May 19, 2025 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; AND R.E. GINNA NUCLEAR POWER PLANT - ISSUANCE OF AMENDMENTS TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-475 (EPID L-2024-LLA-0164)
Dear Mr. Rhoades:
The U.S. Nuclear Regulatory Commission (NRC or Commission) has issued the enclosed amendments (listed below) in response to the Constellation Energy Generation, LLC (CEG) application dated December 9, 2024:
- 1.
Amendment No. 240 to Renewed Facility Operating License No. NPF-72 and Amendment No. 240 to Renewed Facility Operating License No. NPF-77 for Braidwood Station, Units 1 and 2, respectively;
- 2.
Amendment No. 239 to Renewed Facility Operating License No. NPF-37 and Amendment No. 239 to Renewed Facility Operating License No. NPF-66 for Byron Station, Unit Nos. 1 and 2, respectively;
- 3.
Amendment No. 353 to Renewed Facility Operating License No. DPR-53 and Amendment No. 329 to Renewed Facility Operating License No. DPR-69 for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, respectively;
- 4.
Amendment No. 158 to Renewed Facility Operating License No. DPR-18 for R.E. Ginna Nuclear Power Plant.
The amendments revise the technical specifications (TSs) for each facility in accordance with Technical Specifications Task Force (TSTF) Traveler 475, Revision 1, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Specifically, TSTF-475 revises the standard TS to clarify requirements for surveillance frequency intervals in Section 1.4, Frequency, which provides descriptions and examples for the proper use and application of frequency requirements.
D. Rhoades A copy of the NRC staffs Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317 50-318, and 50-244
Enclosures:
- 1. Amendment No. 240 to NPF-72
- 2. Amendment No. 240 to NPF-77
- 3. Amendment No. 239 to NPF-37
- 4. Amendment No. 239 to NPF-66
- 5. Amendment No. 353 to DPR-53
- 6. Amendment No. 329 to DPR-69
- 7. Amendment No. 158 to DPR-18
- 8. Safety Evaluation
- 9. Notices and Environmental Findings cc: Listserv
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. STN 50-456 BRAIDWOOD STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 240 Renewed License No. NPF-72
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the renewed license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-72 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 240 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:06:56 -04'00' CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 240 Renewed License No. NPF-77 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the renewed license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-77 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 240 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:07:24 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 240 AND 240 RENEWED FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating Licenses REMOVE INSERT License NPF-72 License NPF-72 Page 3 Page 3 License NPF-77 License NPF-77 Page 3 Page 3 Technical Specifications REMOVE INSERT 1.4 - 5 1.4 - 5 (2)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 240 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-72 Amendment No. 240 (2)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 240 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-77 Amendment No. 240
Frequency 1.4 BRAIDWOOD UNITS 1 & 2 1.4 5 Amendment 240 1.4 Frequency EXAMPLES (continued)
EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE-----------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
Perform channel adjustment.
7 days The interval continues, whether or not the unit operation is
< 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance. The Surveillance is still considered to be performed within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power 25% RTP.
Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2), there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. STN 50-454 BYRON STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 239 Renewed License No. NPF-37 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the renewed license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-37 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 239 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:07:56 -04'00' CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. STN 50-455 BYRON STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 239 Renewed License No. NPF-66 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-66 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 239, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:08:18 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 239 AND 239 RENEWED FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 BYRON STATION, UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-454 AND STN 50-455 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating Licenses REMOVE INSERT License NPF-37 License NPF-37 Page 3 Page 3 License NPF-66 License NPF-66 Page 3 Page 3 Technical Specifications REMOVE INSERT 1.4 - 5 1.4 - 5 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 239 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Deleted.
(4)
Deleted.
Renewed License No. NPF-37 Amendment No. 239 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 239, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Deleted.
Renewed License No. NPF-66 Amendment No. 239
Frequency 1.4 BYRON UNITS 1 & 2 1.4 5 Amendment 239 1.4 Frequency EXAMPLES (continued)
EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE-----------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
Perform channel adjustment.
7 days The interval continues, whether or not the unit operation is
< 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance. The Surveillance is still considered to be performed within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power 25% RTP.
Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2), there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
CALVERT CLIFFS NUCLEAR POWER PLANT, LLC CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 353 License No. DPR-53 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-53 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 353, are hereby incorporated into this license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:08:45 -04'00' CALVERT CLIFFS NUCLEAR POWER PLANT, LLC CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 329 Renewed License No. DPR-69 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-69 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 329, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:09:07 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 353 AND 329 RENEWED FACILITY OPERATING LICENSE NOS. DPR-53 AND DPR-69 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Replace the following pages of the Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License DPR-53 License DPR-53 Page 3 Page 3 License DPR-69 License DPR-69 Page 3 Page 3 TSs TSs 1.4 - 4 1.4 - 4 Amendment No. 353 (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1)
Maximum Power Level Constellation Energy Generation, LLC is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 353, are hereby incorporated into this license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications.
(a)
For Surveillance Requirements (SRs) that are new, in Amendment 227 to Facility Operating License No. DPR-53, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 227. For SRs that existed prior to Amendment 227, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 227.
(3)
Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 345 are hereby incorporated into this license.
Constellation Energy Generation, LLC shall operate the facility in accordance with the Additional Conditions.
Amendment No. 329 (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1)
Maximum Power Level Constellation Energy Generation, LLC is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 329, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
(a)
For Surveillance Requirements (SRs) that are new, in Amendment 201 to Facility Operating License No. DPR-69, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 201. For SRs that existed prior to Amendment 201, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 201.
(3)
Less Than Four Pump Operation The licensee shall not operate the reactor at power levels in excess of five (5) percent of rated thermal power with less than four (4) reactor coolant pumps in operation. This condition shall remain in effect until the licensee has submitted safety analyses for less than four pump operation, and approval for such operation has been granted by the Commission by amendment of this license.
Frequency 1.4 1.4 Frequency CALVERT CLIFFS - UNIT 1 1.4-4 CALVERT CLIFFS - UNIT 2 Amendment No. 353 Amendment No. 329 EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE ----------------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
Perform channel adjustment.
7 days The interval continues, whether or not the unit operation is < 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance.
The Surveillance is still considered to be performed within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power 25% RTP.
Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2),
there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
R. E. GINNA NUCLEAR POWER PLANT, LLC CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-244 R. E. GINNA NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 158 Renewed License No. DPR-18 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated December 9, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-18 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 158, are hereby incorporated in the renewed license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ilka Berrios, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: May 19, 2025 ILKA BERRIOS Digitally signed by ILKA BERRIOS Date: 2025.05.19 16:09:31 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 158 RENEWED FACILITY OPERATING LICENSE NO. DPR-18 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License DPR-18 License DPR-18 Page 4 Page 4 TSs TSs 1.4 - 3 1.4 - 3 R. E. Ginna Nuclear Power Plant Amendment No. 158 (2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 158, are hereby incorporated in the renewed license.
Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications.
(3)
Fire Protection Constellation Energy Generation, LLC shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensees amendment request dated March 28, 2013, supplemented by letters dated December 17, 2013; January 29, 2014; February 28, 2014; September 5, 2014; September 24, 2014; December 4, 2014; March 18, 2015; June 11, 2015; August 7, 2015; and as approved in the safety evaluation report dated November 23, 2015. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
(a)
Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as-operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
1.
Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.
Frequency 1.4 The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").
This type of Frequency does not qualify for the 1.25 times the stated Frequency extension allowed by SR 3.0.2. "Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If reactor power decreases to < 25% RTP, the measurement of both intervals stops. New intervals start upon reactor power reaching 25%
RTP.
EXAMPLE 1.4-3 FREQUENCY BASED ON SPECIFIED CONDITION SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
- NOTE -
Required to be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
Perform channel adjustment.
7 days The interval continues, whether or not the plant operation is < 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance. The Surveillance is still considered to be performed within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was
< 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power 25% RTP.
Once the plant reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2),
there would then be a failure to perform a Surveillance within the specified Frequency and the provisions of SR 3.0.3 would apply.
