ML24355A004
| ML24355A004 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/19/2024 |
| From: | Mahesh Chawla NRC/NRR/DORL/LPL4 |
| To: | Elwood T Ameren Missouri |
| References | |
| L-2024-LLA-0165 | |
| Download: ML24355A004 (3) | |
Text
From:
Mahesh Chawla Sent:
Thursday, December 19, 2024 6:16 PM To:
Elwood, Thomas B Cc:
Tony Nakanishi; Chris Rojas; Khadijah West; Shivani Mehta (She/Her); Ami Agrawal; Michael Bloodgood; Scott Schwind (He/Him); Nathan Brown
Subject:
LIC-109 Acceptance email - Callaway - Adoption of TSTF-591, RICT Program (CLIIP) - EPID: L-2024-LLA-0165
Dear Mr. Elwood,
By letter dated December 5, 2024 (Agencywide Documents Access and Management System Accession Package No. ML24340A175), Ameren Missouri (Union Electric Company) (the licensee) submitted a license amendment request (LAR) for Callaway Plant, Unit 1(Callaway).
The proposed amendment requests adoption of TSTF-591, "Revise Risk Informed Completion Time (RICT) Program," which is an approved change to the Standard Technical Specifications (STS), into the Callaway Plant, Unit 1 Technical Specifications. TSTF-591 revises Technical Specification (TS) Section 5.5, "Risk Informed Completion Time Program," to reference Regulatory Guide (RG) 1.200, Revision 3, instead of Revision 2, and to make other changes. A new report is added to TS Section 5.6, "Reporting Requirements," to inform the NRC of newly developed methods used to calculate RICTs.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the TS) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 6 months, which is June 30, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes,
along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information (RAI), unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Mahesh(Mac) Chawla, Project Manager Licensing Branch LPL4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8371 Email: Mahesh.Chawla@nrc.gov
Hearing Identifier:
NRR_DRMA Email Number:
2675 Mail Envelope Properties (SJ0PR09MB10405FE06208C93782C855747F1062)
Subject:
LIC-109 Acceptance email - Callaway - Adoption of TSTF-591, RICT Program (CLIIP) - EPID L-2024-LLA-0165 Sent Date:
12/19/2024 6:15:42 PM Received Date:
12/19/2024 6:15:00 PM From:
Mahesh Chawla Created By:
Mahesh.Chawla@nrc.gov Recipients:
"Tony Nakanishi" <Tony.Nakanishi@nrc.gov>
Tracking Status: None "Chris Rojas" <Christopher.Rojas@nrc.gov>
Tracking Status: None "Khadijah West" <Khadijah.West@nrc.gov>
Tracking Status: None "Shivani Mehta (She/Her)" <Shivani.Mehta@nrc.gov>
Tracking Status: None "Ami Agrawal" <ami.agrawal@nrc.gov>
Tracking Status: None "Michael Bloodgood" <Michael.Bloodgood@nrc.gov>
Tracking Status: None "Scott Schwind (He/Him)" <Scott.Schwind@nrc.gov>
Tracking Status: None "Nathan Brown" <Nathan.Brown@nrc.gov>
Tracking Status: None "Elwood, Thomas B" <TElwood@ameren.com>
Tracking Status: None Post Office:
SJ0PR09MB10405.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3969 12/19/2024 6:15:00 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: