ML25063A189
| ML25063A189 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/03/2025 |
| From: | Shaun Anderson, Hershfield M, Martin C, Williams B US Federal Energy Regulatory Commission |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML25063A291 | List: |
| References | |
| ASLBP 22-973-01-SLR-BD01, 50-269-SLR, 50-270-SLR, 50-287-SLR, RAS 56281 | |
| Download: ML25063A189 (2) | |
Text
CEIi Designation Form Nuclear Regulatory Commission (ML21295A755)
Duke Energy - Oconee Nuclear Station {1 document)
Prior to sharing Critical Electric/Energy Infrastructure Information (CEIi) with a third party, the CEIi Coordinator must determine whether to designate the information as CEIi. Documents that have already been designated CEIi are marked "Designated Critical Energy/Electric Infrastructure Information (CEIi)... " The following, along with a review by OGC staff, will help the CEIi coordinator determine whether the documents prospectively being shared should be designated as CEIi. Please provide the documents and this form to CEll@ferc.gov 1.
Does the information relate to details about the production, generation, transportation, transmission, or distribution of energy?
_x __
Yes.
No.
2.
Could the information be useful to a person in planning an attack on critical infrastructure?
_x __
Yes.
3.
Is the information publicly available?
___ Yes.
_x __
No.
No.
4.
Does the information simply give the general location of the critical infrastructure?
___ Yes.
_x __
No.
If so, please identify the document{s) that contain CEIi, including the accession number, and clearly mark the CEIi portions of such documents. (Please use a separate sheet, if needed).
Document labeled "ML21295A755 NRC Proposed Redactions" 5.
How long should the material likely remain CEIi? {Please note CEIi material can only be designated as CEIi for a period of five years. Even after the designation lapses, information should still be treated as CEIi until a determination has been made that the information no longer qualifies as CEIi.) Forever 6.
Would you recommend that the material be renewed as CEIi after the designation period expired?
_x_
Yes.
No.
7.
Are there any portions of the responsive documents that are not CEIi and can be reasonably segregated from the material that qualifies as CEIi?
No, the entire document is CEIi or the CEIi cannot be segregated from the public information.
_x_ Yes, and the prospective CEIi portions are marked on the document.
8.
Do any of the documents include material that may be privileged as well as CEIi? If so, note the potential reason such as the document contains internal agency deliberations, classified material, 1 privacy information, or confidential business information. (Please use a separate sheet, if needed).
No Reviewed by, CHRYSTAL MARTIN Digitally signed by CHRYSTAL MARTIN Date: 2025.02.27 08:13:07 -05'00' Program Office Representative
- Through, Digitally signed by MARK MARK HERSHFIELD HERSHFIELD Date: 2025.02.27 08:16:48 -05'00' GAL Assigned Attorney
- Through, SAMANTHA Digitally signed by SAMANTHA ANDERSON ANDERSON OEA Representative Date: 2025.03.03 11 :54:32 -05'00' Date Date Date Upon review and taking into consideration staff's review, I have determined to designate the material identified above as CEIi. The aspects of the material designated as CEIi are marked on the enclosed.
BENJAMIN WILLIAMS Digitally signed by BENJAMIN WILLIAMS Date: 2025.03.03 15:45:32
-05'00' CEIi Coordinator Determination 1 Under the Fast Act, CEIi is critical electric infrastructure information "other than classified national security information." For questions regarding information that could potentially pose a threat to national security (e.g. Confidential, Secret, or Top Secret), staff should contact Security and Safety Division SAS securityandsafety@ferc.gov, who will consult DOE's Classification Department for proper designation.