April 28, 2025
Joseph Sullivan, Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
COMMERCIAL GRADE DEDICATION INSPECTION (05000382/2025010) AND
REQUEST FOR INFORMATION
Dear Joseph Sullivan:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the commercial grade dedication baseline inspection at Waterford Steam Electric
Station, Unit 3, beginning on September 8, 2025. The inspection team will be composed of three
personnel from the NRC Region IV office. The inspection will be conducted in accordance with
NRC Inspection Procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated
February 16, 2023.
The inspection will evaluate the implementation of Waterford Steam Electric Stations process
for dedicating commercial grade items, as required in applicable portions of Appendix B to
Title 10 of the Code of Federal Regulations Part 50, to ensure reasonable assurance is provided
that these items will perform their intended safety function. Additionally, this inspection will
evaluate implementation of Waterford Steam Electric Stations procurement process for safety-
related structures, systems, and components, as required in Appendix B.
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
Onsite Information Gathering Visit: August 4-7, 2025
Offsite Preparation Week: September 1-5, 2025
Onsite Inspection Weeks: September 8-12, 2025, and September 22-26, 2024
The purpose of the information gathering visit is to meet with your staff to become familiar with
the process of dedicating commercial grade items and the process for procuring safety-related
structures, systems, and components at Waterford Steam Electric Station. A high-level
presentation of site-specific commercial grade dedication and safety-related procurement
activities would be beneficial. This visit may include a tour of onsite commercial grade item
dedication facilities, receipt inspection facilities, storage facilities, and installed plant
components associated with potential inspection samples. During the visit, the team lead will
J. Sullivan
2
also review the information provided in the initial information request to select a list of potential
inspection samples. The team lead may also identify other information needed to support the
inspection during this visit.
To minimize the impact on your staff and to ensure an effective and efficient inspection, we
have enclosed two separate requests for information needed prior to the onsite information
gathering visit and offsite inspection preparation week. The first request (Enclosure 1) is
generally for information that will be used to choose the inspection samples or information that
will be applicable to all inspection samples throughout the inspection. This information should be
made available to the team lead prior to the information gathering visit. The second request
(Enclosure 2) is for information that is specific to an individual sample and should be made
available prior to the offsite preparation week.
Additional information requests, interviews with your staff, and/or walkdowns of facilities or
installed plant components will be made by the team throughout the inspection to complete their
review of the selected inspection samples. It is important that all documentation provided to the
team is complete and upto-date to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an
efficient inspection, we request that a contact individual be assigned to each inspector to ensure
information requests, questions, and concerns are addressed in a timely manner.
We understand that Ramon Peter from your Regulatory Assurance organization is our contact
for this inspection. If there are any questions about the inspection or the information requested,
please contact the team lead, Rayomand Kumana, by telephone at 817-200-1426 or by email at
Rayomand.Kumana@nrc.gov. Enclosure 3 contains additional contact information for the
inspection team.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, under Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
J. Sullivan
3
In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC public document
room or from the publicly available records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC website.
Sincerely,
Cale Young, Acting Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket No. 05000382
License No. NPF-38
Enclosures:
1.
Documents Requested Prior to
Information Gathering Visit
2.
Documents Requested Prior to
Inspection Preparation Week
3.
Inspection Team Contact Information
cc w/encl: Distribution via LISTSERV
Signed by Young, Cale
on 04/28/25
X
SUNSI Review
by RJK
X
Non-Sensitive
Sensitive
X
Publicly Available
Non-Publicly Available
OFFICE
BC:DORS/EB1
SRI:DORS/EB1
C:DORS/EB1
NAME
WCullum
RKumana
CYoung
SIGNATURE
/RA/
/RA/
/RA/
DATE
04/28/25
04/28/25
04/28/25
Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the team's use both onsite and offsite during the information gathering visit.
Electronic format is the preferred media. If electronic media is made available via an internet
based remote document management system, then the remote document access must allow
inspectors to download, save, and print the documents in the NRC's regional office. Electronic
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by July 28, 2025:
1.
Copy of procedures for dedicating commercial grade items/services, procuring safety-related
structures, systems, and components (SSCs), performing receipt inspections, controlling
counterfeit, fraudulent, and suspect items, and 10 CFR Part 21 evaluations and reporting.
