational models, the validation methodology and results, and process conditions that are well defined. An MMS of 0.02 is selected based on an extremely diverse set of limited benchmarks. The USL incorporates an MMS of 0.02 in Confidence Limits of 95% for the most limiting subgroup of the benchmarks such that the actual MMS applicable to the USL based on larger grouping or the entire group would be larger than 0.02.
f. The codes are used consistent with the defined AoA, with AoA extension performed in accordance with item c. Calculation documents or applicable evaluations demonstrate that the modeled configurations are within the AoA.

Changes to the code or cross section versions require additional code validation. Verification testing is performed during initial installation or when changes are made that could adversely impact the calculation process. Validation or verification are not required for changes that would not reasonably be expected to change calculation results. To ensure continued code performance, verification testing is performed and documented in applicable calculation results.

Safety Limits The validation establishes the technical basis for the margin(s) of subcriticality based on the quantity and quality of benchmark data, and the overall similarity of the benchmark experiments to the systems being evaluated.

The minimum margin of subcriticality is justified based on both conservative modeling practices and conservatism in the validation methodology. For the TRISO-X FFF, conservative modeling practices include using an enrichment of 20 wt.% 235U, assuming optimal moderation or saturated conditions for bounding material densities, using bounding fissile material compositions, modeling geometric components to outer dimensions, and neglecting materials of construction of components unless shown to lead to a more reactive configuration. Some materials of construction are credited in fissile material shipping packages; however, these items are qualified under more stringent design and testing programs with materials of construction reduced (e.g.,

outer drum wall thickness) to conservatively bound any losses during the life of the package.

Conservatism in the validation methodology includes the use of diverse statistical methods and the consideration of many diverse subgroups of the benchmark data. The choice of methods and data that produce the largest calculational margin shall be conservatively applied in determining the USL, including not crediting a positive bias. However, positive bias values will be included in

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-20 the estimate of bias uncertainty and will conservatively increase bias uncertainty and decrease the associated USL. This same conservative approach will be applied to the validation of the code at other enrichment ranges.

The USL varies with the computer code system (hardware, codes, and cross sections) as the calculational margin varies. The USL is the keff of a critical system (i.e., 1.0) minus the sum of calculational margin and the margin of subcriticality. Systems that are evaluated within the area of applicability, and that have a keff + 2 less than or equal to the USL, demonstrate subcriticality.

The calculation of keff is accomplished using computer code systems that utilize Monte Carlo techniques to determine keff of a system. Computer models representing the geometric configuration and material compositions of the system are developed for use within the code.

The development of appropriate models must account for or conservatively bound both normal and credible abnormal process conditions. The development of appropriate models shall also account for or conservatively bound both normal and credible abnormal process conditions.

For the initial design of the TRISO-X FFF, the SCALE-6.2.3 code with the V7-252-group ENDF/B-VII.1 cross section library is used on validated standalone workstations for criticality calculations.

Future versions of the code or nuclear data or use of other industry-accepted codes (e.g., MCNP) will be controlled, verified, and validated with the same level of rigor, as discussed in this section.

When determining subcriticality based on computer code calculations, the following USL limits, regardless of the method employed, shall not be exceeded:

System Upper Subcritical Limit High-enriched systems (Uranium enriched in 235U > than 20 wt. %)

0.95 High assay low enriched systems (Uranium enriched in 235U 20 wt. % and > 10 wt. %)

0.96 Low-enriched systems (Uranium enriched in 235U 10 wt. %)

0.97 The USL values are exact limit values, and do not imply that compliance need only be shown to 2 significant figures. The determination of the appropriate USL shall be documented in a validation report and lesser values shall be used based on variances in the calculated bias, bias uncertainty, margin of subcriticality, and the statistical method and subset of benchmark that produce the largest calculation margin. Compliance with these values shall include the calculational inaccuracies, such as Monte Carlo variance, by meeting the limit with a margin in the conservative direction of at least two standard deviations (i.e., keff + 2). Any rounding is in the conservative direction.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-21 5.6 Sources of Criticality Data and Analytical Techniques The NCS staff may use the following sources of criticality data and analytical techniques to support nuclear criticality safety analyses and evaluations:

1. J. H. Chalmers, G. Walker, and J. Pugh, Handbook of Criticality Data, UKAEA Handbook AHSB (S), 1965.
2. H. C. Paxton and N. L. Pruvost, Critical Dimensions of Systems Containing 235U, 239Pu, and 233U, LA-10860, Los Alamos National Laboratory, 1986.
3. N. L. Pruvost and H. C. Paxton, Nuclear Criticality Safety Guide, LA-12808, Los Alamos National Laboratory, 1996.
4. R. D. Carter, G. R. Kiel, and K. R. Ridgway, Criticality Handbook, Volumes I, II, and III, ARH-600, Atlantic Richfield Hanford Company, 1968.
5. Gesellschaft für Anlagenund Reaktorsicherheit (GRS) gGmbH, Handbuch zur Kritikalitt, GRS-380, 2019.
6. Determination of H/U Ratios in UO2 Water and ADU-Water Mixtures, JN-71-2, 1971.
7. B. T. Reardon and M. A. Jessee, Eds., SCALE Code System, ORNL/TM-2005/39, Version 6.2.3, March 2018.
8. American Nuclear Society, Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, ANSI/ANS 8.1-2014 (R2018).
9. American Nuclear Society, Criticality Accident Alarm System, ANSI/ANS-8.3-1997 (R2017).
10. American Nuclear Society, Use Of Borosilicate-Glass Raschig Rings As A Neutron Absorber In Solutions Of Fissile Material, ANSI/ANS-8.5-1996 (R2017).
11. American Nuclear Society, Nuclear Criticality Safety in the Storage of Fissile Materials, ANSI/ANS-8.7-1998 (R2017).
12. American Nuclear Society, Use Of Soluble Neutron Absorbers In Nuclear Facilities Outside Reactors, ANSI/ANS-8.14-2004 (R2016).
13. American Nuclear Society, Administrative Practices for Nuclear Criticality Safety, ANSI/ANS-8.19-2014 (R2019).
14. American Nuclear Society, Nuclear Criticality Safety Training, ANSI/ANS-8.20-1991 (R2020).
15. American Nuclear Society, Use Of Fixed Neutron Absorbers In Nuclear Facilities Outside Reactors, ANSI/ANS-8.21-1995 (R2011).
16. American Nuclear Society, Nuclear Criticality Safety Based On Limiting And Controlling Moderators, ANSI/ANS-8.22-1997 (R2016).
17. American Nuclear Society, Validation of Neutron Transport Methods for Nuclear Criticality Safety Evaluations, ANSI/ANS 8.24-2017.
18. American Nuclear Society, Criticality Safety Engineer Training and Qualification Program, ANSI/ANS-8.26-2007 (R2016).
19. Ronald Allen Knief, Nuclear Criticality Safety Theory and Practice. American Nuclear Society, 1993.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-22

20. D. F. Hollenbach, Nuclear Criticality Safety Data Book, Rev. 2, DAC-EN-801768-A100, https://www.osti.gov/servlets/purl/1339414, 2016.
21. Gmelin-lnstitut für Anorganische Chemie, Gmelin Handbook of Inorganic Chemistry, Supplement Volume A6, General Properties - Criticality, 1983.
22. Japan Atomic Energy Research Institute, Nuclear Criticality Safety Handbook, JAERI-Review 95-013, 1995.
23. J. T. Thomas, Ed., Nuclear Safety Guide, TID-7016, Revision 2, NUREG/CR-0095, ORNL/NUREG/CSD-6, U.S. Nuclear Regulatory Commission, 1978.
24. International Handbook of Evaluated Criticality Safety Benchmark Experiments, NEA/NSC/DOC (95), Nuclear Energy Agency Science Committee, Organization for Economic Co-Operation and Development, 2020.
25. American Nuclear Society, Nuclear Criticality Accident Emergency Planning and Response, ANSI/ANS-8.23-2019.
26. C. E. Gross et al, Swapped Source: A Forward Calculation Technique to Help Establish the Worst-Case Accident Location for CAAS Detectors in Fixed Locations, 2018.
27. Adrien Gallozzi-Ulmann, Generalized CAAS Probe Positioning Methodology for a variety of Fissile Material Processes, ICNC 2023 proceedings.
28. M. Buttrey, Criticality Accident Alarm System Modeling for the Uranium Processing Facility, ICNC 2023.
29. ORNL/TM-2013/211, Guide to Performing Computational Analysis of Criticality Accident Alarm Systems, Thomas M. Miller et al.
30. William J. Marshall, et. al., Sensitivity/Uncertainty Methods for Nuclear Criticality Safety Validation, NUREG-CR-7308, U.S. Nuclear Regulatory Commission, 2025.
31. W.C. Jordan, et. al., Validation of KENO V.a Comparison with Critical Experiments, ORNL/CSD/TM-238, ORNL 1986.

5.7 Requirements for New Facilities or New Processes at Existing Facilities As required by 10 CFR 70.64(b), the facility is designed using a defense-in-depth approach for protection against inadvertent criticality. To the extent practicable, the facility design considers preference for the selection of engineered controls over administrative controls to increase overall system reliability, and features that enhance safety by reducing challenges to IROFS are incorporated. The facility design addresses the baseline design criteria of 10 CFR 70.64(a) for new facilities and criticality control.

As required by 10 CFR 70.64(a)(9), the TRISO-X Fuel Fabrication Facility design provides for criticality control including application of the double contingency principle.

If a planned new facility and/or new process meets the 10 CFR 70.72 criteria requiring a license amendment, the baseline design criteria of 10 CFR 70.64(a) will be applied to the control of criticality hazards. A defense-in-depth approach will be applied to higher risk accident sequences as required by 10 CFR 70.64(b).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0005 SNM-XXXX CHAPTER 5 Revision 3 December 2025 Page 5-23 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0005 to header.

5.1 Clarified that ISA risk assessment methods are used to demonstrate compliance with 10 CFR 70.61(b). Changes made per TX0-REG-LTR-0040 Enclosure 1, RAI-1.

5.2.2 Added NCS Program Commitments 7, 8, and 9 which align with the guidance provided in NUREG-1520 Rev. 2, p. 5-A-7 (two bullets) and 5-A-8 (first bullet) as agreed to in meetings with NRC on 12/3-12/4/2024 and 12/16/2024 to resolve ISA RAI-5.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 5.2.3 New Section 5.2.3 ANSI/ANS-8 Series Standards Implementation and Exceptions, added based on TX0-REG-LTR-0077 RAI-2 response.

5.3.4 Various revisions based on TX0-REG-LTR-0077 RAI-4 response.

5.4.1 Revised third paragraph regarding compensatory measures for loss of CAAS coverage based on TX0-REG-LTR-0077 RAI-18 response.

Revised last two paragraphs based on additional NCS changes to chapter 5 in TX0-REG-LTR-0090.

5.4.1.1 New Section 5.4.1.1 CAAS Methodology, added based on TX0-REG-LTR-0077 RAI-20 response.

5.5.2, Item 10 Revised discussion of limiting enrichment based on additional NCS changes to chapter 5 in TX0-REG-LTR-0090.

5.5.3 Updated items a thru f and revised paragraph 1 of Safety Limits based on TX0-REG-LTR-0077 RAI-8 and RAI-6 responses.

5.6 Updated references based on TX0-REG-LTR-0077 RAI-2, RAI-6, RAI-8, and RAI-20 responses.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0006 SNM-XXXX CHAPTER 6 Revision 2 December 2024 Page 6-1 CHEMICAL PROCESS SAFETY Table of Contents SECTION TITLE STARTS ON PAGE 6.1 Chemical Process Safety Program 6-2 6.2 6.2.1 6.2.2 6.2.3 6.2.4 Process Chemical Risk and Accident Sequences Process Descriptions Identification and Evaluation of Chemical Accident Sequences Chemical Consequence Estimates Chemical Exposure Standards 6-2 6.3 6.3.1 6.3.2 6.3.3 IROFS and Management Measures Chemical Process IROFS Management Measures Chemical Process Safety Coordination with Emergency Management 6-3 6.4 Requirements for New Facilities or New Processes at Existing Facilities 6-4

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0006 SNM-XXXX CHAPTER 6 Revision 2 December 2024 Page 6-2 CHEMICAL PROCESS SAFETY 6.1 Chemical Process Safety Program TRISO-X has established and maintains a chemical process safety program to assure that workers, the public, and the environment are adequately protected from the chemical hazards related to the storage, handling, and processing of licensed materials. With respect to NRC oversight, the program is implemented, and the facility is designed, to address chemical hazards associated with licensed materials and hazardous chemicals produced from licensed materials, and chemical risks of facility conditions that could affect the safety of licensed materials. The chemical safety element of the safety program required by 10 CFR 70.62(a) is evaluated and implemented through the ISA process described in Chapter 3.

