Letter Sequence Other |
|---|
EPID:L-2024-SLE-0003, Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 (Approved, Closed) |
Results
Other: ML24344A110, ML25209A021, ML25209A022, ML25209A023, ML25209A057, ML25210A019, NUREG-1437, Supp. 17, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 17, Second Renewal Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 Final Rep, RS-24-058, Regarding Subsequent License Renewal Environmental Review
|
MONTHYEARML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 Project stage: Request RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review Project stage: Other ML24327A1642024-11-22022 November 2024 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Peach Bottom SLR and Concurrence with Not Likely to Adversely Affect Finding for Northern long-eared and Tricolored Bats Project stage: Request ML24344A1102024-12-13013 December 2024 Suppl Env Audit Summary Letter Project stage: Other ML25035A0012025-02-28028 February 2025 Schedule for the Supplemental Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Approval ML25114A0472025-05-22022 May 2025 NOA of Generic EIS for Lic Renew of Nuclear Plants, Supp 10, 2nd Renew, Re Sub Lic Renew for Peach Bottom Atomic Power Sta, Units 2 and 3, Suppl 1, Draft Rpt for Comment Project stage: Draft Other ML25209A0572025-08-21021 August 2025 Letter to Applicant NOA of Peach Bottom SLR Final Supplement Project stage: Other NUREG-1437, Supp. 17, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 17, Second Renewal Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 Final Rep2025-09-30030 September 2025 NUREG-1437, Supp. 17, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 17, Second Renewal Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 Final Rep Project stage: Other ML25209A0212025-09-30030 September 2025 SLR License DPR-44 Project stage: Other ML25209A0232025-09-30030 September 2025 Record of Decision for SLR Date Restoration Project stage: Other ML25209A0222025-09-30030 September 2025 SLR License DPR-56 Project stage: Other ML25210A0192025-09-30030 September 2025 Completion of SLR Site Specific Environmental Review Modification of Licenses Project stage: Other 2024-06-05
[Table View] |
Text
Page 15 Subsequent Renewed License No. DPR-56 Amendment No. 348
- 2.
Constellation Energy Generation, LLC shall complete those activities by the 6-month date prior to the subsequent period of extended operation or by the end of the last refueling outage before the subsequent period of extended operation, whichever occurs later.
- 3.
Constellation Energy Generation, LLC shall notify the NRC in writing within 30 days after having accomplished item (b)1 above and include the status of those activities that have been or remain to be completed in item (b)2 above.
(20) PRA Model Updates to Support Implementation of the Risk Informed Completion Time (RICT) Program Constellation Energy Generation, LLC is approved to implement TSTF-505, Revision 2, modifying the Technical Specification requirements related to Completion Times (CT) for Required Actions to provide the option to calculate a longer, risk-informed CT. The methodology for using the new Risk-Informed Completion Time (RICT) Program is described in NEI 06-09-A, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines, Revision 0, which was approved by the NRC on May 17, 2007.
- 3.
This subsequent renewed license is effective as of the date of issuance and shall expire at midnight on July 2, 2054.
FOR THE UNITED STATES NUCLEAR REGULATORY COMMISSION
/RA/
Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:
Appendix A - Technical Specifications Peach Bottom Atomic Power Station Unit No. 3 Appendix B - Environmental Protection Plan Date of Issuance: March 5, 2020