Information Request Brunswick Nuclear Station Age Related Degradation Inspection 05000325/2025010 and 05000324/2025010 Information Request
ML25093A018
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/03/2025
From: Geoffrey Ottenberg, Teh-Chiun Su
NRC/RGN-II/DORS
To:
References
IR 2025010
Download: ML25093A018 (1)


See also: IR 05000324/2025010

Text

`

Brunswick Units 1 & 2 Focused Engineering Inspection

Initial Information Request

Inspection Procedure:

71111.21N.04, Age-Related Degradation, dated December 15,

2023 (ADAMS ML23318A426)

Inspection Dates:

Information Gathering Week: May 19, 2025

Preparation Week: September 1, 2025

Onsite Week 1: September 8, 2025

Onsite Week 2: September 22, 2025

Inspection Report: 05000325/2025010, AND 05000324/2025010

(Standalone Inspection Report)

Inspectors:

T. Su (Lead/Mechanical), G. Ottenberg (Mechanical), and P. Braxton

(Electrical)

The purpose of this letter is to notify you that three inspectors from Region II will conduct an

inspection at your site in accordance with Inspection Procedure 71111.21N.04, Age-Related

Degradation. Attachment 21N.04 is not considered a team inspection. The inspection will

evaluate the implementation of the programs regarding age related degradation, and that

structures, systems, and components (SSCs) are identified and addressed in a manner that

provides reasonable assurance of the safe operation of the Brunswick Nuclear Station, Units 1,

2, and 3. The inspectors will select samples of SSCs that are risk significant and within the

scope of the program.

On September 8, 2025, Mr. Teh-Chiun Su, a Senior Reactor Inspector from the NRCs Region

II office, will begin the inspection with an information gathering visit to the site. The purpose of

the information gathering visit is to become familiar with the station maintenance, surveillance,

testing, inspection, and condition monitoring programs, become familiar with plant layout,

support identification of SSCs that will be reviewed during the inspection, and, as necessary,

obtain plant specific site access training and badging for unescorted site access. An initial list

of documents that the team will review during the information gathering visit are listed in

Enclosure 1.

Enclosure 1 lists documents that are needed prior to the information gathering visit. Please

provide the referenced information to the Region II office or otherwise make the

documentation electronically available by one week prior to the beginning of the information

gathering visit. Additional documents may be requested during the information gathering visit.

The additional information should be provided to the Inspectors in the Region II office by May

12, 2025. During the information gathering visit, Mr. Su will also discuss the following

inspection support administrative details: (1) availability of knowledgeable plant engineering

and licensing personnel to serve as points of contact during the inspection, (2) method of

tracking inspector requests during the inspection, (3) licensee computer access, (4) working

space, (5) arrangements for site access, and (6) other applicable information.

For SSCs that have been selected for review, an initial list of the documents the inspectors

will review during the conduct of the inspection are listed in Enclosure 2. The team leader will

contact you with identified SSCs. Also, personnel should be available at the site during the

inspection who are knowledgeable regarding maintenance, surveillance, testing, inspection,

and condition monitoring programs.

Enclosure 1

`

Enclosure 1

INFORMATION REQUEST FOR BRUNSWICK NUCLEAR STATION

Focused Engineering Inspection- Age Related Degradation

Prior to the information gathering visit, please provide the information electronically in .pdf

files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The

CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.

Contact Information:

Teh-Chiun (TC) Su

(404) 997-4527

teh-chiun.su@nrc.gov

Information Gathering Visit: An information gathering visit is currently scheduled the week

of May 19, 2025. During this visit, we would like to identify the component samples for this

inspection. Wed like to meet with Aging Management, Maintenance Rule, and Equipment

Reliability Program specialists to discuss the upcoming inspection and our sample selection

process. Purposes of the site visit are to: (a) discuss the scope of the planned inspection;

(b) obtain advance information to review in preparation for the inspection; (c) ensure that the

information to be reviewed is available at the beginning of the inspection; and (d) verify that

logistical issues (such as obtaining both site and computer system access and arranging the

location of the inspection team working area) will be resolved prior to inspector arrival. We

request the room to have a telephone, wireless internet access, and availability of station

procedures, corrective action program documents, and a printer.