Based on the 2013 Memorandum of Understanding (MOU) between the NRC and the Occupational Safety and Health Administration (OSHA), the NRC oversees chemical safety issues related to radiation risks of licensed materials, chemical risks of licensed materials, and facility conditions that affect or may affect the safety of licensed materials and thus present an increased radiation risk to workers. OSHA oversees facility conditions that do not affect or involve the safety of licensed materials.

6.2 Process Chemical Risk and Accident Sequences 6.2.1 Process Descriptions A general process description of the production operations is provided in Chapter 1. This is supplemented by more detailed process system descriptions in the facilitys ISA Summary as required by 10 CFR 70.65(b)(3) that include relevant information to provide a basic understanding of operation, allow an understanding of the chemical hazards, and support the development of potential accident sequences.

6.2.2 Identification and Evaluation of Chemical Accident Sequences Potential accident sequences involving chemical hazards related to the safety of licensed materials are incorporated as part of the ISA. Accident sequence identification, consequence and likelihood determination, and risk assessment methods are discussed in Chapter 3 and the ISA Summary.

The ISA includes evaluations of chemical risks of licensed materials, risk of chemicals derived from licensed materials, and chemical risks introduced by facility conditions that could affect the safety of licensed materials. The ISA identifies and evaluates credible unmitigated accidents involving acute chemical exposures under NRC regulatory jurisdiction. The acute chemical exposure pathways evaluated are inhalation, dermal, and ingestion. Analysis assumptions consider the maximum foreseeable inventories of chemicals at specific locations. Routine, non-routine, and

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0006 SNM-XXXX CHAPTER 6 Revision 2 December 2024 Page 6-3 credible abnormal operational scenarios are included in the analysis, along with conservative physical properties of the associated chemicals. Results of the evaluations are compared to the performance criteria in 10 CFR 70.61, and unmitigated scenarios that could result in Intermediate or High consequences are documented in the ISA Summary. IROFS and appropriate management measures are applied to Intermediate or High consequence scenarios to ensure that the performance criteria in 10 CFR 70.61 are met.

6.2.3 Chemical Consequence Estimates Chemical consequence estimates are based on guidance in NUREG/CR-6410, where appropriate, for source term determination, release fractions, dispersion factors, meteorological conditions, and consequence modeling techniques. Alternative methods and other industry accepted techniques may also be used to perform consequence calculations, provided the methods are appropriate to the process, the physical setting, and the specific condition being evaluated.

Safety Data Sheets are also reviewed when assessing chemical consequences. Dispersion models may be utilized to assess the consequences of accidental chemical release scenarios so that the results can be compared to the performance criteria in 10 CFR 70.61 as part of the ISA process.

Source term and dispersion models are selected based on the chemical being evaluated and should provide for a conservative estimate of the potential consequences.

6.2.4 Chemical Exposure Standards Chemical exposure standards used in support of assessing the consequences of an acute chemical exposure to an individual are identified in accordance with 10 CFR 70.65(b)(7). Per NUREG-1520, acceptable chemical exposure standards include, but are not limited to, Acute Exposure Guideline Levels (AEGLs) developed by the United States Environmental Protection Agency, Emergency Response Planning Guidelines (ERPGs) produced by the American Industrial Hygiene Association, and exposure limits established by OSHA. If no AEGLs or ERPGs are available, Temporary Emergency Exposure Limits developed by the United States Department of Energy may be used. These standards are documented in the ISA Summary.

6.3 IROFS and Management Measures 6.3.1 Chemical Process IROFS IROFS are identified and implemented for chemical accident sequences that can lead to Intermediate or High consequence scenarios to ensure that the performance criteria in 10 CFR 70.61 are met. The IROFS and associated accident sequences are documented in the ISA Summary to demonstrate compliance with the performance criteria of 10 CFR 70.61. IROFS may be engineered controls (passive or active), enhanced administrative controls (active engineered features that alert a person to take an action), or administrative controls (actions of people).

6.3.2 Management Measures Management measures that ensure the reliability and availability of IROFS are established as described in Chapter 11.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0006 SNM-XXXX CHAPTER 6 Revision 2 December 2024 Page 6-4 6.3.3 Chemical Process Safety Coordination with Emergency Management IROFS identified in the ISA Summary credited to address chemical consequences may also be described in the Site Emergency Plan. The Site Emergency Plan described within Chapter 8 addresses response to and mitigation of accidents involving process chemicals.

6.4 Requirements for New Facilities or New Processes at Existing Facilities As required by 10 CFR 70.64(b), the TRISO-X Fuel Fabrication Facility is designed using a defense-in-depth approach for protection against chemical accidents. To the extent practicable, the facility design considers preference for the selection of engineered controls over administrative controls to increase overall system reliability, and features that enhance safety by reducing challenges to IROFS are incorporated. The facility design addresses the baseline design criteria of 10 CFR 70.64(a) for new facilities and the control of chemical hazards.

As required by 10 CFR 70.64(a)(5), the design provides for adequate protection against chemical risks produced from licensed material, facility conditions that affect the safety of licensed material, and hazardous chemicals produced from licensed material. The design process includes review of opportunities to remove or reduce the hazards in chemical processing considering inherently safe design concepts - minimize, substitute, moderate, simplify. The proper handling, use, and storage of chemicals is addressed through approved procedures and Hazard Communication training.

If a planned new facility and/or new process meets the 10 CFR 70.72 criteria requiring a license amendment, the baseline design criteria of 10 CFR 70.64(a) will be applied to the control of chemical hazards. A defense-in-depth approach will be applied to higher risk accident sequences as required by 10 CFR 70.64(b).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0006 SNM-XXXX CHAPTER 6 Revision 2 December 2024 Page 6-5 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0006 to header.

6.2.2 Added statements clarifying that the ISA identifies and evaluates credible unmitigated accidents involving acute chemical exposures under NRC regulatory jurisdiction. The acute chemical exposure pathways evaluated are inhalation, dermal, and ingestion. Changes based on TX0-REG-LTR-0029 Enclosure 2, RAI-1.

Revision Summary Added revision summary to end of chapter.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-1 FIRE SAFETY Table of Contents SECTION TITLE STARTS ON PAGE 7.1 Fire Safety 7-2 7.2 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 Fire Safety Management Measures Fire Safety Organization Fire Prevention Inspection, Testing, and Maintenance of Fire Protection Systems Emergency Response Organization Pre-Fire Plans 7-2 7.3 Fire Hazards Analysis 7-4 7.4 7.4.1 Facility Design Facility Design Criteria 7-4 7.5 Process Fire Safety 7-5 7.6 7.6.1 7.6.2 7.6.3 7.6.4 7.6.5 7.6.6 7.6.7 Fire Protection and Emergency Response Water Supply Hydrants, Standpipes, and Hose Houses Fixed Fire Protection Systems Fire Detection and Alarm Systems Portable Fire Extinguishers Lightning Protection Emergency Response Team 7-5 7.7 Requirements for New Facilities or New Processes at Existing Facilities 7-7

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-2 FIRE SAFETY 7.1 Fire Safety The TRISO-X fire protection program is based on a combination of fire protection measures and systems. Such measures and systems are designed and maintained in accordance with industry standards and prudent industry practices. The standards and practices most often consulted are those of the National Fire Protection Association (NFPA).

The fire protection program is designed to minimize the potential for and provide reasonable protection against fire and explosive hazards associated with the processing, handling, and storage of licensed materials during normal operations, anticipated operational off-normal occurrences, and credible accidents. As part of the ISA process described in Chapter 3, area operations are evaluated for the potential for, and consequences of, fire and explosive hazards that could affect the safety of licensed materials and thus present an increased radiological risk.

Where these consequences could exceed the performance requirements in 10 CFR 70.61, IROFS are assigned. These IROFS are identified and controlled as described in the ISA Summary and in approved procedures to ensure they remain available and reliable.

The TRISO-X fire protection program and general facility design were developed using NFPA 801, Standard for Fire Protection for Facilities Handling Radioactive Materials, 2014 edition. In addition to the Fire Hazards Analysis (FHA) prepared as required to comply with NFPA 801 and to support the ISA process, TRISO-X has a general fire safety program that includes general fire safety management measures, facility design requirements, and general fire protection and emergency response measures. The FHA confirms that an adequate level of fire protection and life safety has been achieved that includes defense in depth protection and conformance with national codes, standards, and federal regulations applicable to the facilitys design and construction, and manufacturing operations.

7.2 Fire Safety Management Measures 7.2.1 Fire Safety Organization Fire protection program organization, authorities, and responsibilities are described in Chapter

2. The Authority Having Jurisdiction (AHJ) for the fire protection program is held by the fire protection function unless mandated by local and/or state regulation, where the specifically required AHJ is utilized.

The equivalency concept may be applied in meeting the provisions of NFPA codes or standards, provided that technical documentation demonstrates equivalency, and that the method, system, or device is listed or approved for the intended purpose. Equivalency evaluation records are retained as described in Chapter 11, and records are made available for NRC review and inspection. Where required by code, equivalency evaluations are submitted to the AHJ.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-3 If an IROFS-related NFPA code commitment cannot be met and an alternate method that provides an equivalent level of safety cannot be identified, a formal request to approve a deviation from the NFPA code commitment will be submitted to the NRC for review and inspection relative to effects on nuclear safety.

The configuration management program described in Chapter 11 assures that any facility changes are properly evaluated with regard to the impact upon fire safety and documented within the facility safety bases. New facilities and processes are reviewed by the facility safety review committee.

7.2.2 Fire Prevention

1. Employee Training - General fire safety awareness training is administered to each employee as part of their general employee training. Applicable IROFS training is provided as part of job specific training.
2. Facility Audits and Inspections - Periodic audits and inspections, as detailed in Chapter 11 and approved procedures, are performed for facilities containing licensed materials in a quantity and form that could cause at least an intermediate consequence as defined in 10 CFR 70.61 if totally consumed by fire. Items identified are entered into the facility's corrective action program and tracked to closure.
3. Fire Prevention Procedures - Approved procedures are maintained for the administration of the general fire prevention program. Fire safety procedures address areas such as the storage, handling, and control of combustible (including transient and work-generated),

flammable, and pyrophoric materials; the review and issuance of permits for work performed in the facility to control sources of ignition, such as welding, cutting, brazing, soldering, and grinding; and fire prevention surveillance to ensure that TRISO-X maintains a readiness to extinguish fires and limit consequences of a fire through use of fire detection and suppression systems.

7.2.3 Inspection, Testing, and Maintenance of Fire Protection Systems Procedural guidance is established for the inspection, testing, and maintenance of fire protection systems routinely performed by TRISO-X personnel. These procedures are applied to fire detection, warning, and suppression systems. Inspection, testing, and maintenance may also be conducted by outside vendors that specialize in the type of work required. Records of TRISO-X activities and of outside vendor activities are maintained as described in Chapter 11.

7.2.4 Emergency Response Organization TRISO-X maintains an emergency response organization in accordance with 10 CFR 70.22.

Approved procedures outline the overall emergency response program, including but not limited to staffing, training, drills and exercises, response measures, and offsite agency coordination.

The Emergency Preparedness program, as described in Chapter 8, includes memorandums of

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-4 understanding between TRISO-X and off-site agencies, and addresses periodic off-site training and drills. The TRISO-X emergency response team is discussed in Section 7.6.7.

7.2.5 Pre-Fire Plans TRISO-X maintains pre-fire plans for each building, or part thereof, that, if totally consumed by fire, could release licensed material in a quantity and form that could cause at least an intermediate consequence as defined in 10 CFR 70.61. These pre-fire plans provide information needed by fire-fighting personnel responding to the emergency and are located for ready access by the facility emergency response team and local fire departments who may respond to an emergency at the TRISO-X FFF. Where Criticality or adverse chemical reaction concerns may exclude water suppression techniques within certain process areas, or if detection and/or other suppression methods are selected to further mitigate the potential for criticality, this is addressed in the associated pre-fire plans. Pre-fire plans for buildings/areas that involve licensed materials are reviewed by NCS staff.

7.3 Fire Hazards Analysis An FHA has been developed as required by NFPA 801 (2014 edition). This document was prepared for the manufacturing building that is involved in processing or storage of licensed materials in sufficient quantities and in a form that, if released in a fire, could result in an intermediate or high consequence event as defined in the ISA summary.

The FHA is a component of the ISA process, as described in Chapter 3. The FHA focuses on bounding fire scenarios within buildings that contain licensed materials and consider fire loading, the consequences and analysis of an unmitigated fire, and mitigating controls. Fire and/or explosion hazards which have the potential to create high or intermediate consequences as defined in 10 CFR 70.61 are controlled via the application of appropriate IROFS. These IROFS are documented in the ISA Summary as described in Chapter 3. Management measures that ensure the reliability and availability of IROFS are established as described in Chapter 11.

7.4 Facility Design 7.4.1 Facility Design Criteria The TRISO-X FFF is designed and constructed consistent with the requirements of NFPA 801 (2014 edition), as well as applicable state and local building, electrical, and fire codes in effect at the time of construction. The FHA and/or facility design documentation describes the type of construction, building materials, exterior openings, fire detection and alarm system, automatic fire suppression systems, and the fire water distribution system.

Design and construction criteria for facilities that process licensed materials include an evaluation to determine the proper methods to prevent, detect, extinguish, limit, and control fires and explosions. Fire-resistive and non-combustible materials are used as appropriate. Fire areas may

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-5 subdivide specified processes or materials involving significant fire hazards to confine the spread of fire to the area of origin, and fire barriers are provided as recommended by the FHA.

Criticality or adverse chemical reaction concerns may exclude automatic water suppression extinguishing systems from certain process areas, or detection and/or other suppression methods may be selected to further mitigate the potential for criticality where these areas have significant fire risks.

Electrical installation, ventilation, lightning protection, fire water runoff, life safety and worker egress, and firefighter access are considered. Physical security features designed for the protection of licensed material are reviewed to prevent or minimize the inadvertent delay of either worker egress or fire fighter access during emergency situations.

7.5 Process Fire Safety Process fire safety is considered in the planning, design, and construction of new facilities and processes. In areas where fire and/or explosion hazards may impact licensed material, risks are evaluated and documented by the ISA process. The ISA evaluates the special fire risk associated with:

Combustible, flammable, and pyrophoric process chemicals (solids, liquids, gases), in use and in storage, Exothermic reactions of uranium oxides, and High temperature and/or high pressure equipment.

The ISA summary identifies the fire-initiated release scenarios that may impact licensed material.

Process-related fire hazards are controlled with IROFS to the extent necessary to meet the performance requirements of 10 CFR 70.61.

7.6 Fire Protection and Emergency Response 7.6.1 Water Supply Fire protection water is provided to TRISO-X facilities through a stand-alone underground loop system fed by the City of Oak Ridge water distribution system. Details of the fire protection water supply are contained in the FHA, in pre-fire plans, and/or in approved procedures.

7.6.2 Hydrants, Standpipes, and Hose Houses Multiple hydrants are provided throughout the fire protection loop. Locations are such that they allow ready access for quick use when needed to assist in firefighting. In areas where automatic water suppression extinguishing systems are excluded or are not preferred due to criticality or adverse chemical reaction concerns, standpipe hose cabinets are provided for use when authorized. Hose houses may also be provided in areas that are hard to access or are

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-6 inaccessible. Details of the hydrants, standpipes, and hose houses are contained in the FHA, in pre-fire plans, and/or in approved procedures.

7.6.3 Fixed Fire Protection Systems Fixed fire protection systems, including clean agent and/or gaseous fire extinguishing and automatic sprinkler systems, are utilized throughout TRISO-X facilities. Selection of equipment considers the severity of the hazard, the type of activities performed in the area, the potential consequences of a fire, and the potential consequences of use of the suppression equipment (e.g., risk of an accidental criticality, or substantial electrical hazard). Details of the fixed fire protection systems are contained in the FHA, in pre-fire plans, and/or in approved procedures.

7.6.4 Fire Detection and Alarm Systems TRISO-X facilities are equipped with fire detection and alarm systems that include initiating devices (e.g., smoke detection, heat detection, manual pull stations) and notification appliances (e.g., audible alarm, visual strobe). Selection of equipment considers the types of hazards in the area and the environment in which the equipment will be installed. Fire detection, alarm, and suppression systems are continuously monitored. Details of the fire detection and alarm systems are contained in the FHA, in pre-fire plans, and/or in approved procedures.

7.6.5 Portable Fire Extinguishers Portable fire extinguishers are located throughout TRISO-X facilities for use by employees responding to incipient stage fires. Selection of equipment considers the class of fires that could occur in the area and capacity required. Details regarding the type and location of the portable fire extinguishers are contained in the FHA, in pre-fire plans, and/or in approved procedures.

7.6.6 Lightning Protection TRISO-X facilities have been outfitted with lightning protection systems as specified in the FHA.

7.6.7 Emergency Response Team TRISO-X maintains an emergency response team. The emergency response team is an organized group of employees who are knowledgeable, trained, and skilled in basic fire-fighting operations, first aid techniques, and emergency response. Training and education are provided for team members commensurate with those duties and functions that they are expected to perform.

TRISO-X relies on support from offsite firefighting resources for fire and hazardous materials release response.

The TRISO-X Emergency Preparedness program, as described in Chapter 8, includes memorandums of understanding between TRISO-X and off-site agencies, and addresses periodic off-site training and drills. The TRISO-X emergency response organization is discussed in Section 7.2.4.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-7 7.7 Requirements for New Facilities or New Processes at Existing Facilities As required by 10 CFR 70.64(b), the TRISO-X Fuel Fabrication Facility is designed using a defense-in-depth approach for protection against fire and explosion accidents. To the extent practicable, the facility design considers preference for the selection of engineered controls over administrative controls to increase overall system reliability, and features that enhance safety by reducing challenges to IROFS are incorporated.

Consistent with the guidance provided in NFPA 801, the FHA and ISA demonstrate that the design, building construction, fire areas, life safety, and ventilation of the facility; process fire safety; fire detection and suppression systems; pre-fire planning; and manual fire suppression capability together form the basis for compliance with the BDC of 10 CFR 70.64(a) and the defense in depth requirements of 10 CFR 70.64(b).

As required by 10 CFR 70.64(a)(3), the design provides for adequate protection against fire and explosion by incorporating defense-in-depth concepts such that health and safety are not wholly dependent on any single element of the design, construction, maintenance or operation of the facility. This is accomplished by achieving a balance between preventing fires from starting; quickly detecting, controlling and promptly extinguishing those fires that do occur; and protecting structures, systems, and components such that a fire will not lead to an unacceptable consequence.

If a planned new facility and/or new process meets the 10 CFR 70.72 criteria requiring a license amendment, the baseline design criteria of 10 CFR 70.64(a) will be applied to the control of fire hazards. A defense-in-depth approach will be applied to higher risk accident sequences as required by 10 CFR 70.64(b).

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0007 SNM-XXXX CHAPTER 7 Revision 2 December 2024 Page 7-8 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0007 to header.

Revision Summary Added revision summary to end of chapter.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0008 SNM-XXXX CHAPTER 8 Revision 2 December 2024 Page 8-1 EMERGENCY MANAGEMENT Table of Contents SECTION TITLE STARTS ON PAGE 8.1 Emergency Plan 8-2 8.2 Emergency Plan Implementing Procedures 8-2 8.3 Amendment of the Emergency Plan 8-2 8.4 Agreements with Offsite Emergency Response Resources 8-2 8.5 Requirements for New Facilities or New Processes at Existing Facilities 8-2

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0008 SNM-XXXX CHAPTER 8 Revision 2 December 2024 Page 8-2 EMERGENCY MANAGEMENT 8.1 Emergency Plan TRISO-X maintains an emergency plan in accordance with the requirements of 10 CFR 70.22(i)(1)(ii). Content of the plan is in accordance with 10 CFR 70.22(i)(3) and is consistent with U.S. Nuclear Regulatory (NRC) guidance in Regulatory Guide 3.67, Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities.

8.2 Emergency Plan Implementing Procedures The requirements of the emergency plan are implemented through approved procedures and checklists.

8.3 Amendment of the Emergency Plan The emergency plan is maintained as needed. TRISO-X may change the approved plan without NRC approval if the changes do not decrease the effectiveness of the plan. In accordance with 10 CFR 70.32(i), copies of changes that do not decrease effectiveness will be provided to the NRC and appropriate organizations within six months of making the changes. Proposed changes to the plan that decrease its effectiveness will not be implemented without prior approval by the NRC.

8.4 Agreements with Offsite Emergency Response Resources Formal written agreements with offsite medical response organizations (Methodist Medical Center and University of Tennessee Medical Center) have been established and will be maintained to assure implementation of the emergency plan and emergency response procedures. These hospitals will serve as emergency response hospitals for injured individuals that may be contaminated or exposed to radiological materials. Hospital staff have also received training from the Radiation Emergency Assistance Center/Training Site in Oak Ridge. These agreements are reviewed and renewed as described in the emergency plan and are maintained on file at the TRISO-X Fuel Fabrication Facility. Local fire, police, and ambulance services (City of Oak Ridge, Roane County) are required by Tennessee state law to respond to emergencies when 911 is called.

8.5 Requirements for New Facilities or New Processes at Existing Facilities As required by 10 CR 70.64(a)(6), and as described in the emergency plan, the TRISO-X Fuel Fabrication Facility design provides for emergency capability to maintain control of licensed material and hazardous chemicals produced from licensed material, evacuation of onsite

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0008 SNM-XXXX CHAPTER 8 Revision 2 December 2024 Page 8-3 personnel, and onsite emergency facilities and services that facilitate the use of available offsite services.

If a planned new facility and/or new process meets the 10 CFR 70.72 criteria requiring a license amendment, the baseline design criteria of 10 CFR 70.64(a) will be applied to emergency capability.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0008 SNM-XXXX CHAPTER 8 Revision 2 December 2024 Page 8-4 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0008 to header.

Section 8.4 Updated offsite emergency response resource information due to TX0-LTR-0022, Emergency Management RAI-1.

Revision Summary Added revision summary to end of chapter.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-1 ENVIRONMENTAL SAFETY Table of Contents SECTION TITLE STARTS ON PAGE 9.1 Environmental ALARA 9-2 9.2 9.2.1 9.2.2 9.2.3 Gaseous Effluent Control Gaseous Effluent Sampling High-Efficiency Particulate Absolute (HEPA) Filtration Final HEPA Filter Surveillance 9-2 9.3 9.3.1 Liquid Effluent Control Wastewater Collection/Treatment 9-4 9.4 Waste Management 9-5 9.5 Environmental Monitoring 9-5 9.6 Program Management 9-7

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-2 ENVIRONMENTAL SAFETY 9.1 Environmental ALARA TRISO-X has established and maintains an environmental safety program to maintain concentrations of radioactive materials in facility effluents and the surrounding environment as low as reasonably achievable (ALARA). The TRISO-X ALARA program is described in Chapter 4.

Environmental releases are limited and monitored such that compliance with the public dose limits of 10 CFR 20.1301 and the effluent limits of 10 CFR 20.1302 can be achieved and demonstrated. These objectives are supported by performing routine measurements and calculations, comparing results to action levels, and reporting results to facility management and the NRC, as appropriate. Internal action levels are implemented through approved procedures to provide early identification of potential problems and prevent exceedance of established guidelines. If action levels are exceeded, investigations are initiated to identify the cause, and appropriate corrective action(s) are taken to minimize the likelihood of recurrence as part of the corrective action program outlined in Chapter 11.

The environmental safety program implementing procedures ensure compliance with 10 CFR 20 Subparts B, Radiation Protection Programs, D, Dose to the Public, F, Surveys and Monitoring, K, Waste Disposal, L, Records, and M, Reports, that address effluent control and treatment. The program includes provisions for the monitoring of the facility environment, including ambient air, surface water, ground water, soils, and vegetation, that could be affected by facility effluents.

