NL-25-0306, Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4, License Amendment Request: Remove Technical Specifications Table of Contents (NL-25-0306)

From kanterella
(Redirected from ML25058A192)
Jump to navigation Jump to search

Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4, License Amendment Request: Remove Technical Specifications Table of Contents (NL-25-0306)
ML25058A192
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/27/2025
From: Coleman J
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-25-0306
Download: ML25058A192 (1)


Text

A Southern Nuclear February 27, 2025 Docket Nos.: 52-025 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Regulatory Affairs Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 3535 Colonnade Parkway Birmingham, AL 35243 Tel. 205.992.5000 NL-24-0306 10 CFR 50.90 License Amendment Request: Remove Technical Specifications Table of Contents Ladies and Gentlemen:

In accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requests an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP)

Unit 3 (License No. NPF-91) and 4 (License No. NPF-92). The license amendment request (LAR) proposes a change to the COLs Appendix A, Technical Specifications (TS) to remove the table of contents.

Enclosure provides the description, technical evaluation, regulatory evaluation (including the Significant Hazards Consideration Determination) and environmental considerations for the proposed change.

SNC requests approval of the proposed license amendment request no later than twelve months after acceptance. SNC expects to implement the proposed amendment within 30 days of issuance.

This letter contains no regulatory commitments. This letter has been reviewed and determined not to contain security-related information.

In accordance with 10 CFR 50.91, a copy of this application, with enclosures, is being provided to the designated State of Georgia official.

U. S. Nuclear Regulatory Commission NL-24-0306 Page 2 If you have any questions, please contact Mr. Ryan Joyce at (205) 992-6468.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 27th day of February 2025.

Respectfully submitted, Jamie M. Coleman Regulatory Affairs Director

Enclosure:

Evaluation of Proposed Change cc:

NRC Regional Administrator, Region II NRR Project Manager - Vogtle 3&4 Senior Resident Inspector - Vogtle 3&4 Director, Environmental Protection Division - State of Georgia Document Services RTYPE: VND.LI.L00

ENCLOSURE to NL-24-0306 Evaluation of Proposed Change License Amendment Request:

Remove Technical Specifications Table of Contents

1.

SUMMARY

DESCRIPTION

2.

DETAILED DESCRIPTION 2.1. System Design and Operation 2.2. Current Requirements 2.3. Description of, and Reason for, the Proposed Change

3.

TECHNICAL EVALUATION

4.

REGULATORY EVALUATION 4.1. Applicable Regulatory Requirements/Criteria 4.2. Precedent 4.3. Significant Hazards Consideration 4.4. Conclusions

5.

ENVIRONMENTAL CONSIDERATION

Attachment:

Proposed Technical Specification Change (Mark-ups)

Enclosure to NL-24-0306 Evaluation of Proposed Change 1.0

SUMMARY

DESCRIPTION In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Southern Nuclear Operating Company (SNC) is requesting an amendment to the Technical Specifications (TS) for the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4. This request is to revise the COLs Appendix A TS to remove the table of contents (TOC).

2.0 DETAILED DESCRIPTION 2.1 System Design and Operation Each unit's COL includes an Appendix A, which identify TS requirements applicable to the plant as required by 10 CFR 50.36. The VEGP TS are generally written following the guidance of TSTF-GG-05-01, "Writer's Guide for Plant-Specific Improved Technical Specifications"' Revision 1, for format and content.

2.2 Current Requirements 10 CFR 50.36 contains requirements for what is to be included in a licensee's TS. Section 1 of the approved TS provide accepted rules for use and application of those TS.

2.3 Description of, and Reason for, the Proposed Change The TOC for the TS continue to be maintained but following approval of this license amendment request, responsibility for maintenance and issuance of updates to the TS TOC transfers from the NRC to SNC. The TOC would longer be included in the NRC-issued TS and as such would longer be part of the TS (Appendix A to the COL). The TOC for the TS would continue to be maintained under SNC control and issued by SNC in conjunction with the implementation of future NRC-approved TS amendments.

Placing the TOC under licensee control eliminates the regulatory burden of submitting TOC pages for NRC review and allows timely administrative corrections and improvements to the TOC without NRC review and approval.

3.0 TECHNICAL EVALUATION

The TOC and list of effective pages do not meet the criteria specified in 10 CFR 50.36 requiring its inclusion within a plant's TS. 10 CFR 50.36(b) states:

"Each license authorizing operation of a production or utilization facility of a type described in § 50.21 or§ 50.22 will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to§ 50.34."