Logistics:

Information gathering visit week: May 19, 2025

Onsite inspection weeks: September 8, and September 22, 2025

The licensee was offered the option of having an entrance meeting and the licensee

decline to have an entrance meeting. The date and time of the exit meeting will be

discussed at a later date. In addition, Id like to have a daily debrief with your inspection

support staff at a convenient time in the afternoons for both the onsite and in between

inspection weeks (Time TBD, approximately 30 minutes).

We will need a conference room as workspace for the inspectors. We will also need an area

available for conducting interviews. Please provide access to your document system and Wi-

Fi access.

During the information gathering visit, please provide info on (1) conference room location &

phone number, (2) cafeteria location/hours, and (3) engineering staff normal working hours.

Also, please let me know if there are any potential resource conflicts during our onsite weeks

(Fridays off, EOP drills, management retreats) and well do our best to accommodate.

Enclosure 1

`

Enclosure 1

Team Members:

Teh-Chiun Su (Inspection Lead, Electrical)

Geoffrey Ottenberg (Mechanical)

Pauline Braxton (Electrical)

Please verify the status of access authorization and remaining requirements for unescorted

access for each inspector. Please provide me with a list of exceptions, and I will take action to

address them.

Info Request:

1. A word-searchable current version of the station Updated Final Safety Analysis Report

(UFSAR).

2. A word-searchable current version of the station Technical Specifications (TS).

3. A word-searchable current version of the station Quality Assurance Program Document

4. The Selected Licensee Commitments (SLC) document

5. List of corrective action documents related to Aging degradation and the Aging programs

since January 1, 2020. Please list CRs associated with component failures, or tagged with

aging, age-related, wear, accelerated wear, abnormal wear, accelerated

degradation, abnormal degradation, etc.

6. List of 50.65 (a)(1) SSCs from the past 5 years

7. Maintenance Rule functional failures from the past 5 years (include NCRs which identified

the failure)

8. Plant Reliability Indicators

9. Part 21 Reports applicable to the site from the past 5 years

10. List of RISC-1, RISC-2, and RISC-3 SSCs (If 10 CFR 50.69 has been implemented)

11. Safety significant functions identified during the RISC categorization process, and

alternative treatment requirements (If 10 CFR 50.69 has been implemented)

12. List of risk-significant long-lived passive SSCs (for licensees in the period of extended

operation (PEO))

13. List of aging management program (AMP) documents (for licensees in the period of

extended operation (PEO))

14. Any self-assessments or QA assessments of the aging management and maintenance rule

programs (performed since January 1, 2021)

15. Any self-assessment performed in preparation for this Age-Related Degradation inspection

16. List of systems (system numbers/designators and corresponding names)

PAPERWORK REDUCTION ACT STATEMENT

This letter contains voluntary information collections that are subject to the Paperwork Reduction Act of 1995 (44

U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval

number 3150-0011). The burden to the public for these information collections is estimated to average 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per

response. Send comments regarding this information collection to the Information Services Branch, Office of the

Chief Information Officer, Mail Stop: O-1F13, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or

by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.

Public Protection Notification

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid OMB control number.

Enclosure 2

`

Enclosure 2

For sample SSCs identified during the information gathering week:

The following is a partial list of required information.

1. Self-imposed and vendor recommendations

2. Site specific probabilistic risk assessment (PRA) identifying risk-significant functions for the SSC.

3. Past maintenance, surveillance, testing, inspection, and condition monitoring testing results. For

periodicities greater than two years, the last two test results.

4. TS operability determinations

5. Actions taken for issues identified during performance of maintenance, surveillance, testing,

inspection, and condition monitoring

6. Last evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3)

7. Last feedback and process adjustment required per 10 CFR 50.69(e)(1) (for licensees that

implement 10 CFR 50.69)

8. Any on-going reviews of both plant-specific and industry operating experience performed in the

last two years that informed or enhanced AMPs (for licensees in the period of extended

operation (PEO)).

9. Maintenance, surveillance, testing, inspection, and condition monitoring testing requirements,

acceptance criteria, and periodicities.

10. Bases documents associated with maintenance, surveillance, testing, inspection, and condition

monitoring testing requirements, acceptance criteria, and periodicities.

11. Maintenance rule scoping and performance criteria.