Attachment 2 to ULNRC-06916 Proposed Technical Specification Clean Pages (7 pages follow this cover page)

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-7 Amendment No.

SR 3.8.1.2


NOTES --------------------------------

1.

Performance of SR 3.8.1.7 satisfies this SR.

2.

All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

3.

A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.

Verify each DG starts from standby conditions and achieves steady state voltage 3740V and 4320 V and frequency  Hzand 6Hz.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.7

127(6

All DG starts may be preceded by an engine prelube period.



Verify each DG starts from standby condition and achieves:

D

In d 12 seconds, voltage t 3740 V and

Irequencyt 58.8 Hz; and E

Steady state voltage t 3740 V and d 4320 V 

andfrequency t 59.7 Hz and d 60.3 Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.8 Not used.

SR 3.8.1.9 Not used.

SR 3.8.1.10 Verify each DG operating at a power factor d 0.9 and t 0.8 does not trip and voltage is maintained d 4784 V and frequency is maintained d 65.4 Hz during and following a load rejection of t 5580 kW and d 6201 kW.

In accordance with the Surveillance Frequency Control Program (continued)

CALLAWAY PLANT 3.8-9 Amendment No.

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-10 Amendment No.

SR 3.8.1.11


NOTES --------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enh anced.

Verify on an actual or simulated loss of offsite power signal:

D

De-energization of emergency buses; E

Load shedding from emergency buses; F

DG auto-starts from standby condition and:



energizes permanently connected loads in 12 seconds,



energizes auto-connected shutdown loads through the shutdown load sequencer,



maintains steady state voltage 3740V and 4320 V,



maintains steady state frequency 5Hz and 6Hz, and



supplies permanently connected and auto-connected shutdown loads for 5minutes.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.12

127(6



All DG starts may be preceded by prelube period.



This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.



Verify on an actual or simulated safety injection signal each DG auto-starts from standby condition and:

a.

In d 12 seconds after auto-start and during tests, achieves voltage t 3740 V and frequency t58.8 Hz; b.

Achieves steady state voltage t3740 V and d 4320 V and frequency t 59.7 Hz and d 60.3 Hz; c.

Operates for t 5 minutes; d.

Permanently connected loads remain energized from the offsite power system; and e.

Emergency loads are auto-connected and energized through the LOCA load sequencer from the offsite power system.

In accordance with the Surveillance Frequency Control Program (continued)

CALLAWAY PLANT 3.8-11 Amendment No.

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.14

NOTES

1.

Momentary transients outside the load and power factor ranges do not invalidate this test.

2.

The DG may be loaded to t 5580 kW and d 6201 kW for the entire test period if auto-connected design loads are less than 6201 kW.



Verify each DG operating at a power factor d 0.9 and t 0.8 operates for t 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For t 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded t 6600 kW and d 6821 kW; and b.

For the remaining hours of the test loaded t 5580 kW and d 6201 kW.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.15

127(6

1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated t 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded t 5580 kW and d 6201 kW. Momentary transients outside of load range do not invalidate this test.
2. All DG starts may be preceded by an engine prelube period.



Verify each DG starts and achieves:

D

In d 12 seconds, voltage t 3740 V and frequency t 58.8 Hz; and E

Steady state voltage t 3740 V and d 4320 V and frequency t59.7Hzandd 60.3 Hz.

,QDFFRUGDQFH

ZLWKWKH

6XUYHLOODQFH

)UHTXHQF\\

&RQWURO3URJUDP (continued)

CALLAWAY PLANT 3.8-13 Amendment No.

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-16 Amendment No.

SR 3.8.1.19


NOTES --------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Safety Injection signal:

In accordance with the Surveillance Frequency Control Program D

De-energization of emergency buses; E

Load shedding from emergency buses; and F

DG auto-starts from standby condition and:



energizes permanently connected loads in 12seconds,



energizes auto-connected emergency loads through LOCA load sequencer,



achieves steady state voltage 3740V and 4320V,



achieves steady state frequency 5Hz and 6Hz, and



supplies permanently connected and auto-connected emergency loads for 5minutes.

(continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-17 Amendment No.

SR 3.8.1.20


NOTE -------------------------------

All DG starts may be preceded by an engine prelube period.



9HULI\\ZKHQVWDUWHGVLPXOWDQHRXVO\\IURPVWDQGE\\

FRQGLWLRQHDFK'*DFKLHYHV

D

,QVHFRQGVYROWDJH9DQG IUHTXHQF\\+]DQG E

6WHDG\\VWDWHYROWDJH9DQG9 DQGIUHTXHQF\\+]DQG+]

In accordance with the Surveillance Frequency Control Program SR 3.8.1.21


NOTE -------------------------------

The continuity check may be excluded from the actuation logic test.

Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.

In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY