ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street l Crystal River, FL 34428 Page 1 of 3 Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com 3F1025-01 10 CFR 50.90 October 15, 2025 10 CFR 50.82 (a)(9)
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Docket Nos. 50-302 & 72-1035, Operating License Number DPR-72 Crystal River Unit 3 Nuclear Power Station
Subject:
License Amendment Request 263 Addition of License Condition 2.C.21, License Termination Plan
Dear Commissioners and Staff,
In accordance with 10 CFR 50.90 and 10 CFR 50.82(a)(9), ADP CR3, LLC (ADP CR3) hereby submits the enclosed application requesting an amendment to Facility Operating License, No.
DPR-72, for Crystal River Unit 3 Nuclear Power Station (CR3). The enclosed License Amendment Request (LAR) proposes to add License Condition 2.C.21 that approves the License Termination Plan (LTP) and adds a license condition that establishes the criteria for determining when changes to the LTP require prior NRC approval.
The LTP demonstrates that the remaining decommissioning activities will be performed in accordance with 10 CFR 50, will not be adverse to the common defense and security or to the health and safety of the public, and will not have an adverse effect on the quality of the environment. provides a description and evaluation of the proposed changes that include the no significant hazards consideration determination and environmental consideration. Enclosure 2 contains the proposed markup of the wording change to the Operating License and the retyped Operating License pages. Enclosure 3 contains the LTP that is being submitted to the NRC at least 2 years prior to planned license termination, and upon NRC approval, will become a supplement to the CR3 Defueled Safety Analysis Report (DSAR). ADP CR3 is submitting the additional enclosed technical documents and reports to aid in the review of the License Termination Plan: CHAR-05 CR3 Site Building Characterization Survey, 2024. 2025 Groundwater Characterization Report CHAR-08 CR3 Intake and Discharge Canal Characterization Summary Report, 2024.
Page 2 of 3 CHAR-09 Impacted Open Land Area At-Depth Survey and Sampling, 2024. Radiation Safety and Control Services (RSCS), Historical Site Assessment for Crystal River 3, June 2016. 50.75(g) List of Events/Issues Affecting ADP-CR3 Areas 0 ADP CR3 Classification Position Paper of Survey Unit EOCZ-04, December 19, 2023. 1 ADP CR3, LLC, History of settling pond activity levels and work activity, May 20, 2025. 2 Groundwater Well and Withdrawal Permit Limits Under the Florida Department of Environmental Protection Regulations, March 2024. 3 Technical Support Document, Guideline for Embedded and Buried Pipe Detector Calibration and Usage, Revision 1, January 2025. 4 CHAR-01 Impacted Open Land Survey Areas, 2024. 5 Florida Department of State, 2023. DHR Project File No.: 2019-8882-C Historic Preservation Officer Review 6 North Star, 2025. Technical Support Document, Application of NaI Detector for Scans and Statics at CR3, September 2025. 7 Haley & Aldrich, Inc., Sodium and Chloride Groundwater Data from Wells Within the NRC Licensed Area, May 2024. 8 Crystal River Unit 3 (CR3) - Decommissioning End State. 9 Evaluation of Soil Background Concentrations at Crystal River Unit 3, ADP-CR3, 2025.
There are no new regulatory commitments contained within this letter.
ADP CR3 has evaluated the proposed License Amendment against the criteria of 10 CFR 50.92 and determined that no significant hazards is involved.
In accordance with 10 CFR 50.91(b), ADP CR3 is providing a copy of this submittal to the State of Florida.
ADP CR3 requests approval of the proposed license amendment by October 15, 2026. Once approved, the amendment will be implemented within ninety (90) days following the approval of the NRC.
If you wish to discuss the information in the enclosures, please contact Mr. John Jernigan at (352) 342-0792.
I state under penalty of perjury that the foregoing is true and correct. Executed on October 15, 2025.
Page 3 of 3 Sincerely, Billy Reid, Site Executive cc: Regional Administrator, Region 1 NMSS Project Manager State of Florida