The TRISO-X ISA Summary and Environmental Report provide additional information. Chapter 2 of this application addresses staff qualifications of individuals responsible for the environmental safety program.

9.2 Gaseous Effluent Control Operating and engineered controls are used as necessary to ensure that environmental airborne concentrations of radioactive materials attributable to gaseous effluents are constrained and resultant radiological doses to members of the public comply with the concentration limits and public dose limit specified in 10 CFR 20.1101(d), consistent with guidance in Regulatory Guide 4.20. Dose calculations are performed using nationally recognized methods.

Dose calculations as well as environmental concentrations in 10 CFR 20, Appendix B, Table 2 for members of the public may be modified based on ICRP 66 and 68 as described in Chapter 1, assuming an Activity Median Aerodynamic Diameter (AMAD) of 5 micrometer.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-3 9.2.1 Gaseous Effluent Sampling Continuous representative sampling is performed in stacks exhausting air with potential concentrations of radioactive materials that are significant with respect to the sites compliance with 10 CFR 20. Samples are collected and analyzed for particulate radioactive material on a scheduled basis as defined in approved procedures using methods and frequencies appropriate for the effluent medium and the radionuclide(s) being sampled. Effluents are sampled unless periodic sampling or other means have established that radioactivity in the effluent is insignificant and will remain so.

Gaseous effluent sampling is performed during manufacturing operations involving licensed materials. Sampling of exhaust air stacks is not required when the underlying ventilation system has been shut down in conjunction with a cessation of the processing of licensed materials in the affected ventilated spaces. Any passive emissions of radioactive materials are abated by the continued presence of the HEPA filters in place. Approved procedures define action levels to ensure that compliance with applicable limits is maintained.

9.2.2 High-Efficiency Particulate Absolute (HEPA) Filtration HEPA filtration is used on stacks exhausting air that potentially contain radioactive materials that are significant with respect to the sites compliance with 10 CFR 20. This exhaust air is passed through at least one stage of HEPA filtration prior to release from the stack. Fire-resistant HEPA filters that are certified by the manufacturer as meeting HEPA efficiency specifications are used.

The adequacy of final HEPA filter installations is verified by in-place testing prior to initiating operations with radioactive materials in the following instances:

Startup of a new facility Following replacement of final filters After maintenance work on the final filter bank that could have foreseeable adverse impacts on their effective operation After exposure of the final filters to a condition or agent that may have adversely impacted their effective operation, if deemed necessary based on visual/operational inspection.

9.2.3 Final HEPA Filter Surveillance Measures as described in approved procedures are taken to conservatively monitor the potential onset of, or adverse emissions impacts from HEPA filter deterioration. These measures include the following:

Periodic inspection of HEPA filters; Periodic measurement of differential pressures across HEPA filter banks; and Stack emissions monitoring that establish action levels triggering notifications to the maintenance/engineering organization and performance of HEPA filter inspections at

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-4 measured offgas radionuclide concentrations set below applicable 10 CFR 20 Appendix B effluent limits, and levels above which the process would be shut down.

Final HEPA filter installations are equipped with pressure differential measuring/indicating devices. Measured differential pressures are used to evaluate the need for filter changeout/maintenance.

9.3 Liquid Effluent Control No liquid effluents are planned for radiological process streams in the TRISO-X FFF. Design of the facility, along with operating and engineered controls, is used as necessary to ensure that radiological liquid effluent discharges to the environment do not occur. Approved procedures define action levels to ensure that compliance with applicable limits is maintained.

9.3.1 Wastewater Collection/Treatment Process solutions generated by process systems and equipment are recycled to the maximum extent practical. Process solutions contaminated with uranium that cannot be recovered/

recycled are identified as liquid wastes. Liquid wastes are collected and sampled to determine appropriate handling/treatment steps. Treatment typically involves adjustment of pH, filtering, ion exchange, and/or precipitation. Precipitates are de-watered, and the solids are packaged for off-site disposal. If needed, liquid wastes that have been handled/treated can be sampled and discharged through an inline monitor to shipping packages or conveyances for off-site disposal.

Sanitary sewer discharges to the City of Oak Ridge sewer system from facility restrooms and non-radiological process streams related to equipment blowdowns, flushes, and cleaning activities are conducted in accordance with a locally-issued permit. Used oils may also be sampled and containerized for shipment to a licensed disposal facility.

Licensed radioactive material discharges to the sanitary sewer are prevented by locating restrooms, changeroom facilities (i.e., locker rooms, showers, and bathrooms), and drains that lead to the sanitary sewer outside of the Restricted Area (the process area boundary). The Restricted Area includes the Radiologically Controlled Area (RCA). Personnel are required to doff personal protective equipment (PPE) and proceed through contamination monitors prior to exiting the Restricted Area. The sanitary sewer is not physically connected to the Restricted Area or to any process equipment within the Restricted Area.

TRISO-X prevents transport of dispersible radioactive material outside the Restricted Area by requiring personnel to doff PPE and proceed through contamination monitors prior to exiting the Restricted Area. In addition, the Restricted Area is kept at a slight negative pressure, which prevents dispersible radioactive material from migrating outside of the Restricted Area. License Chapter 4 establishes a rigorous Contamination Control Program that includes routine contamination control surveys and radiological surveys for any items removed from the

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-5 Restricted Area and documents the contamination status of areas both inside and outside of the Restricted Area.

9.4 Waste Management The TRISO-X Waste Management Program (WMP) is consistent with EPA and NRC guidance to meet the requirements in 10 CFR 20.1406, and is designed to minimize facility generated waste.

The WMP is endorsed and supported by upper management, details waste streams and the waste characterization process, and is evaluated on a scheduled basis for improvement. The WMP procedures and facilities for waste handling, staging for shipment, and monitoring result in safe and timely disposition of materials.

Solid waste disposal preparation facilities, with sufficient capacity and capability to enable processing, packaging, and transfers of solid waste to licensed treatment and/or disposal sites in accordance with the regulations, are provided and maintained as required to support the operation of the TRISO-X Fuel Fabrication Facility.

9.5 Environmental Monitoring TRISO-X conducts a routine environmental surveillance program. Compliance with 10 CFR 20.1301 is achieved using the option provided in 10 CFR 1302(b)(2)(i) to demonstrate that the annual average concentrations of radioactive material released in gaseous effluents at the boundary of the unrestricted area (the point of stack discharge) do not exceed the values specified in Table 2 of Appendix B to Part 20. Demonstration is accomplished by calculation and validated by measurement. This ensures that environmental concentrations at the site boundary and offsite are well below regulatory limits. TRISO-X evaluated potential transuranic and fission product contaminants in uranium feed material and established the contaminant limits in Section 1.2.4, Item 1 to ensure that surveys of transuranic and fission product radionuclides are not required to maintain compliance with 10 CFR 20. TRISO-X will maintain approved procedures that prevent TRISO-X from receiving uranium feed material with contaminants in excess of these limits. This approach demonstrates that specific surveys for transuranic and fission products are not needed for compliance with 10 CFR 20.

Surface environmental media and groundwater samples are collected from strategic locations in the surrounding environs and analyzed for pertinent constituents of concern. Baseline levels of radionuclides in media surrounding the facility are established through sampling and analysis prior to operations using SNM. Feed material is characterized for enrichment and other potential contaminants prior to use. Future sample results are evaluated against action levels and the facility source term to identify any confounding natural sources of radioactivity or sources from operations external to the facility. Action levels and associated responses are specified for each environmental medium and radionuclide as defined in approved procedures.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-6 The program provides early detection and response to a negative trend in environmental data, and support data in the event of a release of radioactive material. Continuous stack monitoring provides a method for early detection of a negative trend in gaseous effluent releases from normal operations. Ambient air samplers verify the absence of routine ground level gaseous effluent releases and provide a means for measuring the off-site impact in the event of a ground level gaseous effluent release from an off-normal event. Information from these monitoring activities is used to support assessments of normal operations or following off-normal events.

Environmental dosimeters are co-located with the ambient air samplers to confirm the absence of ambient external dose rates above background in unrestricted areas and to assist with the assessment of potential accidents.

A summary of typical sampling activities is included in Table 9-1. Typical sampling locations are provided in Figure 9-1. The locations for sampling of soil and vegetation will be concentrated along the predominant wind directions. The locations for ambient air sampling are selected based on predominant wind directions and the direction of potential receptors. Four groundwater observation wells are installed on the site. Groundwater elevation measurements and modeling indicate that groundwater generally flows in a southwest direction toward East Fork Poplar Creek. There are no known household, public, or industrial users of groundwater downgradient of the site.

Table 9-1: Environmental Monitoring Parameters Type of Sample Analyses Number of Locations Typical Sampling Frequency Air Effluent Discharge Points - Process Ventilation Gross Alpha/Beta Isotopic Uranium 3

Continuous (collection weekly)

Air Effluent Discharge Points - Thermal Oxidizer Gross Alpha/Beta Isotopic Uranium 3

Quarterly Ambient Air Gross Alpha/Beta1 6

Continuous (collection monthly)

Groundwater Gross Alpha/Beta1 4

Quarterly Soil Gross Alpha/Beta1 4

Semi-annually Vegetation Gross Alpha/Beta1 4

Semi-annually Stormwater Gross Alpha/Beta1 3

Quarterly Environmental Dosimetry Determined by NVLAP accredited vendor 6

Quarterly 1Isotopic Uranium analysis is performed when gross alpha/beta action levels are exceeded.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-7 9.6 Program Management Quantities of radioactive material in air and liquids released from the facility are reported to the NRC on a semi-annual basis as required by 10 CFR 70.59, Effluent monitoring reporting requirements.

Approved procedures outline sampling techniques, sample processing and analysis methodologies, quality assurance, and other necessary information to validate analytical results and maintain a viable program.

Sample analysis may be performed either on-site or off-site. In all cases, analytical techniques for sample analysis of each medium are appropriate for the quantities and types of radionuclides present at the facility and are sensitive enough to ensure adequate detection and quantification based on media radiological content and limits. Quality control procedures, for on-site or off-site analysis, detail the periodic checks necessary to demonstrate the operability of the instrumentation used for analysis. Analytical results are reported in a timely manner so that staff can determine the appropriate response to established action levels.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-8 Figure 9-1: Typical Sampling Locations

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0009 SNM-XXXX CHAPTER 9 Revision 3 December 2025 Page 9-9 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0009 to header.

9.2.2 Added this at beginning of sentence 2 to more directly connect the content to sentence 1 due to TX0-REG-LTR-0038, Chapter 1 RAI-9, and a meeting with NRC on 11/5/2024 to discuss open items for License Chapter 1.

9.2.3 Deleted modified due to TX0-REG-LTR-0038, Chapter 1 RAI-9, and a meeting with NRC on 11/5/2024 to discuss open items for License Chapter 1.

9.3.1 Added detail for preventing radioactive material discharge to the sanitary sewer and preventing the transport of dispersible radioactive material outside the Restricted Area. Changes made based on TX0-REG-LTR-0038 RAI-3.

9.5 Added detail for demonstrating compliance with 10 CFR 20.1301 based on TX0-REG-LTR-0038 RAI-1.

Figure 9-1 Added new Figure 9-1 and updated Table 9-1 to include environmental sampling locations based on TX0-REG-LTR-0038 RAI-

1. Revised Figure 9-1 based on an updated site layout showing the TX-1 and TX-2 process buildings.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 9.5 Clarified evaluation of contaminants in feed material based on TX0-REG-LTR-0087 RAI-1 response.

Corrected intent of ambient air samplers based on TX0-REG-LTR-0081 RAI-2 response.