E-2 of 5

Enclosure to NL-24-0306 Evaluation of Proposed Change 10 CFR 50.36(c) states the "Technical specifications will include items in the following categories:... " Review of 10 CFR 50.36(c) indicates that neither a TOC nor a list of effective pages were listed in the regulation as a category of information to be included. The list of effective pages was not issued with the original Appendix A and is currently maintained by SNC.

The TOC references the page number of each specification in the TS and does not contain any technical information required by 10 CFR 50.36 but is simply a listing of the included specifications to facilitate their usage. Since the TOC does not include information required to be in the TS by 10 CFR 50.36, inclusion of a TOC within the TS is optional and removal of the TOC from the TS is an administrative change.

Additionally, the "Writer's Guide for Plant-Specific Improved Technical Specifications"'

(TSTF-GG-05-01, Revision 1 [ML060720511]) was reviewed for guidance. The writer's guide refers to the TOC as "Technical Specification Front Matter," which also includes the title page and list of effective pages. These portions of the TS related documentation are described as "not part of the Technical Specifications" and, therefore, can be placed under licensee control as proposed in this amendment request.

Placing the TS TOC maintenance under SNC control allows the TOC to be issued by SNC in conjunction with the implementation of NRC-approved TS amendments that alter the TOC, just as the title page and list of effective pages are currently maintained and issued by SNC.

This change is consistent with a previously approved amendment for other SNC plants, and for other industry plants, as identified in Section 4.2, Precedent.

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria 10 CFR 50.36 contains requirements for what is to be included in a licensee's TS. The TOC, which contains only reference information, is not required to be in the TS per the requirements of 10 CFR 50.36.

4.2 Precedent Southern Nuclear Company license amendment was issued on September 29, 2021, "Issuance of Amendments Regarding Removal of Table of Contents from the Technical Specifications."

[ML21232A149] This license amendment approved the removal of the TOC from the TS, for Joseph M. Farley Nuclear Plant, Units 1 and 2, VEGP, Units 1 and 2, and Edwin I. Hatch Nuclear Plant, Units 1 and 2, similar to this request.

Exelon Generating Company license amendment was issued on December 18, 2019, "Issuance of Amendments to Remove Table of Contents from Technical Specifications." [ML19302E700]

This license amendment approved the removal of the TOC from the TS of several plants in the Exelon fleet, similar to this request.

Point Beach Nuclear Plant license amendment was issued on October 11, 2011, "Issuance of Amendment re: Request to Remove the Table of Contents from the Technical Specifications."

E-3 of 5

Enclosure to NL-24-0306 Evaluation of Proposed Change

[ML112640016] This license amendment approved the removal of the TOC from the Point Beach TS, similar to this request.

4.3 Significant Hazards Evaluation Southern Nuclear Operating Company (SNC) is requesting an amendment to the Technical Specifications (TS) to remove the table of contents from the NRC issued document.

SNC has evaluated the proposed change to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed change do not involve a significant hazards consideration, as discussed below.

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The proposed change is administrative and affects responsibility for the control of the TOC.

Transferring control of TOC changes to the licensee does not affect the operation, physical configuration, or function of plant equipment or systems. It does not impact the initiators or assumptions of analyzed events; nor does it impact the mitigation of accidents or transient events. The change involves no increase in the probability or consequences of an accident.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed change does not alter the plant configuration, require installation of new equipment, alter assumptions about previously analyzed accidents, or impact the operation or function of plant equipment or systems.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No The proposed change does not impact any safety assumptions or have the potential to reduce a margin of safety as described in the TS Bases.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

E-4 of 5

Enclosure to NL-24-0306 Evaluation of Proposed Change Based upon the reasoning presented above, SNC concludes that the requested change involves no significant hazards consideration, as set forth in 10 CFR 50.92(c), "Issuance of Amendment."

4.4 Conclusions In conclusion, based on considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or the health and safety of the public.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes requirements with respect to the format of the license or otherwise makes editorial, corrective, or other minor changes. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10)(v). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.