R.E. Ginna Nuclear Power Plant 1.4-3 Amendment 158 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 240 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-72 AMENDMENT NO. 240 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-77 AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-37 AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-66 AMENDMENT NO. 353 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AMENDMENT NO. 329 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 AMENDMENT NO. 158 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-18 CONSTELLATION ENERGY GENERATION, LLC BRAIDWOOD STATION, UNITS 1 AND 2 BYRON STATION, UNIT NOS. 1 AND 2 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 R.E. GINNA NUCLEAR POWER PLANT DOCKET NOS. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, AND 50-244 Application (i.e., initial and supplements)
Safety Evaluation Date
December 9, 2024, ML24344A270 May 19, 2025 Principal Contributor to Safety Evaluation
1.0 PROPOSED CHANGE
S Constellation Energy Generation, LLC (CEG, the licensee) requested changes to the technical specifications (TSs) for Braidwood Station, Units 1 and 2 (Braidwood), Byron Station, Unit Nos. 1 and 2 (Byron), Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs), and R.E. Ginna Nuclear Power Plant (Ginna) by license amendment request (LAR, application). In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendment under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the TS based on Technical Specifications Task Force (TSTF) Traveler 475, Revision 1, "Control Rod Notch Testing Frequency and SRM Insert Control Rod Action," (TSTF-475) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071420428). Specifically, TSTF-475 revises the standard TS (STS) to clarify requirements for surveillance frequency intervals in Section 1.4, Frequency, which provides descriptions and examples for the proper use and application of frequency requirements.
1.1 Proposed Technical Specification Changes The proposed changes would revise Example 1.4-3 in TS 1.4 to clarify that the 25 percent (%)
allowance of surveillance requirement (SR) 3.0.2 is applicable to time periods discussed in TS Notes in the surveillance column and time periods in the frequency column. Existing SR 3.0.2 states, in part, [t]he specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
The proposed changes would revise Braidwood, Byron, and Calvert Cliffs TS Example 1.4-3 as follows (emphasis added):
EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RTP.
Perform channel adjustment.
7 days The interval continues, whether or not the unit operation is < 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the specified Frequency. Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 25% RTP to perform the Surveillance. The Surveillance is still considered to be performed within the specified Frequency. Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power 25% RTP.
Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2), there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
Although Ginnas TS Example 1.4-3 has some plant-specific differences in wording, the sentences directly affected by the proposed changes are identical to the above-quoted TS.
1.2 Proposed Changes to Technical Specification Bases Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(a)(1), the licensee submitted corresponding changes to the TS Bases, for information only, that provide the reasons for the proposed TSs changes. The regulation at 10 CFR 50.36(a)(1) states that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application, but shall not become part of the TS. The licensee shall make changes to the plant TS Bases in accordance with the TS Bases Control Program, found at TS 5.5.14 for Byron, Braidwood and Calvert Cliffs, and at TS 5.5.13 for Ginna.
2.0 REGULATORY EVALUATION
2.1 Regulatory Requirements Per Title 10 CFR 50.90, whenever a holder of a license wishes to amend the license, including technical specifications in the license, an application for amendment must be filed, fully describing the changes desired. Under 10 CFR Part 50.92(a), determinations on whether to grant an applied-for license amendment are to be guided by the considerations that govern the issuance of initial licenses or construction permits to the extent applicable and appropriate. Both the common standards for licenses and construction permits in 10 CFR Part 50.40(a), and those specifically for issuance of operating licenses in 10 CFR Part 50.57(a)(3), provide that there must be reasonable assurance that the activities at issue will not endanger the health and safety of the public.
The regulations at 10 CFR 50.36 Technical specifications, establish the requirements related to the content of the TS. Pursuant to 10 CFR 50.36(c), TS are required to include items in the following five categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) SRs; (4) design features; and (5) administrative controls. The LAR relates to changes in the SRs.
The regulation at 10 CFR 50.36(c)(3) states that TS shall contain SRs relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met.
2.2 Guidance Though the proposed changes to the STS via TSTF-475 were developed based on changes to Revision 3.1 of NUREG-1431 (applicable to Braidwood, Byron and Ginnas designs) and Revision 3.1 of NUREG-1432 (applicable to Calvert Cliffs design), the NRC staff review of the LAR includes consideration of whether the proposed changes are consistent with the latest revisions. NUREG-1431, Revision 5, Standard Technical Specifications, Westinghouse Plants (ML21259A155), and NUREG-1432, Revision 5, Standard Technical Specifications, Combustion Engineering Plants (ML21258A421), provide example TS to meet the requirements in 10 CFR 50.36(c) for a standard plant design.
3.0 TECHNICAL EVALUATION
TSTF-475 was developed, in part, to address an unclear requirement within STS Section 1.4 regarding the applicability of the 25% surveillance interval allowance of SR 3.0.2. Prior to TSTF-475, STS Example 1.4-3 did not describe the SR 3.0.2 allowance with respect to the note in its surveillance column. This was inconsistent with the definition of specified Frequency in STS Section 1.4.
Similarly, the existing Byron, Braidwood, Calvert Cliffs, and Ginna TS each contain the following paragraph in the Description of Section 1.4:
The specified Frequency is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR) Applicability. The specified Frequency consists of the requirements of the Frequency column of each SR as well as certain Notes in the Surveillance column that modify performance requirements.
In the LAR, the proposed changes to TS Example 1.4-3 would add, in two places, the phrase (plus the extension allowed by SR 3.0.2). The NRC staff finds the proposed TS changes would clarify the example to make it consistent with the definition of specified frequency provided in the description of Section 1.4.
The NRC staff determined that the proposed TS changes would clarify the existing relationship between the SRs and the SR 3.0.2 allowance. Therefore, the NRC staff concludes the proposed changes are acceptable because the SRs will continue to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met in accordance with 10 CFR 50.36(c)(3).
4.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: Khadijah West, NRR Mark Schwieg, NRR Date: May 19, 2025 NOTICES AND ENVIRONMENTAL FINDINGS RELATED TO AMENDMENT NO. 240 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-72 AMENDMENT NO. 240 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-77 AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-37 AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-66 AMENDMENT NO. 353 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AMENDMENT NO. 329 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 AMENDMENT NO. 158 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-18 CONSTELLATION ENERGY GENERATION, LLC BRAIDWOOD STATION, UNITS 1 AND 2 BYRON STATION, UNIT NOS. 1 AND 2 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 R.E. GINNA NUCLEAR POWER PLANT DOCKET NOS. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, AND 50-244 Application (i.e., initial and supplements)
Safety Evaluation Date
December 9, 2024, ML24344A270 May 19, 2025
1.0 INTRODUCTION
Constellation Energy Generation, LLC (CEG, the licensee) requested changes to the technical specifications (TSs) for Braidwood Station, Units 1 and 2 (Braidwood), Byron Station, Unit Nos. 1 and 2 (Byron), Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs), and R.E. Ginna Nuclear Power Plant (Ginna) by license amendment request (LAR, application). In its application, the licensee requested the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendment under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the TS based on Technical Specifications Task Force (TSTF) Traveler 475, Revision 1, "Control Rod Notch Testing Frequency and SRM Insert Control Rod Action," (TSTF-475) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071420428). Specifically, TSTF-475 revises the standard TS (STS) to clarify requirements for surveillance frequency intervals in Section 1.4, Frequency, which provides descriptions and examples for the proper use and application of frequency requirements.
2.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Illinois, Maryland, and New York State officials were notified of the proposed issuance of the amendments on April 15, 2025. The relevant officials had no comments.
3.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in Title 10 of the Code of Federal Regulations (10 CFR), part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, which was published in the Federal Register on March 18, 2025 (90 FR 12568), and there has been no public comment on such finding. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
D. Rhoades
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; AND R.E. GINNA NUCLEAR POWER PLANT - ISSUANCE OF AMENDMENTS TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-475 (EPID L-2024-LLA-0164) DATED MAY 19, 2025 DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1 Resource RidsNrrDorlLpl3 Resource RidsRgn1MailCenter Resource RidsRgn3MailCenter Resource RidsNrrLASLent Resource RidsNrrLAKEntz Resource RidsAcrs_MailCTR Resource RidsNrrPMConstellation Resource RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMCavertCliffs Resource RidsNrrPMREGinna Resource RidsNrrDssStsb Resource RidsNrrDraApla Resource ARussell, NRR ABrown, NRR Accession No.: ML25132A150
- SE provided via memorandum OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/STSB/BC*
NAME SWall SLent SMehta DATE 05/12/2025 5/13/2025 05/02/2025 OFFICE NRR/DORL/LPL3/BC(A) NRR/DORL/LPL3/PM NAME IBerrios SWall DATE 05/16/2025 05/19/2025 OFFICIAL RECORD COPY