2.
Sortable list of commercial grade items/services that completed the dedication process
within the past six years. These items/services may have been dedicated by Waterford
Steam Electric Station or by a vendor (or other licensee) and procured by Waterford Steam
Electric Station. Include, as applicable, relevant information such as the item/services
material/catalog identification number and description, parent/host equipment identification
number and description, purchase order number, installation work order/job number, and
date of issue/installation.
3.
Sortable list of SSCs that were procured as safety-related within the past six years. Include,
as applicable, relevant information such as the SSCs material/catalog identification number
and description, parent/host equipment identification number and description, purchase
order number, installation work order/job number, date of issue/installation, and end-use
safety classification.
4.
Sortable list of dedicated commercial grade items/services or procured safety-related SSCs
that were placed on hold within the past six years because of concerns identified during
receipt, dedication, or from operating experience or the corrective action program as
applicable.
5.
Sortable list of dedicated commercial grade items/services or procured safety-related SSCs,
with a brief description, where dedication/procurement activities were expedited within the
past six years.
6.
Sortable list of dedicated commercial grade-items/services or procured safety-related SSCs
that failed after completing dedication/procurement activities or required corrective
maintenance within the past six years.
7.
Sortable list of corrective action program documents, with a brief description, related to
commercial grade item/service dedication, safety-related SSC procurement, receipt
inspection, and storage activities within the past six years.
E1-2
8.
Copy of any self-assessments or audits of commercial grade item/service dedication and/or
safety-related SSC procurement activities performed within the past six years.
9.
Copy of the updated final safety analysis report, technical specifications, and technical
requirements manual, including applicable bases documents.
10. Sortable list of systems, including identifying designators and corresponding names.
11. List of individuals who will be supporting the inspection and their contact information.
Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below
should generally be made available to the inspection team for the team's use both onsite and
offsite during the inspection. Electronic format is the preferred media. If electronic media is
made available via an internet based remote document management system, then the remote
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
Documents requested by August 25, 2025:
1.
Complete commercial grade item dedication package including relevant documentation such
as the following, as applicable: description of item/service, identification of safety functions
and safety classifications of item/parent component, like-for-like or equivalency evaluations,
credible failure modes/failure modes and effects analysis, critical characteristics and
acceptance criteria, identification of the suppliers commercial quality assurance program or
other documented controls.
2.
Complete purchase order including relevant documentation such as the following, as
applicable: purchase requisition, catalog specifications, item product data sheets/vendor
manuals, shelf-life information, service/qualified life information, certificates of
conformance/compliance/quality, vendor test and inspection reports, third-party or sub
vendor test and inspection results, vendor dedication or partial dedication information,
material receiving reports, packing list/invoices or other shipping documents, and other
pertinent vendor/licensee correspondence.
3.
Receipt inspection reports and any related test reports, documents noting any deviations
from design, material, and performance characteristics relevant to the safety function
(nonconformance dispositions).
4.
Documents showing objective evidence of special test and inspection procedures used to
verify technical and quality requirements have been met, commercial grade survey reports,
or source verification reports; any other documents to trace the item from the time it was
dedicated to the time it was installed, tested, and accepted.
5.
Completed installation work orders and stock or material issue forms; completed post-
installation test procedures and results.
6.
Design basis information of the inspection sample or parent/host component such as:
normal/accident service environment, normal/accident performance requirements, design
basis document/system description, relevant UFSAR/technical specification sections,
calculation/drawing/procedure updates, etc.
E2-2
7.
10 CFR 50.59 documentation, if required.
8.
Sortable list of corrective action program documents, with a brief description, associated
with the inspection sample or parent/host equipment.
Enclosure 3
Inspection Team Contact Information
Rayomand Kumana (Lead)
Senior Reactor Inspector
817-200-1426
Rayomand.Kumana@nrc.gov
Dustin Bryen
Reactor Inspector
817-200-1078
Dustin.Bryen@nrc.gov
Beatrice Nwafor
Reactor Inspector
817-200-1462
Beatrice.Nwafor@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Rayomand Kumana
1600 East Lamar Blvd.
Arlington, TX 76011-4511