ML25219A474

From kanterella
Jump to navigation Jump to search

License Amendment Request to Terminate the NRC Preemption Authority, Acceptance Review
ML25219A474
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/20/2025
From: Amy Snyder
Reactor Decommissioning Branch
To: Fleming J
Holtec
References
L-2025-LLN-0011
Download: ML25219A474 (1)


Text

Jean Fleming, Vice President Licensing, Regulatory Affairs, and PSA Holtec International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

INDIAN POINT ENERGY CENTER - ACCEPTANCE REVIEW OF LICENSE AMENDMENT REQUEST TO TERMINATE NUCLEAR REGULATORY COMISSION PREEMPTION AUTHORITY AT INDIAN POINT ENERGY CENTER (L-2025-LLN-0011)

Dear Jean Fleming:

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your letter dated July 23, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25204A155), as supplemented on August 19, 2025 (ML25231A152), requesting the NRC review and approval of the license amendment request to terminate the NRC preemption authority at the Indian Point Energy Center (IPEC). The NRC staff performed an acceptance review of your application to determine if the application contains sufficient technical information to allow the staff to complete the detailed technical review.

The purpose of this letter, based on the NRC staffs acceptance review, is to inform you that we have not identified any administrative omission or deficiencies that would prevent us from proceeding with a detailed review. Your submittal is accepted for a detailed technical review and is assigned Enterprise Project Identification Number (EPID) L-2025-LLN-0011. Please reference this EPID number with Docket Numbers50-003, 50-247, 50-286 and 72-051 in any future correspondence associated with this request.

Please note that the NRC staffs technical review of your submittal may identify issues that require additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by December 15, 2025. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, the NRC staff estimates that completing the review of your submittal will require approximately 60 staff hours.

In accordance with 10 CFR 2.390, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. Please note that the enclosure to your letter contains sensitive, security-related information, and is therefore deemed Official Use Only. It will not be placed in the Public Document Room, nor will it be publicly available in the NRC ADAMS.

August 20, 2025

J. Fleming If you have any questions concerning the above, please contact me at 301-415-6822 or via email at Amy.Snyder@nrc.gov.

Sincerely, Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos: 50-003, 50-247, 50-286, and 72-051 License Nos: DPR-05, DPR-26, and DPR-64 cc: Indian Point ListServ W.Wittich, w.wittich@holtec.com Signed by Snyder, Amy on 08/20/25

ML25219A474; Ltr ML25219A474 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NSIR/DPCP/MSB NMSS/DUWP/RDB NAME ASnyder MSutherland JWillis ASnyder DATE Aug 7, 2025 Aug 11, 2025 Aug 7, 2025 Aug 20, 2025