Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Dresden Nuclear Plant for Performance for 2024 Calendar Year
ML25079A303
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/21/2025
From: Robert Ruiz
NRC/RGN-III/DORS/RPB1
To:
Shared Package
ML24353A190 List:
References
Download: ML25079A303 (1)


Text

NOTICE OF PUBLIC MEETING Licensee:

Constellation Energy Generation, LLC Facility:

Dresden Nuclear Power Station, Units 2 And 3 Docket Nos.:

50-237; 50-249 Date and Time:

Wednesday, April 9, 2024 5:00 p.m. - 6:00 p.m. (CDT)

Location:

Morris American Legion Post 294 212 Washington St.

Morris, IL 60450

Purpose:

The NRC staff will host an open forum to share the NRCs assessment of safety performance at Dresden Nuclear Power Station, Units 2 and 3, for 2024, as described in the 2024 annual assessment letter. During the open house, the NRC will respond to questions specific to the safety performance of the station and the NRCs role in ensuring safe plant operations.

NRC Attendees:

Robert Ruiz, Chief, Branch 1, Division of Operating Reactor Safety Jakob Steffes, Senior Resident Inspector, Dresden Jennifer Meszaros, Resident Inspector, Dresden Grace Moore-Powe Site Administrative Assistant, Dresden Others as designated Public Participation:

This is an Information Meeting with a Question and Answer Session: The purpose of this meeting is for the NRC staff to meet directly with individuals to discuss regulatory and technical issues.

Attendees will have an opportunity to ask questions of the NRC staff or make comments about the issues discussed throughout the meeting; however, the NRC is not actively soliciting comments toward regulatory decisions at this meeting.

March 21, 2025

Notice of Public Meeting 2

If you have any questions or should need assistance concerning the meeting, please call or email the meeting contact.

Meeting

Contact:

Robert Ruiz, Chief DORS, Branch 1 (630) 829-9732 email: Robert.Ruiz@nrc.gov The NRCs annual assessment letter regarding Dresden Nuclear Power Station, Units 2 And 3s performance during 2024 can be found using ADAMS Accession No. ML25069A720. Additional information related to the NRCs annual assessment process and the safety performance of each site can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov, and contains information regarding visitors and security.

If you need a reasonable accommodation to participate in this meeting (e.g., a translator, accessibility) or need this meeting notice, the transcript, or other information from the meeting in another format (e.g., Braille, large print, a language other than English), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances such as severe weather, confirm the meeting schedule by checking the Public Meeting Schedule or communicating with the meeting contact.

Approved by: __

Robert Ruiz, Chief Reactor Projects Branch1 Division of Operating Reactor Safety Signed by Ruiz, Robert on 03/21/25

Notice of Public Meeting 3

DISTRIBUTION:

Alejandro Alen Arias RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan Harral Logaras Bryan Bergeon David Curtis Jared Heck R3-DORS Shelbie Lewman Viktoria Mitlyng Prema Chandrathil ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML25079A303 OFFICE RIII RIII NAME NShah:gmp RRuiz DATE 03/21/2025 03/21/2025 OFFICIAL RECORD COPY