| To: | Burgum D, Colosimo R, Driscoll D, Hassett K, Lutnick H, Scarlett K, Vought R US Dept of Commerce, Office of the Secretary, US Dept of Interior, Office of the Secretary, US Dept of the Army, Office of the Assistant Secretary, Civil Works, US Dept of the Army, Office of the Secretary, US Executive Office of the President, Council on Environmental Quality (CEQ), US Executive Office of the President, National Economic Council, US Executive Office of the President, Office of Mgmt & Budget (OMB) |
| References | |
| SRM-OGC250127-1, CORR-25-0065, EO 14156 | |
| Download: ML25164A123 (1) | |
Text
The U.S. Nuclear Regulatory Commission's June 2025 status report as required by Section 5(c) of Executive Order 14156, of January 20, 2025, "Declaring a National Energy Emergency" In accordance with Section 5(c) of Executive Order 14156, entitled "Declaring a National Energy Emergency," dated January 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) is providing the below list of all current and planned or potential NRC licensing actions that support the production, generation, and supply of domestic energy that may be subject to this requirement, as of June 30, 2025.
Changes in this Report The application for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Southern Nuclear Operating Co., Inc.), Subsequent License Renewal was accepted for review on June 13, 2025. The project has been moved from "Planned or Potential License Application Reviews" to "Current Licensing Reviews" (section 3.6) for this monthly status report.
The application for Project Matador (Fermi America), President Donald J. Trump Advanced Energy and Intelligence Campus, Fermi Units, 1-4, Combined License Application was submitted on June 17, 2025, and is listed under "Planned or potential license applications to construct or operate new energy generating facilities" (section 6.15) for this status monthly report.
The following projects have been removed from this report because ESA Section 7 consultations have been completed.
Framatome Fuel Fabrication Facility (Framatome), Amendments (multiple) to increase enrichment limits Louisiana Energy Services (LES) LLC, (Urenco USA), Amendment to increase enrichment limits for waste systems Palisades Nuclear Plant (Holtec Palisades, LLC), License Amendment Requests to restart operation of the power plant TRISO-X Fuel Fabrication Facility (TRISO-X, LLC), New Fuel Fabrication Facility*
License Current Licensing Reviews The ESA consultations for these licensing reviews are ongoing.
- 1. License applications to construct or operate new energy-generating facilities 1.1.
Kemmerer Power Station, Unit 1 (US SFR Owner, LLC [USO], a subsidiary of Terra Power, LLC), Construction Permit Application (Department of Energy [DOE]
Advanced Reactor Demonstration Program [ARDP] Awardee) 1.2.
Long Mott Generating Station (Long Mott Energy, LLC, a subsidiary of The Dow Chemical Company) (X-Energy Xe-100 technology), Construction Permit Application (DOE ARDP Awardee) 1.3.
Clinch River Nuclear Site (Tennessee Valley Authority), Construction Permit Application Enclosure
- 2. License applications actions to restart operation of nuclear power plant
- 3. License renewal or subsequent license renewal applications for operating nuclear power
~~
3.1.
Peach Bottom Atomic Power Station, Units 2 and 3 (Constellation Energy Generation, LLC), Subsequent License Renewal 3.2.
Browns Ferry Nuclear Plant (Tennessee Valley Authority), Subsequent License Renewal 3.3.
St. Lucie Plant, Units 1 and 2 (Florida Power & Light Co.), Subsequent License Renewal 3.4.
Dresden Nuclear Power Station, Units 2 and 3 (Constellation Energy Generation, LLC),
Subsequent License Renewal 3.5.
H.B. Robinson Steam Electric Plant, Unit 2 (Duke Energy Progress, LLC), Subsequent License Renewal 3.6.
Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Southern Nuclear Operating Co., Inc.),
- 4. License applications related to the exceedance of an operating nuclear power plant's incidental take statement
- 4.1.
Brunswick Steam Electric Plant, Units 1 and 2 (Duke Energy Progress, LLC),
exceedance of incidental take statement for species listed under the ESA 4.2.
St. Lucie, Units 1 and 2 (Florida Power & Light Co.), exceedance of incidental take statement for species listed under the ESA
- 5. License applications for nuclear fuel cycle facilities 5.1.
Dewey-Burdock (Powertech (USA) Inc.), Uranium In-Situ Recovery Facility License Renewal 5.2.
Crow Butte (Crow Butte Resources, Inc.), Uranium In-Situ Recovery Facility License Renewal 5.3.
Crownpoint Ur~nium Project (NuFuels, Inc.), Uranium In-Situ Recovery Facility License Renewal 5.4.
Paducah Laser Enrichment Facility (Global Laser Enrichment, LLC), New Fuel Enrichment Facility License Planned or Potential License Application Reviews The NRC currently anticipates the following license reviews based on a combination of the following factors: the potential applicant or licensee has selected a site, is considered within near-term budget planning, and has either submitted a letter of intent or regulatory engagement plan to the NRC or has held multiple pre-application meetings with NRC staff. This list does not include any propriety or non-public information.
- 6. Planned or potential license applications to construct or operate new energy generating facilities 6.1.
North Anna Site (Dominion Energy), Renewal of an Early Site Permit 6.2.