Table 9-1 Updated sampling information based on TX0-REG-LTR-0081 RAI-2 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0010 SNM-XXXX CHAPTER 10 Revision 2 December 2024 Page 10-1 DECOMMISSIONING Table of Contents SECTION TITLE STARTS ON PAGE 10.1 Decommissioning Funding Plan (DFP) 10-2 10.2 Decommissioning Cost Estimate 10-2 10.3 Financial Assurance for Decommissioning 10-2 10.4 Recordkeeping for Decommissioning 10-2

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0010 SNM-XXXX CHAPTER 10 Revision 2 December 2024 Page 10-2 DECOMMISSIONING 10.1 Decommissioning Funding Plan (DFP)

TRISO-X maintains a DFP that contains the elements called for in 10 CFR 70.25(e)(1), including a decommissioning cost estimate; a description of the methods used to assure funds for decommissioning are available when needed; a means for adjusting the cost estimate and associated funding levels periodically over the life of the facility; and, when applicable, certification that financial assurance has been provided in an amount that covers the current estimate for decommissioning. The DFP addresses the decommissioning of facilities with potential for contamination with licensed materials at the TRISO-X Fuel Fabrication Facility site.

The DFP describes how facility design and procedures for operation will minimize, to the extent practicable, contamination of the facility and the environment and generation of radioactive waste, and will facilitate eventual decommissioning as required by 10 CFR 20.1406(a).

10.2 Decommissioning Cost Estimate Consistent with 10 CFR 70.25(e)(2), the decommissioning cost estimate will be reviewed and updated at an interval not to exceed three years.

10.3 Financial Assurance for Decommissioning Financial assurance for decommissioning will be provided by the methods authorized in 10 CFR 70.25(f) and will be in place prior to introducing licensed material. TRISO-X will provide the NRC with signed originals of the financial instruments obtained to satisfy the requirements of 10 CFR 70.25(f).

10.4 Recordkeeping for Decommissioning In accordance with 10 CFR 70.25(g), records will be maintained that are important to the decommissioning of the TRISO-X Fuel Fabrication Facility until such time as the facility is released for unrestricted use.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0010 SNM-XXXX CHAPTER 10 Revision 2 December 2024 Page 10-3 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0010 to header.

Revision Summary Added revision summary to end of chapter.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-1 MANAGEMENT MEASURES Table of Contents SECTION TITLE STARTS ON PAGE 11.1 11.1.1 11.1.2 11.1.3 11.1.4 11.1.5 Configuration Management (CM)

CM Program Design Requirements Document Control Change Control Assessments 11-2 11.2 11.2.1 11.2.2 11.2.3 11.2.4 11.2.5 Maintenance Surveillance and Monitoring Corrective Maintenance Preventive Maintenance Functional Testing Maintenance Records 11-4 11.3 11.3.1 11.3.2 11.3.3 Training and Qualification General Safety Training Training and Qualification for Activities Involving the Handling of SNM Personnel Qualification 11-6 11.4 11.4.1 11.4.2 11.4.3 11.4.4 11.4.5 Procedure Development and Implementation Operating Procedures General Safety and Emergency Procedures Maintenance Procedures Temporary Procedures Periodic Reviews of Procedures 11-9 11.5 11.5.1 11.5.2 Audits and Assessments Internal Audits Independent Assessments 11-12 11.6 11.6.1 Incident Investigations and Corrective Action Conduct of Incident Investigations 11-13 11.7 Records Management 11-14 11.8 Other Quality Assurance (QA) Elements for IROFS 11-15

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-2 MANAGEMENT MEASURES As specified in 10 CFR 70.62(d), management measures are applied to Items Relied on For Safety (IROFS) to provide reasonable assurance that the IROFS are designed, implemented, and maintained to ensure they are available and reliable to perform their functions when needed.

The ISA Summary identifies IROFS applied to facility systems and activities to assure they function to satisfy the performance requirements of 10 CFR 70.61. IROFS may be engineered controls (passive or active), enhanced administrative controls (active features that prompt a person to take an action), or administrative controls (actions of people). Management measures are applied to IROFS based on the type of control (passive, active, enhanced administrative, administrative) as identified in Table 11-1. Methods used to select and assign management measures to IROFS are documented in approved procedures.

11.1 Configuration Management (CM)

A formal review and approval process is used to evaluate modifications to systems and components to ensure that configuration changes do not adversely impact currently implemented IROFS and to ensure new processes meet the performance requirements of 10 CFR 70.61. The CM program captures formal documentation governing the design, safety bases, and continued modification of the site, structures, processes, systems, equipment, components, selected computer programs, personnel activities, and supporting management measures.

11.1.1 CM Program The TRISO-X CM Program controls facilities and processes so safety bases are maintained, and changes are evaluated and documented according to approved procedures consistent with 10 CFR 70.72 process discussed in Section 11.1.4 and the license application change process discussed in Chapter 1. The CM process provides assurance that consistency is established and maintained between facility design, operational requirements, physical configuration, and facility documentation. CM provides oversight and control of design information, safety information, and records of modifications that might impact the ability of IROFS to perform their functions when needed.

The process buildings where licensed materials are stored and used are maintained under the CM Program. Changes to the process buildings are evaluated and documented according to approved procedures consistent with 10 CFR 70.72. The process buildings are maintained according to their code of record and facility modifications are reviewed to ensure no adverse impact to IROFS.

Engineering is responsible for the implementation and ongoing management of the CM Program.

All TRISO-X personnel and organizations are responsible for complying with the CM Program

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-3 objectives and implementing Program requirements as an integral part of their respective functional areas of operation.

11.1.2 Design Requirements Configuration control is accomplished during design using procedures for controlling design, preparation, review, and approval. Design requirements and associated design bases are established and maintained during design, construction, and operations. Design control processes include provisions to identify, document, select, review, and verify design inputs, outputs, analysis, and methods, and to manage interface control and coordination among participating design organizations. Design responsibilities are established to ensure output documents such as, but not limited to, specifications, drawings, diagrams, and test plans are verified per procedure, to meet the input requirements.

For new facilities and processes/systems, design requirements are required to be developed, reviewed, approved, and documented before input of SNM. The baseline design criteria (BDC) identified in 10 CFR 70.64(a) are addressed for IROFS. The preferred design approach is used to the extent practical to select engineered controls over administrative controls. New facility and system design is also based on defense in-depth practices in accordance with 10 CFR 70.64(b) to enhance safety by reducing challenges to IROFS. Design requirements and documents are prepared by the engineering organization. Applicable codes and standards are identified in design documents. Prior to approval, the design documents are reviewed for adequacy, accuracy and completeness as per approved procedures. Changes to design documents or the ISA are subject to the change control processes as described in Chapter 1 and Section 11.1.4 11.1.3 Document Control Procedures are established to control the preparation and issuance of documents. This includes creation, revision, storage, tracking, distribution, and retrieval of applicable information, to include but not limited to, manuals, instructions, drawings, procedures, design documents, specifications, plans, and other documents that pertain to the CM function. Measures are established to ensure documents, including revisions, are adequately reviewed, approved, and released for use by authorized personnel. An electronic document management system is used both to file facility records and to make available the latest revision (i.e., the controlled copy) of design documents. Controlled documents are maintained until cancelled or superseded.

As part of the configuration management program, refer to Section 11.7 for further discussion of the document control and records management procedures.

11.1.4 Change Control The objective of the change control process is to maintain consistency among design requirements, the physical configuration, and the related facility documentation (including the ISA). The process is used to ensure facility configuration documentation changes are properly reviewed, approved and implemented to assure that all impacts of proposed changes are identified and evaluated, design requirements (and bases) are maintained or appropriately

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-4 revised, and changes are coordinated across the affected organizations and personnel responsible for activities and programs at the TRISO-X FFF.

Types of changes are defined and may range from replacement with identical design that are authorized as part of normal maintenance, to new or different designs that require specified review and approval. Major changes include substantial modifications to existing licensed facilities and/or new processes, new licensed facilities, or new processes in existing licensed facilities. Any change requiring a license amendment is also considered a major change. The change control process is implemented via approved procedures to which appropriate personnel are trained.

The change control process assures that the following items are addressed prior to implementing a change as required by 10 CFR 70.72(a):

1) The technical basis for the change;
2) The impact of the change on safety, health, and control of licensed material;
3) Modifications to existing drawings, procedures, and training;
4) Authorization requirements for the change;
5) For temporary changes, the approved duration (e.g., expiration date) of the change;
6) The impacts or modifications to the ISA, ISA Summary, nuclear criticality safety evaluation, or other safety program information, developed in accordance with 10 CFR 70.62 and/or 10 CFR 70.64; and
7) An evaluation as to whether or not a license amendment must be approved by the NRC prior to implementation of the change in accordance with 10 CFR 70.72(c).

Final documentation of the change approval is maintained, and the applicable documentation is made available to the affected personnel. Per 10 CFR 70.72(d)(2), a brief summary of major changes that required revision of the applicable safety or environmental bases will be submitted within 30 days after the end of the calendar year during which the changes occurred.

11.1.5 Assessments Periodic audits and/or assessments of the configuration management program are conducted in accordance with the requirements in Section 11.5 for the purpose of evaluating the program's effectiveness and to correct deficiencies. The results of these assessments are documented and maintained in accordance with approved procedures.

11.2 Maintenance The maintenance program is designed to ensure that IROFS are maintained in a manner to ensure they are available and reliable to perform their intended function when needed. The maintenance program consists of the following key program elements, including management systems that provide scheduling and documentation of these elements when applied to IROFS:

1) Surveillance and Monitoring,

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-5

2) Corrective Maintenance,
3) Preventive Maintenance, and
4) Functional Testing.

Maintenance procedures and instructions are an integral part of the Maintenance program as described in Section 11.4.3.

11.2.1 Surveillance and Monitoring The surveillance and monitoring program is implemented to monitor the current and long-term performance of IROFS.

Surveillance activities include preventive maintenance (11.2.3) and functional testing (11.2.4) that are performed on a scheduled basis, and follow-up to corrective maintenance (11.2.2).

Documentation of surveillances is prepared as per approved procedures. Frequencies of surveillances are based on the type and safety significance of the IROFS, as well as manufacturers recommendations. The results of surveillances are trended to support the determination of performance trends for IROFS and can lead to changes to maintenance frequencies, if appropriate. Maintenance procedures also prescribe compensatory measures, if appropriate for surveillance tests of IROFS that can only be performed while the equipment is out of service.

IROFS found to be out-of-tolerance or unable to perform their intended function are reported in a timely manner through the corrective action program discussed in Section 11.6. Reports of IROFS failures are entered into the corrective action program which provides a means to evaluate the failure, identify the cause of failure, and assign appropriate corrective actions to be initiated.

Records of IROFS performance issues and corrective actions are maintained within the maintenance and corrective action programs, as applicable. Records for failures of IROFS are maintained in accordance with 10 CFR 70.62(a)(3) within the corrective action program.

11.2.2 Corrective Maintenance Corrective maintenance is performed using a systematic, integrated, and controlled approach to ensure that IROFS and other systems necessary for the safe operation of the facility are properly repaired and restored to service in a manner that maintains facility safety and the function of the safety system. Maintenance activities are performed on IROFS in a manner that minimizes or eliminates the recurrence of unacceptable performance deficiencies.

Corrective maintenance is authorized, initiated, and documented through a formally established process that includes steps requiring coordination between the maintenance and operating organizations. The process also includes an evaluation to determine if IROFS performance have been, or may be, adversely affected by the equipment failure/malfunction or the ensuing maintenance and whether post-modification functional testing of IROFS is required.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-6 11.2.3 Preventive Maintenance Preventive maintenance (PM) is performed in a preplanned and scheduled manner to refurbish or overhaul IROFS to ensure that they continue to perform their intended function. PM activities are appropriately balanced against the objective of minimizing unavailability of IROFS. Periodic calibrations are conducted where recommended by manufacturer or industry guidance. After conducting PM, and before returning a safety control to service, a functional test may be required to provide reasonable assurance that the safety control performs as designed and provides the safety action expected.

A schedule for performing PM on IROFS is maintained as specified in approved procedures, and frequencies are established based on operating history, manufacturer and industry guidance, feedback from surveillance and maintenance activities, and/or recommendations from the corrective action program.

11.2.4 Functional Testing Functional testing of IROFS is performed using approved written instructions prior to startup of facilities or process operations involving IROFS (pre-operational testing) and at periodic intervals during operations. This is intended to provide reasonable assurance that the safety control performs as designed and provides the desired safety action. Functional test instructions and frequencies are based on operating history, manufacturer and industry guidance, risk assessment, feedback from surveillance and maintenance activities, and/or recommendations from the corrective action program. During process operations, compensatory measures are used as appropriate while functional testing is performed on IROFS.

Administrative controls that are identified as IROFS are documented in approved procedures.