E-5 of 5

ATTACHMENT to NL-24-0306 Proposed Technical Specification Change (Mark-ups)

License Amendment Request:

Remove Technical Specifications Table of Contents

I:

1:

I:

1:

I:

1:

I:

1:

I:

I*

I*

1:

1:

1:

1:

1:

1:

1:

I:

11 I:

11 I:

II

I:

1:

I:

1:

I:

1:

i: 4 :m 1:

1:

1:

1:

1:

1:

1:

I I:

11 I:

11 I:

11 I:-~ i 11

~ I

Technical Specifications TABLE OF CONTENTS Page 3.3.8 3.3.Q 3.3.10 3.3.11 3.3.12 3.3.13 3.3.14 3.3.15 3.3.16 3.3.17 3.3.18 3.3.19 3.3.20 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.4.8 3.4.Q 3.4.10 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15 3.4.16 3.4.17 l~JSTRUMENTATION (continued)

Engineered Saf.ety Feature Actuation System (ES FAS)

Instrumentation................................................................................... 3.3.8 1 Engineered Saf.ety Feature Actuation System (ES FAS)

Manual Initiation.................................................................................. 3.3.Q 1 Engineered Saf.ety Feature Actuation System (ES FAS)

Reactor Coolant System (RCS) Hot Leg Le1,el lnstrumentation......... 3.3.10 1 Engineered Saf.ety Feature Actuation System (ES FAS)

Startup Feed1.Yater Flmv Instrumentation........................................... 3.3.11 1

Engineered Saf.ety Feature Actuation System (ES FAS)

Reactor Trip Initiation........................................................................ 3.3.12 1 Engineered Saf.ety Feature Actuation System (ES FAS)

Main Control Room Isolation, Air Supply Initiation, and Electrical Load De energiZ!:ation......................................................... 3.3.13 1 Engineered Saf.ety Feature Actuation System (ES FAS)

In containment Refueling Water Storage Tank (IRWST) and Spent Fuel Pool Level Instrumentation....................................... 3.3.14 1

Engineered Saf.ety Feature Actuation System (ES FAS)

Actuation Logic Operating.............................................................. 3.3.15 1 Engineered Saf.ety Feature Actuation System (ES FAS)

Actuation Logic Shutdown.............................................................. 3.3.16 1 Post Accident Monitoring (PAM) lnstrumentation..................................... 3.3.17 1 Remote Shutdown Workstation (RSW)................................................... 3.3.18 1 Di1,erse Actuation System (DAS) Manual Controls................................. 3.3.1 Q 1 Automatic DepressuriZ!:ation System (ADS) and In containment Refueling VVater Storage Tank (IRWST) Injection Blocking Device... 3.3.20 1

REACTOR COOLANT SYSTEM (RCS)

RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (D~JB) Limits............................................................. 3.4.1 1

RCS Minimum Temperature for Criticality.................................................. 3.4.2 1 RCS Pressure and Temperature (PIT) Limits............................................ 3.4.3 1 RCS Loops............................................................................................... 3.4.4 1

PressuriZ!:er................................................................................................ 3.4.5 1 PressuriZ!:er Safety \\lal1,es......................................................................... 3.4.6 1 RCS Operational LE/\\KAGE..................................................................... 3.4.7 1 Minimum RCS Flow.................................................................................. 3.4.8 1 RCS Leakage Detection Instrumentation.................................................. 3.4.Q 1

RCS SpecificActii,ity............................................................................... 3.4.10 1 Automatic DepressuriZ!:ation System (ADS)

Operating.......................... 3.4.11 1

Automatic DepressuriZ!:ation System (ADS)

Shutdown, RCS Intact...... 3.4.12 1 Automatic DepressuriZ!:ation System (ADS)

Shutdown, RCS Open...... 3.4.13 1 Low Temperature Overpressure Protection (LTOP)................................. 3.4.14 1

RCS Pressure Isolation Valve (PIV) lntegrity........................................... 3.4.15 1 Reactor Vessel Head Vent (RVHV)......................................................... 3.4.16 1 Steam Generator (SG) Tube lntegrity...................................................... 3.4.17 1

\\lEGP Units 3 and 4 ii Amendment No.150 (Unit 3)

Amendment No.149 (Unit 4)

Technical Specifications TABLE OF CONTENTS Page 3.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 3.5.8 3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.Q 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 3.7.8 3.7.Q 3.7.10 3.7.11 3.7.12 3.7.13 PASSIVE CORE COOLl~JG SYSTEM (PXS)

,A,ccumulators............................................................................................ 3.5.1 1

Core Makeup Tanks (CMTs)

Operating.................................................. 3.5.2 1 Core Makeup Tanks (CMTs)

Shutdown, RCS Intact............................... 3.5.3 1 Passi1,e Residual Heat Remo1,al Heat Exchanger (PRHR FIX)

Operating............................................................................................ 3.5.4 1

Passi1,e Residual Heat Remo1,al Heat Exchanger (PRHR FIX)

Shutdown, Reactor Coolant System (RCS) Intact............................... 3.5.5 1 In containment Refueling Water Storage Tank (IRWST)

Operating............................................................................................ 3.5.6 1 In containment Refueling Water Storage Tank (IRWST)

Shutdoi.vn, MODE 5............................................................................ 3.5.7 1 In containment Refueling Water Storage Tank (IRWST)

Shutdown, MODE 6............................................................................ 3.5.8 1 CONTAINME~JT SYSTEMS Containment............................................................................................. 3.6.1 1

Containment Air Locks.............................................................................. 3.6.2 1 Containment Isolation Val1,es.................................................................... 3.6.3 1 Containment Pressure.............................................................................. 3.6.4 1

Containment Air Temperature.................................................................... 3.6.5 1 Passi1,e Containment Cooling System (PCS)............................................ 3.6.6 1 Containment Penetrations......................................................................... 3.6.7 1 pH Adjustment.......................................................................................... 3.6.8 1 Vacuum Relief Val1,es............................................................................... 3.6.Q 1 PLA~JT SYSTEMS Main Steam Safety Valves (MSSVs)......................................................... 3.7.1 1

Main Steam Line Flow Path Isolation Valves............................................. 3.7.2 1 Main Feedwater Isolation Val1,es (MFIVs) and Main Feedwater Control Valves (MFCVs)...................................................................... 3.7.3 1 Secondary Specific Activity....................................................................... 3.7.4 1

Spent Fuel Pool \\/\\later Le1,el..................................................................... 3.7.5 1 Main Control Room Habitability System (VES).......................................... 3.7.6 1 Startup Feedwater Isolation and Control Valves........................................ 3.7.7 1 Main Steam Line Leakage........................................................................ 3.7.8 1 Not Used................................................................................................... 3.7.Q 1 Steam Generator (SG) Isolation Valves.................................................. 3.7.10 1 Spent Fuel Pool Boron Concentration..................................................... 3.7.11 1

Spent Fuel Pool Storage........................................................................ 3.7.12 1

Spent Fuel Pool Cooling System (SFS)

Containment Isolation Valves............................................................ 3.7.13 1 VEGP Units 3 and 4 iii Amendment No.194 (Unit 3)

Amendment No.191 (Unit 4)

Technical Specifications TABLE OF CONTENTS Page 3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 3.9 3.9.1 3.9.2 3.9.3 3.9.4 3.9.5 4.0 4.1 4.1.1 4.1.2 4.2 4.2.1 4.2.2 4.3 4.3.1 4.3.2 4.3.3 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 ELECTRIC/\\L POWER SYSTEMS DC Sources Operating........................................................................... 3.8.1 1

DC Sources Shutdoi.vn........................................................................... 3.8.2 1 ln1,erters Operating................................................................................ 3.8.3 1 ln1,erters Shutdown................................................................................ 3.8.4 1

Distribution Systems Operating.............................................................. 3.8.5 1 Distribution Systems Shutdown.............................................................. 3.8.6 1 Battery Parameters................................................................................... 3.8.7 1 REFUELING OPERATIONS Boron Concentration................................................................................. 3.9.1 1

Unborated \\'1/43ter Source Flow Paths........................................................ 3.9.2 1 Nuclear Instrumentation............................................................................ 3.9.3 1 Refueling Cavity V\\later Level.................................................................... 3.9.4 1

Decay Time............................................................................................... 3.9.5 1 DESIGN FEATURES Site.................................................................................................................... 4.0 1

Site and Exclusion Boundaries..................................................................... 4.0 1 Low Population Zone (LPZ)......................................................................... 4.0 1 Reactor Core..................................................................................................... 4.0 1 Fuel,A,ssemblies........................................................................................... 4.0 1 Control Rod and Gray Rod Assemblies........................................................ 4.0 1 Fuel Storage...................................................................................................... 4.0 2 Criticality...................................................................................................... 4.0 2 Drainage...................................................................................................... 4.0 3 Capacity....................................................................................................... 4.0 3 ADMIN ISTRA,TIVE CONTROLS Responsibility.................................................................................................... 5.1 1

Organieation...................................................................................................... 5.2 1 Unit Staff Qualifications...................................................................................... 5.3 1 Procedures........................................................................................................ 5.4 1

Programs and Manuals...................................................................................... 5.5 1 Reporting Requirements.................................................................................... 5.6 1 High Radiation Area........................................................................................... 5.7 1 VEGP Units 3 and 4 j\\l Amendment No. 13 (Unit 3)

Amendment No. 13 (Unit 4)