Belews Creek Site (Duke Energy Business Servies, LLC), Early Site Permit 6.3.
Palisades Site Holtec SMR-300 (Holtec, Inc.), Limited Work Authorization and Construction Permit Applications
- 6.4.
Energy Northwest Small Modular Reactor (SMR) Project (Energy Northwest), Xe-100 Construction Permit Application 2
6.5. Kemmerer Power Station, Unit 1 (USO, a subsidiary of TerraPower, LLC), Operating License Application (DOE ARDP Awardee) 6.6. Okie Aurora Powerhouse (Oklo Inc.), Combined License Application
- 6. 7.
Eielson Air Force Base (Department of Air Force), Construction Permit or Combined License Application 6.8. Texas A&M University RELLIS (Texas A&M), Construction Permit Application, Early Site Permit 6.9. Texas A&M University RELLIS -Aalo Small Modular Reactor (Texas A&M/Aalo ),
Construction Permit Application 6.10. Texas A&M University RELLIS - Natura Small Modular Reactor (Texas A&M/Natura),
Construction Permit Application 6.11. Texas A&M University RELLIS - Terrestrial Small Modular Reactor (Texas A&M/Terrestrial), Construction Permit Application 6.12. Texas A&M University RELLIS - Kairos Small Modular Re.actor (Texas A&M/Kairos Power, LLC), Construction Permit Application 6.13. Haskell County, Texas Site (Last Energy), Early Site Permit 6.14. Campbell County, Virginia Site (Appalachian Power Company), Early Site Permit 6.15. Project Matador (Fermi America), President Donald J. Trump Advanced Energy and Intelligence Campus, Fermi Units 1 - 4, Combined License Application
- 7. Planned or potential license applications to construct or operate nuclear test or research reactors related to energy generation 7.1.
Hermes 1 (Kairos Power, LLC), Operating License Application 7.2.
Hermes 2 (Kairos Power, LLC), Operating License Application 7.3.
Abilene Christian University Molten Salt Research Reactor (Abilene Christian University), Operating License Application 7.4.
University of Illinois at Urbana-Champaign High-Temperature Gas-Cooled Research (HTGR) Reactor (University of Illinois at Urbana-Champaign), Construction Permit Application
- 8. Planned or potential license applications to restart operation of nuclear power plants 8.1.
Crane Clean Energy Center (Constellation Energy Corporation), License Amendment Requests to restart operation of the power plant 8.2.
Duane Arnold Energy Center (NextEra Energy Duane Arnold, LLC), License Amendment Requests to restart operation of the power plant
- 9. Planned or potential license applications related to extended power uprates 1 at nuclear power plants 9.1.
Columbia Generating Station (Energy Northwest), license amendment request
- 10. Planned or potential applications for license renewal or subsequent license renewal for nuclear power plants 10.1. Duane Arnold Energy Center (NextEra Energy Duane Arnold, LLC), Subsequent License Renewal 10.2. Palisades Nuclear Plant (Holtec Decommissioning International), Subsequent License Renewal 1 Extended power uprates require significant modifications to major balance-of-plant equipment such as the high-pressure turbines, condensate pumps and motors, main generators, and/or transformers and result in increases between 7 percent and 20 percent of the licensed output of nuclear power plants.
3
10.3. Nine Mile Point, Unit 1 (Constellation Energy Generation, LLC), Subsequent License Renewal 10.4. Ginna (Constellation Energy Generation, LLC), Subsequent License Renewal 10.5. Cooper Nuclear Station (Nebraska Public Power District), Subsequent License Renewal 10.6. Watts Bar Nuclear Plant, Unit 1 (Tennessee Valley Authority), License Renewal 10.7. Joseph M. Farley Nuclear Plant, Units 1 and 2 (Southern Nuclear), Subsequent License Renewal 10.8. Prairie Island Nuclear Generating Plant, Units 1 and 2 (Northern States Power Company), Subsequent License Renewal 10.9. Hope Creek Generating Station (PSEG Nuclear, LLC), Subsequent License Renewal 10.1 a.Salem Nuclear Generating Station, Units 1 and 2 (PSEG Nuclear, LLC), Subsequent License Renewal
- 11. Planned or potential license applications for nuclear fuel cycle facilities 11.1. IKE Enrichment Facility (Orano Enrichment USA LLC), New Fuel Enrichment Facility License 11.2. Global Nuclear Fuel-Americas (Global Nuclear Fuel-Americas, LLC), Amendment to increase enrichmentto produce Advanced Reactor Fuel 11.3. Westinghouse Columbia Fuel Fabrication Facility (Westinghouse Electric Company LLC), Amendment to increase enrichment to produce Accident Tolerant Fuel 11.4. Framatome Fuel Fabrication Facility (Framatome Inc.) Amendment to increase enrichment for Advanced Reactor Fuel 11.5. Louisiana Energy Services (LES) LLC (Urenco USA), Amendments (multiple) to increase enrichment limits 11.6. BWX Technologies, Inc, Fuel Fabrication Facility License Renewal 11.7. Kairos Power Atlas Fuel Fabrication Facility (Kairos Power, LLC), New Fuel Fabrication Facility License 4