Administrative controls are assured to available and reliable during operations by applying the applicable measures addressed in this chapter (e.g., procedures, training and qualifications).

11.2.5 Maintenance Records The results of Surveillance and Monitoring, Corrective Maintenance, Preventive Maintenance, and Functional Testing for IROFS are documented, and the documentation is maintained as "records pertaining to safety" as specified in Section 11.7.

11.3 Training and Qualification The Training and Qualification Program provides workers with the knowledge and skills to safely perform their job function, recognize the importance of IROFS, effectively deal with the hazards of the workplace, implement proper control and accounting of SNM, and properly respond to emergency situations. The qualification aspect of this program ensures that operations and maintenance are performed only by properly trained personnel.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-7 Requirements and methods for the training and qualification programs are approved by TRISO-X management, who also provide ongoing evaluation of the effectiveness of the programs.

This training typically falls into one of the following categories:

1) General safety training not specific to a particular workstation or activity;
2) Training to assure proper performance for positions and work activities that are relied on for safety, in particular those designated as IROFS; and
3) Proper control and accounting of SNM.

11.3.1 General Safety Training The Training and Qualification Program requires that all personnel who are granted unescorted access to the owner-controlled area receive formal safety and security orientation training.

Safety orientation training covers facility security and safety rules, radiological, nuclear criticality, chemical, fire, and environmental safety topics as appropriate to the job function of the individuals being trained. In addition, this training covers proper response to emergencies.

Continuing training is conducted in these areas as necessary to maintain employee proficiency.

The content of safety training is evaluated on a scheduled basis, as appropriate for the subject of the training, to ensure it remains current and relevant.

11.3.2 Training and Qualification for Activities Involving the Handling of SNM The Training and Qualification Program includes work training for operating personnel and others who directly handle greater than laboratory sample quantities of special nuclear material.

Facility specific activities are correlated with applicable supporting procedures and training materials. Work training typically includes classroom, on-the-job, and guided-work-experience training necessary to provide the desired knowledge and/or skill. It covers the operating procedures, alarms, emergency response actions, special nuclear material controls and accounting, and radiological, nuclear criticality, industrial, and environmental safety controls and limits specific to the particular work assignment.

Work training includes appropriate reinstruction for previously qualified individuals prior to implementation of a process change or procedural modification. When changes are made relative to safety or emergency response requirements, provisions are made to assure that affected employees are appropriately informed and instructed on the changes. Work training is evaluated, and necessary recurrent training / retraining / requalification is identified and documented. Additional details about the work training program are provided in approved procedures.

The Training and Qualification Program provides for the instruction and training of mechanics involved in maintenance activities. The type and level of training is commensurate with the job assignments.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-8 Organization and Management of Training The responsibility for the assurance of properly trained and qualified personnel resides with the discipline management team and pertinent line management. Support to line management for the development, implementation, and administration of the facility Training and Qualification Program is provided by the Training function. Implementation of the Training and Qualification Program is accomplished in accordance with approved procedures. All training is conducted by, or under the supervision of, individuals recognized by management as possessing the necessary knowledge and skills to conduct the training. Exemptions from training are only authorized as described in approved procedures.

Training records are maintained to support management information needs and provide required information on each individuals training and qualification. The records are maintained in accordance with approved procedures.

Identification of Activities Requiring Training Positions impacting the availability/reliability of IROFS are assessed considering the hazards and the safety responsibilities associated with each position. Input from subject matter experts, with support from the training function, is utilized as appropriate.

Position Training Requirements Objectives and requirements for training programs are jointly agreed upon by management based upon facility needs and input provided by the training function and the appropriate discipline. Each position involving personnel assigned to SNM process operations is evaluated to determine the specific requirements that apply to the defined job function. Personnel must remain current on the defined set of requirements to maintain job qualifications.

Bases for Training The objective of training is to ensure safe and efficient operation of the facility and compliance with applicable established regulations and requirements. Learning objectives are established for those positions/activities impacting the safety and security of licensed material operations, and in particular the availability/reliability of designated IROFS. Objectives include, as applicable, the knowledge skills, and abilities the trainee should demonstrate; the conditions under which required actions will take place; and the standards of performance the trainee should achieve upon completion of the training activity.

Training Materials Lesson plans, computer-based training, and other training guides (for self-study, classroom, and on-the-job training) developed for activities relied on for safety and security are based on learning objectives developed from specific job performance requirements. Information provided, reviewed, and approved by subject matter experts is included in the content of training elements with clearly defined objectives. The lesson plans also provide reasonable assurance that training is conducted in a reliable and consistent manner. Lesson plans, guides and other

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-9 training materials are reviewed and approved before their issuance and use. The CM Program provides a means to assure that design changes and modifications to IROFS are accounted for in the training and that personnel are instructed using current procedures.

Evaluation of Trainee Accomplishment Trainee understanding and command of learning objectives are evaluated. The evaluation may be accomplished through a combination of observation/skills demonstration, written tests, or oral examinations. The results of trainee evaluations are documented.

On-the-Job Training (OJT)

OJT requirements for activities relied on for safety and listed in the ISA Summary, if applicable, are specified as part of pertinent position training requirements. Completion of OJT may be demonstrated by actual task performance (preferred) or task simulation. OJT is conducting by qualified individuals using current training materials. Completion of OJT is demonstrated through actual task actions (or simulation) using conditions encountered during the performance of assigned duties including the use of references and tools, and equipment conditions reflecting the actual task to the extent practicable. Completion of OJT requirements are documented.

Training Program Review The effectiveness of the Training and Qualification Program is assessed on a periodic basis. Work assignments involving the handling of SNM are evaluated for needed recurrent training and/or reevaluation of qualification activities. Improvements and changes are made to training as needed to correct any deficiencies or performance problems.

11.3.3 Personnel Qualification The minimum qualifications for key management and technical professional staff positions are described in Chapter 2. Qualifications for personnel who conduct activities involving the handling of SNM are described in Section 11.3.2.

11.4 Procedure Development and Implementation Activities involving the handling of SNM and/or IROFS are conducted in accordance with approved procedures as defined in this section. Procedures address the following activities:

design, configuration management, procurement, construction, operations, radiation safety, maintenance, waste management, quality assurance, training and qualification, audits and assessments, incident investigations, records management, nuclear criticality safety, fire safety, chemical process safety, environmental protection, and reporting requirements. Procedures also address the requirements contained within the Site Emergency Plan, Fundamental Nuclear Material Control Plan, and Physical Security Plan. Procedures are classified into the general categories of operating, general safety and emergency, and maintenance. Administrative procedures are used for activities that support the process operations including subjects such as

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-10 design, inspections and testing, and do not include activities involving the handling of SNM and/or operating IROFS.

The process for the development, management, and implementation of procedures is defined in approved procedures. These procedures address how procedures are developed, reviewed, approved, distributed, revised, and deleted. Each procedure contains an identifying number, title, revision number, date, scope of applicability, and purpose statement. The procedures include pre-requisites, cautions, controls, limitations and additional parameters, where applicable, to ensure appropriate direction is applied for procedures regardless of their type (administrative, operating, general safety and emergency, or maintenance). The system ensures that the most current revisions of procedures are readily available to workers within their work areas (operating procedures), or in a centralized location accessible to all affected personnel, that any necessary training and qualification requirements are identified, and that the timeframe for which the procedure is valid is defined.

Procedures are approved by appropriate management personnel who are responsible for the activity governed by the procedure. Changes and/or revisions to procedures covering licensed material operations and/or IROFS are reviewed by the regulatory affairs functions, as appropriate, in accordance with the requirements of the CM program, as discussed in Section 11.1, to ensure that all associated activities and documentation (safety analyses, reviews, testing, training, etc.) are completed before procedural changes are implemented.

If any aspect of a procedure is unclear or incorrect as written, personnel are authorized to safely stop the operation and/or activity and contact management. In the event of an unusual incident, accident, significant operator error, equipment malfunction, or system modification, the applicable procedures are evaluated and revised as necessary.

11.4.1 Operating Procedures Operating procedures are documents written to authorize the processing of radioactive material; and within these documents, detailed instructions for operation of equipment used in the process or activity, instructions for disposition of radioactive wastes, and limits and controls established for safety and regulatory purposes, including IROFS, are identified.

Operating procedures include the required actions and limits for startup, operation, and shutdown; actions necessary to prevent or mitigate accidents identified in the ISA Summary; and responses to alarms and applicable off-normal conditions, including failure of an IROFS.

Operating procedures include provisions to place process operations in a safe condition if a step of the procedure cannot be performed as written. Workplace posting of limits and controls, training, and other communication devices are used, if appropriate, to enhance comprehension and understanding of operating procedures.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-11 During operating procedure development, the technical accuracy is verified. Changes to existing operating procedures are evaluated to determine if the scope of the change warrants a walk-down and/or an independent verification/validation. New operating procedures are validated by operations staff to ensure that they can be performed as written.

11.4.2 General Safety and Emergency Procedures General safety procedures outline health and safety practices that help maintain occupational radiation exposures at levels as low as reasonably achievable (ALARA). These procedures are generally applicable on a facility-wide basis to include safe work practices to control processes with licensed material, IROFS, and hazardous materials. Included in this category are the Emergency Plan implementing procedures and the Criticality control procedures. General safety procedures are reviewed and approved by the applicable regulatory affairs functions.

11.4.3 Maintenance Procedures Maintenance of facility structures, systems and components is performed in accordance with approved procedures, documented instructions, checklists, or drawings appropriate to the circumstances that conform to applicable codes, standards, specifications, and other appropriate criteria. Maintenance program procedures ensure that corrective and preventive maintenance as well as functional testing are implemented for IROFS; that reviews for accuracy and completeness are conducted for work to be performed; and require the affected organizations to be notified prior to performing the maintenance work and at completion of the work.

Procedures provide compensatory measures for IROFS that may be degraded or taken out-of-service during maintenance activities.

Procedures require work to be controlled through review of the planned work by the applicable regulatory affairs functions. The maintenance program identifies qualifications of personnel authorized to perform maintenance, specifications for replacement components as covered by CM, requirements for post maintenance testing, required records management of maintenance activities, and safe work practices applicable to the work to be performed.

11.4.4 Temporary Procedures Approved temporary procedures are used when permanent procedures do not exist to:

1) Direct operations during testing, maintenance, and facility modifications;
2) Provide guidance in unusual situations not within the scope of permanent procedures; or,
3) Provide assurance of orderly and uniform operations for periods of short duration when the facility, a system, or a component is performing in a manner not covered by existing permanent procedures or has been modified or extended in such a manner that portions of existing procedures do not apply.

Temporary procedures are controlled, reviewed, and approved as specified by a written procedure and will not change an ISA except as authorized under 10 CFR 70.72. The review and

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-12 approval process required for temporary procedures is the same as for other procedures, and a timeframe is defined for which the procedure is valid.

11.4.5 Periodic Reviews of Procedures Procedures governing activities relied on for safety involving the handling of SNM and/or IROFS are reviewed periodically to ensure content remains current and relevant and that administrative IROFS remain available and reliable. The review frequency is defined in approved procedures and may be determined using a risk-based approach and importance to safety. Emergency procedures are reviewed per the Emergency Plan required in Chapter 8. Safeguards procedures are reviewed per the Fundamental Nuclear Material Control Plan required in Chapter 12. Security related procedures are reviewed per the Physical Security Plan required in Chapter 13. The corrective action program (Section 11.6) includes provisions to assess the role of procedures in adverse conditions or events evaluated within the program. Corrections of procedural deficiencies are tracked to completion within the system.

11.5 Audits and Assessments A program is in place for conducting audits and assessments of activities significant to facility safety, safeguards, and environmental protection that identifies responsibility for:

1)

Determining the appropriate utilization of internal and/or external personnel for particular audit and assessment activities.

2)

Assuring audit and assessment personnel have the expertise and background sufficient to successfully conduct audit and assessment activities.

3)

Assuring audit and assessment personnel are sufficiently independent of the area being reviewed.

4)

Verifying the utilization of an effective corrective action program to address findings of audits and assessments.

Audits and assessments are conducted for the areas of radiation safety, nuclear criticality safety, chemical safety, fire safety, environmental protection, quality assurance, configuration management, maintenance, training and qualification, procedures, incident investigation, and records management. The areas of emergency management, safeguards, and security are also audited and assessed in accordance with the Emergency Plan, Fundamental Nuclear Material Control Plan, and Physical Security Plan.

Approved procedures and guidance used to plan, schedule, and perform the audits and assessments contain the following information:

Activities to be audited and assessed.

Qualifications for auditors/assessors.

Frequency of audits/assessments.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-13 Applicable guidance to be used in conducting the reviews.

Responsibilities for each phase of the reviews.

Instructions for recording the results, and recommending and approving actions to be taken.

The levels of management to which results are reported.

Results, including findings and observations, are captured in the corrective action program.

Corrective actions to prevent recurrence are assigned to owners, documented, and tracked to completion in accordance with the requirements specified in the corrective action program.

11.5.1 Internal Audits Internal audits are compliance-based evaluation activities with an objective of verifying compliance of operations with established regulatory requirements, license commitments, and standard industry practice. Audits also ensure that administrative IROFS remain available and reliable to perform their intended safety function over extended periods of operation.

Members of the regulatory affairs functions, as described in Chapter 2, perform audits of activities involving the handling of SNM, including support areas, on a scheduled basis as defined in approved procedures.

Members of the Quality Assurance discipline periodically audit facility programs as directed by plant management.

11.5.2 Independent Assessments Independent assessments are performance-based evaluation activities conducted to assess the effectiveness of health, safety, and environmental compliance functions in achieving their designated purpose, particularly in providing reasonable assurance of the availability and reliability of IROFS. The assessments are conducted using offsite groups or individuals not involved in the licensed activity.

11.6. Incident Investigations and Corrective Action A corrective action program is implemented through approved procedures to investigate and document events for operations involving special nuclear materials, including those required to be reported under 10 CFR 70.50, 70.62, and 70.74. Events, including those with conditions adverse to safety or quality, are reported, investigated, tracked, and corrective actions are assigned through a formal corrective action program. A risk-based approach is used to establish the requirements for determining specific or generic root cause(s) and generic implication(s) of events.

Events are reviewed and classified based on the safety significance and regulatory compliance, including the impact on the health and safety of the public and the environment; impact on reliability or availability of safety controls and/or; and impacts to regulatory commitments. When

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-14 recurrence would have an impact on the availability and reliability of IROFS, measures are taken to prevent recurrence and/or to control affected work in progress.

11.6.1 Conduct of Incident Investigations A risk-based approach is applied to the assignment of the level of investigation; and, based on severity or potential severity of the event, the investigation may be conducted by one or more individual(s). Levels of investigation, as well as reviews and approvals, are assigned for events in accordance with approved procedures. Corrective actions are developed, documented, approved, and implemented. Procedural guidance for conducting an investigation defines responsibilities for investigators and approvers; general methods for conduct of investigations; and requirements for report preparation, approval, and distribution. A risk-based approach is applied to prioritize completion of corrective actions so that conditions adverse to safety or quality are corrected as soon as practicable. The process used to monitor corrective actions also includes verification of completion, and as applicable, reviews of effectiveness and management attention for those corrective actions deemed ineffective.

Corrective actions generated from investigations are used to make corrections and improvements (i.e., lessons learned) necessary to prevent or minimize single or common-mode failures. Details of the accident event sequence(s) are compared with accident sequence(s) already considered in the ISA, and the ISA Summary will be modified to include evaluation of the risk associated with accidents of the type experienced.

Auditable records and documentation related to events, investigations, and root cause analysis are maintained as described in approved procedures. Procedures require maintenance of all documentation relating to events for two years (or for the life of the operation), whichever is longer. This documentation will also be used as part of a lessons learned program that may be applied to future operations of the facility.

11.7 Records Management A records management system, as applied to licensed regulatory and quality assurance activities, is maintained in accordance with approved procedures.

Information related to occupational exposure of personnel to radiation, releases of radioactive materials to the environment, and other pertinent activities, are maintained in such a manner as to demonstrate compliance with license conditions and the relevant regulatory requirements of 10 CFR 20.

All records pertaining to safety are retained for at least two years unless longer retention is required by other regulatory or license specifications. For example, records of major changes implemented under 10 CFR 70.72 will be maintained until termination of the license. Major changes are defined in 11.1.4.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-15 Records management procedures (a) assign responsibilities for records management, (b) specify the authority needed for records retention or disposal, (c) specify which records must have controlled access and provide the controls needed, (d) provide for the protection of records from loss, damage, tampering, theft, or during an emergency, and (e) specify procedures for ensuring that the records management system remains effective.

A functional organization is in place to ensure prompt detection and correction of deficiencies in the records management system or its implementation. The records management procedures provide the following instructions to ensure that:

Records are prepared, verified, characterized, and maintained.

Records are legible, identifiable, and retrievable for their designated lifetimes.

Records are protected against tampering, theft, loss, unauthorized access, damage, or deterioration for the time they are in storage; and, Procedures are established and documented specifying the requirements and responsibilities for record selection, verification, protection, transmittal, distribution, retention, maintenance, and disposition.

Records are categorized by their relative importance to safety and/or regulatory compliance to identify record protection and storage needs and to designate the retention period for individual kinds of records. Records of IROFS failures are kept and updated in accordance with 10 CFR 70.62(a)(3). The decommissioning recordkeeping requirements of 10 CFR 70.25(g) are addressed in Chapter 10.

11.8 Other Quality Assurance (QA) Elements for IROFS The TRISO-X quality system consists of the organizational structure, procedures, processes, and resources needed to implement quality management. Other Quality Assurance (QA) elements are applied to IROFS to ensure that there is reasonable assurance that IROFS are available and reliable to perform their functions when needed, as further described in approved procedures.

The same level of management measures, including QA elements, are uniformly and consistently applied to IROFS irrespective of whether they are needed to prevent or mitigate intermediate or high consequence events.

1.

Organization and Responsibilities Chapter 2 provides the commitments associated with the organizational structure, authority, and responsibilities to ensure that activities involving the handling of SNM and/or IROFS are performed safely and in compliance with license and regulatory requirements.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-16

2.

Quality Assurance Program The QA Program is based on, but is not limited to, applicable requirements and guidance in ISO 9001:2015, under the overall responsibility of the Quality Assurance discipline.

Aspects of this program are applied to IROFS based on criteria including, but not limited to, type of IROFS (passive, active, enhanced administrative, administrative), complexity of design or fabrication, uniqueness of the item (commercially available or custom design),

history of supply and performance, evaluation of the suppliers qualifications, and/or industry accepted practices.

3.

Design Control Design control is an element of the Configuration Management Program as described in Section 11.1.2 and in approved procedures.

4.

Procurement Document Control Procurement documents include those necessary requirements to ensure that IROFS will be of the desired quality. These include the following, as appropriate:

Scope of work - description of services or items being procured.

Basic technical requirements including drawings, specifications, codes, and industrial standards with applicable revision data, test and inspection requirements, special requirements such as for designing, fabricating, cleaning, identification marking, erecting, packaging, handling shipping and storage.

QA requirements - the extent to which will depend upon the type and use of the item or services being procured.

Requirements for the control of nonconformances and changes, including provisions to control and report nonconformance and changes to products being delivered.

Requirements on sub-tier suppliers including the pass down of relevant technical and quality requirements.

Procurement documents and changes thereto are reviewed to ensure they include the appropriate requirements.

5.

Instructions, Procedures, and Drawings Section 11.4 includes the commitment that "activities involving the handling of SNM and/or IROFS are conducted in accordance with approved procedures". This section also describes the process for developing and implementing procedures. Drawings are controlled under the Configuration Management Program as described in Section 11.1.

6.

Document Control A process is in place for developing, implementing, and revising documents to provide reasonable assurance that the appropriate documents are in use (refer to Sections 11.1 and 11.4). Document changes are reviewed for adequacy and approved for implementation by authorized personnel.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-17

7.

Control of Purchased Items and Services The procurement of IROFS is controlled to ensure conformance with documented requirements. The controls provide the following, as appropriate: supplier (source) evaluation and selection; evaluation of objective evidence of quality furnished by the supplier; and examination of items or services upon delivery or completion. Suppliers will provide written quality documentation for evaluation prior to selection.

Sourcing activities are planned and documented to ensure a systematic approach to the procurement process. Supplier selection is based, in part, on an evaluation of the supplier's capability to provide items or services in accordance with the requirements of sourcing documents. Procedures for Supplier selection ensure relevant parties are included as necessary, including Quality Assurance, prior to the placement of orders.

Additional considerations may include complexity of design or fabrication, uniqueness of the item (commercially available or custom design), history of supply and performance, and/or industry accepted practices.

Supplier nonconformances may be identified either by TRISO-X or by the supplier.

Nonconforming items are not released for use until the nonconforming condition is reviewed and accepted by TRISO-X and implementation of the disposition is verified, except where otherwise controlled and documented according to approved procedures.

Records of supplier nonconformance are maintained.

Acceptance of purchased IROFS equipment will be performed to document evidence of compliance with the technical, quality and other requirements of the procurement document.

8.

Identification and Control of Items Controls are established to assure that only correct and accepted items are used or installed. Identification is maintained on the items or in documents traceable to the items, or in a manner that assures identification is established and maintained as described in this section.

Where specified, items having a limited operating or shelf life are identified and controlled to preclude use of items whose operating life or shelf life has expired.

Procedures provide for item identification consistent with the planned duration and conditions of storage.

9.

Control of Special Processes Special processes identified by Engineering that control or verify quality (for example, welding or nondestructive examination) are performed by qualified personnel using approved procedures in accordance with specified requirements, codes, or standards.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-18 When the outcome of the process is highly dependent on personal skills, such individuals are certified in accordance with specified requirements. When the outcome is highly dependent on control of process parameters, the process and equipment are prequalified in accordance with specified requirements. Special process plans and/or procedures prescribe the necessary equipment, process parameters, calibration, and acceptance criteria. Records are maintained of currently qualified personnel, processes, and equipment for special processes.

10.

Inspection Acceptance testing and/or inspection is a part of the Configuration Management Program which ensures that IROFS meet specified requirements prior to initial use. The Surveillance and Monitoring, Preventive Maintenance, and Functional Testing functions, as described in Section 11.2, provide assurance that IROFS continue to meet specified requirements by assuring that these testing and inspection activities are scheduled and implemented. Qualifications of inspection personnel and characteristics of items inspected, including those identified as IROFS, will be specified in approved procedures, specifications, or plans.

11.

Test Control Acceptance testing and/or inspection is a part of the Configuration Management Program which ensures that IROFS meet specified requirements prior to initial use. The Surveillance and Monitoring, Preventive Maintenance, and Functional Testing elements, as described in Section 11.2, provide assurance that IROFS continue to meet specified requirements by assuring that these testing and inspection activities are scheduled and implemented. Qualifications of testing personnel will be specified in approved procedures. Characteristics verified through testing are stated in approved test instructions.

12.

Control of Measuring and Test Equipment Measuring and Test Equipment (M&TE) used in activities affecting the availability or reliability of IROFS are controlled, calibrated, and adjusted at specified intervals to maintain equipment performance within required limits. Policies, plans, and procedures ensure that devices and standards used for measurement, tests, and calibration activities are of the proper type, range, and accuracy. Calibration control is not necessary for commercial devices such as rulers, tape measures, levels, and stop watches. A list of devices is established to identify those items within the calibration control system. This identification listing includes, as a minimum, the due date of the next calibration and any use limitations (when calibrated for limited use).

M&TE is calibrated at specified intervals or prior to use against equipment having a known valid relationship to nationally recognized standards. If no nationally recognized standard exists, the basis for calibration is documented. M&TE is properly handled and stored to

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-19 maintain accuracy. When M&TE is found to be out of calibration, as-found data are recorded, and an evaluation is made and documented as to the validity of previous inspection, test results, and of the acceptability of items previously inspected or tested.

Out-of-calibration devices are tagged or segregated and are not used until recalibrated.

When M&TE is consistently found to be out of calibration, it is repaired or replaced.

Calibrations are also performed when personnel performing measurements and tests deem the accuracy of the equipment suspect. Records are maintained and equipment is suitably marked or otherwise identified to indicate its calibration status

13.

Item Handling, Storage, and Shipping Materials and equipment are handled, stored, and shipped in accordance with design and procurement requirements to protect against damage, deterioration, or loss. Special coverings, equipment, and protective environments are specified and provided where necessary for the protection of particular items from damage or deterioration.

14.

Inspection, Test, and Operating Status Acceptance testing and/or inspection is a part of the Configuration Management Program which ensures that IROFS meet specified requirements prior to initial use. The Surveillance and Monitoring, Preventive Maintenance, and Functional Testing elements, as described in Section 11.2, provide assurance that IROFS continue to meet specified requirements by assuring that these testing and inspection activities are scheduled and implemented. The Configuration Management and Purchasing Programs have provisions for identifying and controlling items, including IROFS, to provide reasonable assurance that incorrect or defective items are not used.

15.

Control of Nonconforming Items Items and related activities that do not conform to specified requirements are controlled to prevent inadvertent installation or use. Nonconforming items are segregated, when practical. When segregation is impractical or impossible due to physical conditions (for example, size, weight, or access limitations), other measures are employed to preclude inadvertent use of the item.

Nonconforming items are reviewed and dispositioned. Further processing, delivery, installation, or use of the nonconforming item is controlled pending an evaluation and approved disposition by personnel as authorized in approved policies, plans, and/or procedures, and documented notification to affected organizations is provided.

The responsibility and authority for the evaluation and disposition of nonconforming items is defined in approved procedures.

Nonconformance documentation identifies the nonconforming item, describes the nonconformance, contains the disposition and any re-inspection requirements, and contains the appropriate signatures approving the disposition.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-20

16.

Corrective Action Reports of conditions adverse to safety or quality are promptly identified and entered into the Corrective Action Program (see Section. 11.6), which provides a means to evaluate the problem, identify the cause of the problem, assign appropriate corrective actions to be initiated, and track the corrective actions to closure. Prompt identification and effective corrective actions should provide reasonable assurance that repetition of the problem will be minimized.

17.

Quality Assurance Records The Records Management Program, as described in Section 11.7, has provisions for the identification, retention, retrieval, and maintenance of records that furnish evidence of the control of quality of IROFS.

18.

Audits Section 11.5 includes the commitments for scheduling and implementing audits and assessments.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-21 Table 11-1 Management Measures for IROFS Management Measures1 Passive Engineered Control Active Engineered Control Enhanced Administrative Control Administrative Control Configuration Management X

X X

X Controlled Listing Identification X

X X

X Drawing Identification X

X X

Set point analyses X

X X

Design Specifications X

X X

Safety Installation Verification X

X X

Pre-operational Safety Review X

X X

X Maintenance X

X X

X Periodic Functional Test X

X X

X - Note 2 Calibration X

X Verification after Maintenance X

X X

Pre-operational Tests X

X X

Training and Qualification X

X X

X Procedures X

X X

X Procedural Identification X

X Posting Identification X

X X

X Audits and Assessments X

X X

X Records Management X

X X

X Incident Investigations X

X X

X Other Quality Assurance Elements X

X X

X Note 1 - The management measures identified for each type of control are the minimum required, if applicable. For example, it is not possible to calibrate certain types of active engineered controls.

Note 2 - For frequently used equipment, functionality is readily apparent at each use (e.g., leaking valve visually noticed at use point when valve is operated). Therefore, a periodic functional test is not required.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-22 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0011 to header.

Introduction Clarified application of management measures is based on type of control due to TX0-REG-LTR-0041, QA/Mgt Measures RAI 1-2.

Section 11.1.2 Added new sentence to state applicable codes and standards are identified in design documents due to TX0-REG-LTR-0029, QA/Mgt Measures RAI 1-2.

Section 11.8 Changes in this section (except Item 9) due to TX0-REG-LTR-0041, QA/Mgt Measures RAI 1-2.

Item 9 changes due to TX0-LTR-0020, RAI 1-5.

Table 11-1 Added due to TX0-REG-LTR-0041, QA/Mgt Measures RAI 1-2.

Revision Summary Added revision summary to end of chapter.

3 Dec-25 11.1.1 Added clear commitment for the process buildings to be maintained under the CM Program based on TX0-REG-LTR-0080 RAI-6 response.

11.1.2 Revised first paragraph based on TX0-REG-LTR-0089 Set 16 supplemental information for RAI-9 response.

11.3.2 Removed graded based on TX0-REG-LTR-0089 RAI-5 response.

11.4 Added including subjects such as design, inspections and testing, to first paragraph based on TX0-REG-LTR-0078 RAI-10 response.

Added procedure detail to second paragraph based on TX0-REG-LTR-0078 RAI-10 response.

11.4.5 Removed graded based on TX0-REG-LTR-0089 RAI-5 response.

11.5 Clarified information for audits and assessments based on TX0-REG-LTR-0089 RAI-11 response.

11.6 Added or quality based on TX0-REG-LTR-0078 RAI-20 response.

Removed graded based on TX0-REG-LTR-0089 RAI-5 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0011 SNM-XXXX CHAPTER 11 Revision 3 December 2025 Page 11-23 Added sentence for preventing recurrence based on TX0-REG-LTR-0089 RAI-21 response.

11.6.1 Removed graded based on TX0-REG-LTR-0089 RAI-5 response.

Removed sentence for measures to prevent recurrence based on TX0-REG-LTR-0089 RAI-21 response.

Added or quality based on TX0-REG-LTR-0078 RAI-20 response.

11.8, Item 3 Clarified reference to Section 11.1.2 based on TX0-REG-LTR-0089 RAI-9 response.

11.8, Item 4 Removed 10 CFR 21 reference based on TX0-REG-LTR-0089 RAI-22 response.

11.8, Item 7 Added sentence for supplier selection based on TX0-REG-LTR-0089 RAI-15 response.

11.8, Item 10 Clarified that qualifications of inspection personnel will be specified in approved procedures based on TX0-REG-LTR-0089 RAI-17 response.

11.8, Item 11 Clarified that qualifications of testing personnel will be specified in approved procedures based on TX0-REG-LTR-0089 RAI-17 response.

11.8, Item 15 Added in approved procedures to evaluation and disposition of nonconforming items based on TX0-REG-LTR-0078 RAI-19 response.

11.8, Item 16 Added or quality based on TX0-REG-LTR-0078 RAI-20 response.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0012 SNM-XXXX CHAPTER 12 Revision 2 December 2024 Page 12-1 MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Table of Contents SECTION TITLE STARTS ON PAGE 12.1 Fundamental Nuclear Material Control Plan 12-2 12.2 Fundamental Nuclear Material Control Plan Implementation 12-2 12.3 Amendment of the Fundamental Nuclear Material Control Plan 12-3

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0012 SNM-XXXX CHAPTER 12 Revision 2 December 2024 Page 12-2 MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL 12.1 Fundamental Nuclear Material Control Plan TRISO-X maintains a Fundamental Nuclear Material Control Plan (FNMCP) for licensed Category II - Fuel facilities/licensees authorized to possess Special Nuclear Material (SNM) of moderate strategic significance, as defined in 10 CFR 74.4. 10 CFR 70.22(b) requires that the application contain a full description of the program for control and accounting of SNM in the licensees possession authorized by the license. The FNMCP demonstrates how compliance with the applicable requirements of 10 CFR 74.31, 74.33, 74.41, or 74.51 is accomplished. Based upon the possession limits identified in the license application, the requirements contained within 10 CFR 74.41, nuclear material control and accounting for special nuclear material of moderate strategic significance, is applicable to the TRISO-X Fuel Fabrication Facility. The FNMCP provides the full description of this program.

The TRISO-X FMNCP addresses commitments regarding the material control and accounting (MC&A) program in the following areas:

1.

Management structure and personnel qualification and training

2.

Measurement systems

3.

Measurement-control system

4.

Use of statistics to ensure requirements are met

5.

Conduct of periodic physical inventories and reconciliation of book records to the results of the physical inventories

6.

Item-control system

7.

Shipper/receiver comparisons

8.

Independent assessment of the MC&A program

9.

Tamper-safing (Use of Tamper Indicating Devices)

10.

Designation of material balance areas, item-control areas, and custodians

11.

Resolving indications of loss, theft, diversion, or misuse of SNM

12.

Assisting in the investigation and recovery of missing SNM

13.

Recordkeeping 12.2 Fundamental Nuclear Material Control Plan Implementation The requirements of the FNMCP are implemented through approved procedures and controlled software used for the accounting of SNM.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0012 SNM-XXXX CHAPTER 12 Revision 2 December 2024 Page 12-3 12.3 Amendment of the Fundamental Nuclear Material Control Plan The Fundamental Nuclear Material Control Plan is maintained as needed. TRISO-X may modify this FNMCP without receiving prior NRC Approval provided the change does not decrease the effectiveness of the MC&A program. When such a change is made, the licensee notifies the NRC of the change within six months of the date the change is implemented by providing a report containing a description of the change and justification of why the change does not decrease the effectiveness of the program, in accordance with 10 CFR 70.32(c)(2)(ii). The licensee obtains NRC approval of modifications to the plan in accordance with 10 CFR 70.34 if the modification would result in a decrease the effectiveness of the MC&A program. The policies used to control changes to the FNMCP and ensure that only the current version is used are described in Chapter 11.

Proposed changes to the plan that decrease its effectiveness will not be implemented without prior approval by the NRC.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0012 SNM-XXXX CHAPTER 12 Revision 2 December 2024 Page 12-4 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0012 to header.

12.3 Corrected typographical error due to TX0-REG-LTR-0031, Observation bullet 1.

Revision Summary Added revision summary to end of chapter.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0013 SNM-XXXX CHAPTER 13 Revision 2 December 2024 Page 13-1 PROTECTION OF SPECIAL NUCLEAR MATERIAL Table of Contents SECTION TITLE STARTS ON PAGE 13.1 Physical Security Plan 13-2 13.2 Physical Security and SGI Plan Implementation 13-2 13.3 Amendment of the Plans 13-2

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0013 SNM-XXXX CHAPTER 13 Revision 2 December 2024 Page 13-2 PROTECTION OF SPECIAL NUCLEAR MATERIAL 13.1 Physical Security Plan TRISO-X maintains a Physical Security Plan (PSP) for licensed Category II - Fuel facilities/licensees authorized to possess special nuclear material (SNM) of moderate strategic significance, as defined in 10 CFR 74.4. The PSP maintains a physical protection system, as required by 10 CFR Part 73, Physical Protection of Plants and Materials, and 10 CFR Part 70, Domestic Licensing of Special Nuclear Material. The physical protection system provides reasonable assurance that activities involving the protection of SNM are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety. The PSP demonstrates compliance with the applicable requirements. The PSP provides the full description of the security program.

TRISO-X maintains a Safeguards Information Plan (SIP) that establishes, implements, and maintains an information protection system for Safeguards Information (SGI) generated for the TRISO-X Fuel Fabrication Facility to satisfy the requirements outlined in 10 CFR Part 73 and ensure SGI is protected from unauthorized disclosure.

13.2 Physical Security and SGI Plan Implementation The requirements of the PSP are implemented through passive and active engineered features and approved procedures. The requirements of the SIP are implemented through approved procedures.

13.3 Amendment of the Plans The Physical Security Plan is maintained as needed. TRISO-X may modify the PSP and/or SIP without receiving prior NRC Approval provided the change does not decrease the effectiveness of the security plan in accordance with 10 CFR 70.32(e). When such a change is made, the licensee notifies the NRC of the change within two months of the date the change is implemented by providing a report containing a description of the change and justification of why the change does not decrease the effectiveness of the security plan. The licensee obtains NRC approval of modifications to the plan in accordance with 10 CFR 70.34 if the modification would result in a decrease the effectiveness of the security plan. The policies used to control changes to the PSP and SIP that ensure that only the current version is used are described in Chapter 11. Proposed changes to a plan that decrease its effectiveness will not be implemented without prior approval by the NRC.

NRC SPECIAL NUCLEAR MATERIAL LICENSE TXF-REG-NRC-0013 SNM-XXXX CHAPTER 13 Revision 2 December 2024 Page 13-3 REVISION

SUMMARY

Revision Date Section/Page Description of Changes 1

5-Apr-22 ALL Initial issue.

2 Dec-24 ALL Added document number TXF-REG-NRC-0013 to header.

Revision Summary Added revision summary to end of chapter.