Cover Letter - Request of Supplemental Information of Framatomes Application for a License Amendment B
ML24348A193
Person / Time
Site: Framatome ANP Richland
Issue date: 01/06/2025
From: Stephen Poy
NRC/NMSS/DFM/FFLB
To: Travis Tate
Framatome
Shared Package
ML24348A192 List:
References
EPID L-2024-LLA-0130
Download: ML24348A193 (1)


Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Timothy J. Tate, Manager Environmental, Safety, Health, and Licensing Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354-5102

SUBJECT:

REVIEW OF FRAMATOME INC.S LICENSE AMENDMENT SUBMITTAL TO AUTHORIZE TRISO FUEL FABRICATION IN THE SPECIALTY FUELS BUILDING AT THE FRAMATOME FUEL FABRICATION FACILITY IN RICHLAND, WA -

REQUEST FOR SUPPLEMENTAL INFORMATION - ENTERPRISE PROJECT IDENTIFIER NUMBER L-2024-LLA-0130

Dear Timothy J. Tate:

The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated September 20, 2024 (Agencywide Documents Access and Management System [ADAMS]

No. ML24264A170), transmitting your request to authorize Tri-structural Isotropic (TRISO) fuel fabrication in the Specialty Fuels Building at the Framatome Fuel Fabrication Facility in Richland, WA.

The NRC staff performed an acceptance review of your application to determine if the application contains sufficient technical information in scope and depth to allow the staff to proceed with the detailed technical review. This letter is to advise you that, based on our review, your submittal does not contain sufficient technical information. Therefore, the NRC staff will not proceed with detailed technical review of Framatomes submittal until the supplemental information discussed in the enclosure to this letter is provided.

This letter confirms our discussions during the January 6, 2025, teleconference with respect to Framatomes application and the supplemental information needed to proceed with its review.

As discussed during the call, we request that the supplemented application be provided within 60 days from the date of this letter.

In accordance with Title 10 of the Code of Federal Regulations Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. The NRCs ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.

January 6, 2025

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION T. Tate 2

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION If you have any questions regarding this communication, please contact me at 301-415-7135 or via email to stephen.poy@nrc.gov.

Sincerely, Stephen Poy, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 70-1257 License No.: SNM-1227

Enclosure:

Request for Supplemental Information Signed by Poy, Stephen on 01/06/25

ML24348A192 (pkg), ML24348A193 (ltr), ML24348A194 (encl)

OFFICE NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NAME SPoy OSiuranoPerez JGoodridge JDowns SPoy DATE 12/13/2024 12/15/2024 12/23/2024 12/31/2024 01/06/2025