ML25182A294

From kanterella
Jump to navigation Jump to search
Nuclear Power Plant - Security Baseline Inspection Report 05000400/2025402
ML25182A294
Person / Time
Site: Harris 
Issue date: 07/01/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Faulk L
Duke Energy Progress
References
IR 2025402
Download: ML25182A294 (1)


Text

Linwood Faulk Director, Nuclear Plant Security Duke Energy Progress, LLC 5413 Shearon Harris Road Mail Code HNP01 New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000400/2025402

Dear Linwood Faulk:

On June 26, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant and discussed the results of this inspection with Sarah McDaniel and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000400 License No. NPF-63

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV July 1, 2025 Signed by Worosilo, Jannette on 07/01/25

ML25182A294 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DFRSS/NSB RII/DFRSS/NSB NAME R. Womack J. Worosilo DATE 07/01/25 07/01/25

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:

05000400 License Number:

NPF-63 Report Number:

05000400/2025402 Enterprise Identifier:

I-2025-402-0026 Licensee:

Duke Energy Progress, LLC Facility:

Shearon Harris Nuclear Power Plant Location:

New Hill, SC Inspection Dates:

June 23, 2025, to June 26, 2025 Inspectors:

J. Tornow, Physical Security Inspector R. Womack, Senior Physical Security Inspector Approved By:

Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS 71130.04 - Equipment Performance, Testing, and Maintenance The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

Tier I: All requirements Tier II: 02.09 a., b.; 02.11 a., d.

Tier III: 02.15 a., c.

71130.07 - Security Training The inspectors evaluated the security training program through completion of the following procedure elements:

Security Training (1 Sample)

(1)

Tier I: All requirements Tier II: 02.05 a., c.; 02.07 a.; 02. 09 a., b.

Tier III: 02.10; 02.11 a.; 02.13 a., c.; 02.14 a.

INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On June 26, 2025, the inspectors presented the security baseline inspection results to Sarah McDaniel and other members of the licensee staff.

4 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 02501686 01/19/2024 02502593 01/26/2024 02505187 02/15/2024 02513383 04/20/2024 02517979 02/15/2024 02546021 03/03/2025 02554351 05/13/2025 02556043 05/29/2025 02556207 06/10/2025 Corrective Action Documents 20289517 06/09/2025 Engineering Changes 401309 DESG Primary Documentation Revision 19 AD-SY-ALL-0580 Weapons Maintenance, Testing, and Accountability Revision 8 AD-SY-ALL-0610 Nuclear Security Equipment Maintenance Program Revision 1 AD-SY-HNP-0600 Testing and Inspection of Security Equipment and Barriers Revision 7 ORT-1408 Security Diesel Operability Run Revision 32 ORT-1422 Security Diesel Generator Load Bank Test Annual Interval All Modes Revision 2 71130.04 Procedures PM-M0103 Security Diesel Engine Operational Inspection Revision 7 Corrective Action Documents Resulting from Inspection 02559307 Initial Security FTO/TPE Evaluator Training Record (Samples)

Security Instructor Qualifications (Samples)

Armorer Certifications (Samples)

Individual Qualification Records (Samples)

OJT Hours Tracking Form (Samples)

LP-SY-ALL-0572 NRC Reportability Revision 1 71130.07 Miscellaneous LP-SY-HNP-0506 Vehicle Search Revision 4

5 Inspection Procedure Type Designation Description or Title Revision or Date LP-SY-NGO-0524 Security OJT and TPE 09/09/2021 TG-SY-HNP-0506 Armed Officer Tactical Qualification Course of Fire TG-SY-HNP-0530 Harris Nuclear Plant OJT/TPE Guide Revision 24 TG-SY-HNP-0530 Harris Nuclear Plant OJT/TPE Guide Revision 25 AD-SY-ALL-0190 Security Records Program Revision 6 AD-SY-ALL-0510 Security Program Systematic Approach To Training Revision 5 AD-SY-ALL-0520 Security Training Revision 8 AD-SY-ALL-0524 Security On-The-Job Training (OJT) and Task Performance Evaluation (TPE)

Revision 2 Procedures AD-SY-ALL-0540 Security Range Safety and Control Revision 11