June 25, 2025, Pre-Submittal Meeting Non-Proprietary Slides for License Amendment Request to Install Cobalt Burnable Absorbers to Breed Cobalt-60
ML25169A249
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/18/2025
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
References
EPID L-2025-LRM-0060 LR-N25-0057
Download: ML25169A249 (17)


Text

LR-N25-0057 Pre-Submittal Meeting Slides (Non-Proprietary)

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

2 Meeting Agenda Cobalt-60 Pre-Submittal Meeting

Introductions

Provide summary overview of scope of Co-60 program Describe outline and content of LAR

Change to Operating License Dose Consequence Evaluation Decay Heat Assessment Spent Fuel Pool Criticality COBA Testing to Date Digital Serialization Co-60 Implementation Schedule Questions / Comments Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

3 Overview of Cobalt-60 Program Cobalt-60 Pre-Submittal Meeting Collaboration between Westinghouse and Nordion Provide a domestic supply of Co-60 for irradiation services

Gamma source for sterilization of single-use medical devices

Food and pharmaceutical ingredient irradiation

Global shortage in Co-60 sources Cobalt Burnable Absorbers (COBAs) inserted into fuel assemblies

Fuel insert similar to WABAs

Neutron irradiation of [

]a,c within each rodlet

[

]a,c

Core location of COBAs optimized for each cycle of irradiation COBA capsule harvesting in SFP by Westinghouse and shipped to Nordion

Blended with other Co-60 slugs to create finished sources of specific activity Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)
      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

5 Outline / Content of LAR Cobalt-60 Pre-Submittal Meeting LAR to provide overview of key analyses and testing supporting COBA

Structural integrity

Thermal hydraulics

Vibration and wear

Mechanical creep

Corrosion

Analysis of COBA failure

Co-60 capsule positioning

Nuclear Design LAR sections will reference Westinghouse Supporting Information

General and Site-Specific Attachments to LAR - proprietary and redacted versions Site specific assessment and analyses

Chemistry sampling for Co-60

Co-60 impacts to Chapter 15 LOCA dose consequences

Dose and decay heat analysis for SFP and cask pit area

Decay heat addition to RCS for normal, upset and ELAP events Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

6 License Changes Cobalt-60 Pre-Submittal Meeting Changes to Salem FOL

Allow for transfer/use of Co-60 in accordance with 10 CFR Part 30

Allow for production, possession, receipt and transfer of Co-60

Similar changes made for Hope Creek Co-60 initiative

Allows production & transfer of Part-30 source material within a Part-50 license

Describe COBA SFP storage requirements

Ensures gamma flux limits are within 1010 MeV/cm2-sec limit for SFP concrete Mark-ups of FOL changes in LAR attachment Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

7 Dose Consequence Evaluations Cobalt-60 Pre-Submittal Meeting COBA design limits Chapter 15 Impact

Detection of Co-60 via routine RCS chemistry sampling

Co-60 source term non-gaseous

Only affects events with direct RCS release LOCA dose consequences revised for additional Co-60 source term

[

]a,c

Results of dose consequence analyses show a not more than minimal

(<10%) increase due to Co-60

Calculation changes performed under 50.59 Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

8 Decay Heat and Gamma Energy Assessment Cobalt-60 Pre-Submittal Meeting Contribution of COBA decay heat evaluated

Normal Shutdown Cooling

Loss of RHR at Mid-loop / Natural Circ Cooldown

Flex Operation

SFP Cooling Sufficient cooling margin exists to accommodate additional COBA heat Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

9 Decay Heat and Gamma Energy Assessment cont.

Cobalt-60 Pre-Submittal Meeting COBA decay heat/gamma energy accident analyses

Small and Large Break LOCA

LOCA Containment Integrity

Post-LOCA Long Term Cooling

SGTR

Steam Line Break and Locked Rotor Steam Release Sufficient margin in all events to ensure adequate cooling COBA gamma energy incident on wall and floor of SFP and cask pit

Impact to SFP floor is minimal

Impact to SFP walls maintained by plant procedures based on time of offload Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

10 10 Spent Fuel Criticality Analysis Cobalt-60 Pre-Submittal Meeting Plant specific SFP criticality analysis updated with RG 1.240 including operating with COBA Updates the new fuel storage area analysis WCAP report generated with all pertinent details

Pre-submittal meeting held with staff March 6, 2025

LAR S25-02 for new criticality analysis submittal June/July 2025 Presence of COBA treated as a conservative penalty in SFP criticality analysis Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

11 11 COBA Testing to Date Cobalt-60 Pre-Submittal Meeting CFD Validation Testing

Performed at WEC Churchill facility at PWR conditions: pressure, temperature, thimble tube flow, capsule heating

Flow rates measured in COBA rodlet, and thimble tube are similar to flow rates predicted in prior CFD analysis and other hydraulic predictions

Confirms that boiling does not occur for expected normal operating conditions in reactor Wear Testing

Also performed at WEC Churchill facility at PWR conditions

Unlike CFD testing, capsule heating was excluded in place of production capsules and slugs

The first COBA article showed no discernable wear after 6 weeks of testing.

The second COBA article just completed a 3-month duration and is currently being evaluated.

Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

12 12 Digital Serialization of Capsules Cobalt-60 Pre-Submittal Meeting

  • Digital Serialization ensures [

a,c

White paper submitted to NRC on February 7, 2025

Meetings with NMSS staff on April 17 and May 15

[

]a,c

Complies with NSTS requirements described in 10 CFR 20.2207 and maintains

[

]a,c

Approach to be further described within LAR Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)
      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

14 14 Co-60 Timeline Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

a,c

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

15 15 Questions / Discussion Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3 l © 2025 Westinghouse Electric Company LLC. All Rights Reserved.

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)

Thank

      • This record was final approved on 06/17/2025 18:29:13. (This statement was added by the PRIME system upon its validation)