ML25058A158
| ML25058A158 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/27/2025 |
| From: | Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML25058A155 | List: |
| References | |
| ULNRC-06916 | |
| Download: ML25058A158 (1) | |
Text
Attachment 1 to ULNRC-06916 Proposed Technical Specification Page Markups (7 pages follow this cover page)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-7 Amendment No. 202 SR 3.8.1.2
NOTES --------------------------------
1.
Performance of SR 3.8.1.7 satisfies this SR.
2.
All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
3.
A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
Verify each DG starts from standby conditions and achieves steady state voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY 59.7 60.3
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-9 Amendment No. 202 SR 3.8.1.7
NOTE -------------------------------
All DG starts may be preceded by an engine prelube period.
Verify each DG starts from standby condition and achieves in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.8 Not used.
SR 3.8.1.9 Not used.
SR 3.8.1.10 Verify each DG operating at a power factor 0.9 and 0.8 does not trip and voltage is maintained 4784 V and frequency is maintained 65.4 Hz during and following a load rejection of 5580 kW and 6201 kW.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY 59.7 60.3 D,n12seconds, voltage3740Vand frequency58.8Hz,and E 6teadystate
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-10 Amendment No. 202 SR 3.8.1.11
NOTES --------------------------------
1.
All DG starts may be preceded by an engine prelube period.
2.
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated loss of offsite power signal:
a.
De-energization of emergency buses; b.
Load shedding from emergency buses; c.
DG auto-starts from standby condition and:
1.
energizes permanently connected loads in 12 seconds, 2.
energizes auto-connected shutdown loads through the shutdown load sequencer, 3.
maintains steady state voltage 3740 V and 4320 V, 4.
maintains steady state frequency 58.8 Hz and 61.2 Hz, and 5.
supplies permanently connected and auto-connected shutdown loads for 5 minutes.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY 59.7 60.3
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-11 Amendment No. 202 SR 3.8.1.12
NOTES --------------------------------
1.
All DG starts may be preceded by prelube period.
2.
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated safety injection signal each DG auto-starts from standby condition and:
a.
In 12 seconds after auto-start and during tests, achieves voltage 3740 V and 4320 V; b.
In 12 seconds after auto-start and during tests, achieves frequency 58.8 Hz and 61.2 Hz; c.
Operates for 5 minutes; d.
Permanently connected loads remain energized from the offsite power system; and e.
Emergency loads are auto-connected and energized through the LOCA load sequencer from the offsite power system.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY 59.7 60.3 frequency 58.8 Hz Achieves steady state voltage 3740 V and 4320 V and
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-13 Amendment No. 202 SR 3.8.1.14
NOTES --------------------------------
1.
Momentary transients outside the load and power factor ranges do not invalidate this test.
2.
The DG may be loaded to 5580 kW and 6201 kW for the entire test period if auto-connected design loads are less than 6201 kW.
Verify each DG operating at a power factor 0.9 and 0.8 operates for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
a.
For 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 6600 kW and 6821 kW; and b.
For the remaining hours of the test loaded 5580 kW and 6201 kW.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.15
NOTES --------------------------------
1.
This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 5580 kW and 6201 kW. Momentary transients outside of load range do not invalidate this test.
2.
All DG starts may be preceded by an engine prelube period.
Verify each DG starts and achieves, in 12 seconds, voltage 3740 V, and 4320 V and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY 59.7 60.3 D,n12seconds, voltage3740Vand frequency58.8Hz,and E 6teadystate
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-16 Amendment No. 202 SR 3.8.1.19
NOTES --------------------------------
1.
All DG starts may be preceded by an engine prelube period.
2.
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Safety Injection signal:
a.
De-energization of emergency buses; b.
Load shedding from emergency buses; and c.
DG auto-starts from standby condition and:
1.
energizes permanently connected loads in 12 seconds, 2.
energizes auto-connected emergency loads through LOCA load sequencer, 3.
achieves steady state voltage 3740 V and 4320 V, 4.
achieves steady state frequency 58.8 Hz and 61.2 Hz, and In accordance with the Surveillance Frequency Control Program 5.
supplies permanently connected and auto-connected emergency loads for 5 minutes.
(continued)
SURVEILLANCE FREQUENCY 59.7 60.3
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-17 Amendment No. 202 SR 3.8.1.20
NOTE -------------------------------
All DG starts may be preceded by an engine prelube period.
Verify when started simultaneously from standby condition, each DG achieves, in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.21
NOTE -------------------------------
The continuity check may be excluded from the actuation logic test.
Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.
In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY 59.7 60.3
- a. In 12 seconds, voltage 3740 V and frequency 58.8 Hz, and
- b. Steady state