Shawn Hafen Site Vice President Monticello Nuclear Generating Plant Northern States Power Company 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000263/2025402
Dear Shawn Hafen:
On September 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at a reduced staffing levels throughout the duration of the shutdown.
However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300.
On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
December 18, 2025
S.Hafen 2
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000263 License No. DPR-22
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV Signed by Ziolkowski, Michael on 12/18/25
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RIII/DRSS RIII/DRSS NAME KMaloney:dc MZiolkowski DATE 12/17/2025 12/18/2025
Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:
05000263 License Number:
DPR-22 Report Number:
05000263/2025402 Enterprise Identifier:
I-2025-402-0051 Licensee:
Northern States Power Company, Minnesota Facility:
Monticello Nuclear Generating Plant Location:
Monticello, MN Inspection Dates:
September 22, 2025, to September 25, 2025 Inspectors:
G. Bonano, Physical Security Inspector K. Maloney, Sr Physical Security Inspector Approved By:
Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS 71130.05 - Protective Strategy Evaluation The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
(1) 2.01 a, b, d, e, f, g, h, i, k; 2.02 a-c; 2.04 b; 2.06 a, d, f, g, h, i, j, n; 2.08; 2.10 a.
(2)
Observed Annual Force on Force exercise on 9/24/2025 71130.09 - Security Plan Changes Security Plan Changes (1 Sample)
(1) 02.01 a-e Since the last NRC baseline inspection of this program area, Security Plan Revision 21 to 22 was implemented. Based on the licensee's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s) continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.
4 OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
(1 Sample)
(1)
January 1, 2024, through June 30, 2025 INSPECTION RESULTS No findings were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
On September 25, 2025, the inspectors presented the security baseline inspection results to Shawn Hafen and other members of the licensee staff.
5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 2023 Security Drill & Exercise Drill Records 12/1/2023 2024 Security Drill & Exercise Drill Records 12/8/2024 Miscellaneous 2025 Partial Security Drill & Exercise Drill Records 0
FP-S-FSIP-01 Security Compensatory Measures 22 FP-S-FSIP-05 Security Patrols 17 FP-S-FSIP-08 Contingency Plan Implementing Procedure 21 FP-S-FSIP-09 Alarm Response 13 FP-S-FSIP-12-A Security System Description and Standards, Attachment A 8
QF-2418 Responder Timeline Worksheet 1
71130.05 Procedures QF2419 Adversary Timeline Worksheet 1
Activity/Change AR#:
602000036406 PHYS-SEC-Plan (Physical Security Plan) 21 L-MT-25-007 Xcel Energy Letter to NRC Changes to the MNGP Security Plan 03/25/2025 MNGP PSP Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Plan 22 71130.09 Miscellaneous QF0398 (FP-S-FSIP-17)
Security Change/Activity Screening and Evaluation 16 71151 Miscellaneous QF0445 NRC and MOR Data Collection and Submittal Forms 19