Jeffrey Remick Director Nuclear Plant Security Duke Energy Progress, LLC 3581 West Entrance Rd RNPA12 Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2025402
Dear Jeffrey Remick:
On August 7, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000261 License No. DPR-23
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV August 14, 2025 Signed by Worosilo, Jannette on 08/14/25
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DFRSS/NSB RII/DFRSS/NSB RII/DFRSS/NSB RII/DFRSS/NSB NAME J. Brown J. Stovall D. Egelstad J. Worosilo DATE 08/13/2025 08/13/2025 08/14/2025 08/14/2025
Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:
05000261 License Number:
DPR-23 Report Number:
05000261/2025402 Enterprise Identifier:
I-2025-402-0028 Licensee:
Duke Energy Progress, LLC Facility:
H. B. Robinson Steam Electric Plant, Unit 2 Location:
Hartsville, SC Inspection Dates:
August 04, 2025, to August 07, 2025 Inspectors:
J. Brown, Senior Physical Security Inspector D. Egelstad, Physical Security Inspector J. Stovall, Physical Security Inspector Approved By:
Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H. B. Robinson Steam Electric Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS 71130.02 - Access Control The inspectors evaluated the access control program through completion of the following inspection elements:
Access Control (1 Sample)
(1)
Tier I: 02.01 (b, c, d); 02.02 (a, c, d, e, f); 02.03 (a); 02.04 (a, c, d, e); 02.05 (a).
Tier II: 02.06 (c); 02.08 (a); 02.08 (c); 02.08 (e).
Tier III: 02.09.
71130.05 - Protective Strategy Evaluation The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
(1)
Tier I: 02.01 (b, c, d); 02.02 (a - f); 02.04 (b, d, e).
Tier II: 02.06 (a, b, d, f, g, i, n); 02.07 (a).
Tier III: 02.08; 02.09 (a, b).
(2)
Observed a licensee-conducted force-on-force exercise 71130.09 - Security Plan Changes The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1)
(Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity
4 covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.
OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
(1 Sample)
(1)
August 1, 2024, through July 31, 2025 INSPECTION RESULTS No findings were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
On August 7, 2025, the inspectors presented the security baseline inspection results to Jeffrey Remick and other members of the licensee staff.
5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71130.02 Miscellaneous AD-PI-ALL-0700 Performance Indicators Revision 7 71130.02 Procedures AD-SY-ALL-0210 Site Access Controls Revision 13 71130.02 Procedures AD-SY-ALL-0215 Security Search and Entry Processing Revision 17 71130.02 Procedures AD-SY-ALL-0240 Security Key and Lock Controls Revision 3 71130.05 Corrective Action Documents 2541831; 2541869; 2542433; 2547474; 2559622; 2559681 71130.05 Miscellaneous RNP Security Protective Strategy Briefing 71130.05 Miscellaneous Annual FOF and Quarterly TRD Documentation 71130.05 Miscellaneous Nuclear Oversight Audit Robinson Physical Security 2024-RNP-SEC-01 09/09/2024 71130.05 Procedures AD-PI-ALL-0300 Self-Assessment and Benchmark Programs - Self-Assessment Report Revision 8 71130.05 Procedures AD-SY-ALL-0120 Safety Security Interface Processes Revision 4 71130.05 Procedures AD-SY-ALL-0150 - Reporting Safeguards, Security Events Log Revision 2 71130.05 Procedures AD-SY-ALL-0254 RNP Protective Strategy (SGI)
Revision 3 71130.05 Procedures AD-SY-ALL-0560 Security Drill and Exercise Program Revision 11 71130.05 Procedures AD-SY-ALL-1000 Conduct of Security Revision 13 71130.05 Procedures AD-SY-RNP-0130 RNP Formal Target Sets Revision 2 71130.05 Procedures AD-SY-RNP-0251 Contingency Response Revision 1 71130.05 Procedures AD-SY-RNP-0254 RNP Protective Strategy Revision 3 71130.09 Procedures AD-PI-ALL-0700 Performance Indicators Revision 7 71151 Miscellaneous Various RNP Performance Indicator Tracking Documents August 2024-July 2025 71151 Miscellaneous RNP PI Normalization Data